Indian Railways Thread (Dec 2015)

The Technology & Economic Forum is a venue to discuss issues pertaining to Technological and Economic developments in India. We request members to kindly stay within the mandate of this forum and keep their exchanges of views, on a civilised level, however vehemently any disagreement may be felt. All feedback regarding forum usage may be sent to the moderators using the Feedback Form or by clicking the Report Post Icon in any objectionable post for proper action. Please note that the views expressed by the Members and Moderators on these discussion boards are that of the individuals only and do not reflect the official policy or view of the Bharat-Rakshak.com Website. Copyright Violation is strictly prohibited and may result in revocation of your posting rights - please read the FAQ for full details. Users must also abide by the Forum Guidelines at all times.
chetak
BRF Oldie
Posts: 32402
Joined: 16 May 2008 12:00

Re: Indian Railways Thread (Dec 2015)

Post by chetak »

rajkumar wrote:
nam wrote:Finally a modern train is going to be manufactured fully in India. Now even if Bombardier leaves, the ecosystem can be used to build our trainset.

Capital city of the states can induct some of these trains on the existing trainlines.
Nam, these trainsets can't be used on the IR network. The RRTS system is a standard gauge as opposed to Indian Railways broad gauge.
why do you think that bombardier would readily not adapt their trainset to the IR network if required.

if they don't, then they simply don't sell to the IR.
Aditya_V
BRF Oldie
Posts: 14354
Joined: 05 Apr 2006 16:25

Re: Indian Railways Thread (Dec 2015)

Post by Aditya_V »

I was thinking about it, is bombardier Railway linked to extension of Delhi Metro system which runs on Standard gauge?
nam
BRF Oldie
Posts: 4712
Joined: 05 Jan 2017 20:48

Re: Indian Railways Thread (Dec 2015)

Post by nam »

Private entrants using IR tracks would probably go for these trainset with the required modification. They are modern and produced in India, so cheaper to operate as well.
chetak
BRF Oldie
Posts: 32402
Joined: 16 May 2008 12:00

Re: Indian Railways Thread (Dec 2015)

Post by chetak »

who knew.............. 8)


Image
kvraghav
BRFite
Posts: 1136
Joined: 17 Apr 2008 11:47
Location: Some where near the equator

Re: Indian Railways Thread (Dec 2015)

Post by kvraghav »

^^^
Which means more chances of missing my stop.
sankum
BRFite
Posts: 1150
Joined: 20 Dec 2004 21:45

Re: Indian Railways Thread (Dec 2015)

Post by sankum »

My pulse is 88. Therefore I don't get sound sleep in train. :rotfl:
Rohit_K
BRFite
Posts: 630
Joined: 09 Nov 2006 22:53
Location: atop Sukkur Barage

Re: Indian Railways Thread (Dec 2015)

Post by Rohit_K »

Work has started on dilli's second RRTS line

KEC Begins Construction on Delhi – Alwar RRTS’ Gurgaon Section
Workers from KEC – CCECC JV and Pinnacle Piling have quietly started piling work near Gurgaon’s Atul Kataria Chowk for constructing the National Capital Region’s second Regional Rapid Transit System (RRTS) line connecting Delhi – Gurugram – SNB (Shahjahanpur – Neemrana – Behrod) through a 106.5 km mostly elevated line with 16 stations.

Like the 82.15 km Delhi – Meerut RRTS line, the Delhi – SNB RRTS line will also have a design speed of 180 km per hour and an operating speed of 160 km per hour. In the future, it will be extended further southward to Sotanala by 35 km and to Alwar by 58 km.
Image

More images: https://themetrorailguy.com/2020/09/29/ ... n-section/
CalvinH
BRFite
Posts: 1098
Joined: 15 Jul 2007 04:14

Re: Indian Railways Thread (Dec 2015)

Post by CalvinH »

Rohit_K wrote:Work has started on dilli's second RRTS line

KEC Begins Construction on Delhi – Alwar RRTS’ Gurgaon Section
Workers from KEC – CCECC JV and Pinnacle Piling have quietly started piling work near Gurgaon’s Atul Kataria Chowk for constructing the National Capital Region’s second Regional Rapid Transit System (RRTS) line connecting Delhi – Gurugram – SNB (Shahjahanpur – Neemrana – Behrod) through a 106.5 km mostly elevated line with 16 stations.

Like the 82.15 km Delhi – Meerut RRTS line, the Delhi – SNB RRTS line will also have a design speed of 180 km per hour and an operating speed of 160 km per hour. In the future, it will be extended further southward to Sotanala by 35 km and to Alwar by 58 km.
why do they need elevated tracks in this section? It will just increase the cost.
Vips
BRF Oldie
Posts: 4699
Joined: 14 Apr 2017 18:23

Re: Indian Railways Thread (Dec 2015)

Post by Vips »

Indian Railways creates another record! RCF rolls out its highest number of LHB coaches in a month.

The coach manufacturing factory of Indian Railways has achieved the highest ever Linke Hofmann Busch (LHB) coaches roll out. According to details shared by the national transporter, in the financial year 2020-21, the Rail Coach Factory has manufactured as many as 152 LHB train coaches in the month of September. In the last financial year of 2019-20, the Rail Coach Factory had manufactured 69 LHB coaches during the same month. The LHB train coaches were introduced on the Indian Railways network for the first time in the year 2000.

According to details shared by the national transporter, in the financial year 2019-20, the Rail Coach Factory had manufactured 34 LHB coaches in April, 63 LHB coaches in May, 61 LHB coaches in June, 65 LHB coaches in July, 74 LHB coaches in August, 69 LHB coaches in September, 71 LHB coaches in October, 79 LHB coaches in November, 92 LHB coaches in December, 103 LHB coaches in January, 101 LHB coaches in February, 116 LHB coaches in March. While in the financial year 2020-21 so far, the Rail Coach Factory had manufactured 2 LHB coaches in April, 48 LHB coaches in May, 107 LHB coaches in June, 151 LHB coaches in July, 141 LHB coaches in August, and a total of 152 LHB coaches in September.

Unlike Integral Coach Factory (ICF)- design train coaches, the modern LHB coaches that are based on German technology, supports higher carrying capacity and higher speed potential. Also, LHB train coaches are lighter in weight and boast anti-climbing features, which prevents them from getting piled up during rail accidents. The first 100 per cent ‘Make in India’ LHB train coach was manufactured in the year 2017 by ICF, Chennai.
Vips
BRF Oldie
Posts: 4699
Joined: 14 Apr 2017 18:23

Re: Indian Railways Thread (Dec 2015)

Post by Vips »

Despite COVID-19 restrictions, Indian Railways CLW produces 135 locomotives in 119 working days.

Indian Railways’ Chittaranjan Locomotive Works produces a total of 40 electric locomotives in September 2020! With this, the locomotive manufacturing factory has produced as many as 135 locomotives in the year 2020-21 in a period of just 119 working days. Interestingly, according to the details shared by the national transporter, this figure was achieved by the Chittaranjan Locomotive Works (CLW) as against 135 number of locomotives produced in 122 working days in the year 2019-20. The CLW achieved this figure despite the lockdown in the months of April and May as well as the ongoing COVID-19 pandemic related restrictions.

According to details shared by Indian Railways, in the financial year 2019-20, the CLW produced as many as 50 locomotives in 56 working days (achieved on 7 June 2019), 100 number of locomotives in 97 working days (achieved on 25 July 2019), and a total of 135 locomotives in 122 working days (achieved on 24 August 2019). While in the financial year 2020-21, the CLW manufactured 50 number of locomotives in 70 working days (achieved on 22 July 2020), as many as 100 locomotives in 102 working days (achieved on 8 September 2020) and a total of 135 locomotives in 119 working days (achieved on 30 September 2020).

Despite the COVID-19 related restrictions coming into force on 21 March 2020, the CLW had created another record in producing the highest number of locos. During the fiscal year 2019-20, the locomotive manufacturing factory produced a total of 431 locos. Interestingly, the factory had surpassed its own record of producing a total of 402 number of locos in the financial year 2018-19, which was recognized as a World Record by the Limca Book of Records. The factory manufactured 250 electric locos in 2014-15, 280 locos in 2015-16, 292 locos in 2016-17, 350 locos in 2017-18, 402 locos in 2018-19.
rajkumar
BRFite
Posts: 430
Joined: 22 Sep 2000 11:31
Location: London U.K
Contact:

Re: Indian Railways Thread (Dec 2015)

Post by rajkumar »

CalvinH wrote:why do they need elevated tracks in this section? It will just increase the cost.
This is because of the cost of land acquisition in India is so high and takes so long. The NCR RRTS is being built in the median of existing highways and uses elevated tracks for most of the way apart from sections in Delhi which are being tunnelled.

I personally approve of this method of construction...given India's density of population we need a balance and while elevated tracks are more expensive they also have advantages the principal one is that we don't need to access control the tracks. Imagine having farm animals wondering onto the tracks when the train is travelling at 160 Kmph.
Rohit_K
BRFite
Posts: 630
Joined: 09 Nov 2006 22:53
Location: atop Sukkur Barage

Re: Indian Railways Thread (Dec 2015)

Post by Rohit_K »

Alstom & Siemens Bid for Delhi – Meerut RRTS’ Signalling System
https://themetrorailguy.com/2020/10/08/ ... ng-system/
Alstom and Siemens are the two firms that have submitted bids for providing the signaling, train control and telecommunication system (Package 24) of the under construction 82.15 km Delhi – Meerut RRTS Line, after officials from the National Capital Region Transport Corporation (NCRTC) opened tenders minutes ago to reveal its list of bidders.

Per the system specifications issued by NCRTC, the Delhi – Meerut RRTS line will be the first in India to adopt the European Train Control System (ETCS) Level 2 signalling system which is the core signalling and train control component of the European Rail Traffic Management System (ERTMS) of standards.
chetak
BRF Oldie
Posts: 32402
Joined: 16 May 2008 12:00

Re: Indian Railways Thread (Dec 2015)

Post by chetak »

rajkumar wrote:
CalvinH wrote:why do they need elevated tracks in this section? It will just increase the cost.
This is because of the cost of land acquisition in India is so high and takes so long. The NCR RRTS is being built in the median of existing highways and uses elevated tracks for most of the way apart from sections in Delhi which are being tunnelled.

I personally approve of this method of construction...given India's density of population we need a balance and while elevated tracks are more expensive they also have advantages the principal one is that we don't need to access control the tracks. Imagine having farm animals wondering onto the tracks when the train is travelling at 160 Kmph.
the land acquisition mess was a land mine insidiously planted by the BIF run NAC lobby to hobble the Modi govt.

they have succeeded spectacularly so far as this has become a major stumbling block in large projects and FDI has also been significantly affected because of this percieved lack of availability of viable land parcels to set up large industries.

big landholders and politicos are vehemently against any changes to the land acquisition bill as it has been drafted by the congis and it is the mafia famiglia's huge gift to the commies and naxals and the farmers have been fed stories of being paid many multiple times of the perceived value of the land in case of their land being taken over.

we need something like the eminient domain bill that the US has to acquire land for public projects like roads, railways, industrial estates and public spaces for the common good.
A Nandy
BR Mainsite Crew
Posts: 502
Joined: 06 Sep 2009 23:39

Re: Indian Railways Thread (Dec 2015)

Post by A Nandy »

https://indiainfrahub.com/2020/featured ... tion-work/
Bullet Train Project Gathers Steam; Invites Bids For Viaduct & Station Work

Gathering steam, the bullet train project has moved forward with firming up technical bids for corridor alignment and station building work amid the pandemic situation.

National High Speed Rail Corporation Limited has invited bids for design and construction of about 18 km of viaduct between Anand and Sabarmati including bullet train stations at Ahmedabad and Sabarmati for Mumbai-Ahmedabad High Speed Rail corridor.

The alignment also has 31 crossing bridges including six steel truss bridges.
A Nandy
BR Mainsite Crew
Posts: 502
Joined: 06 Sep 2009 23:39

Re: Indian Railways Thread (Dec 2015)

Post by A Nandy »

https://www.quora.com/How-is-Indian-Rai ... &srid=n0X6
How is Indian Railways generating revenue, since passenger services are heavily curtailed due to COVID-19?
Mollick.R
BRFite
Posts: 1033
Joined: 15 Aug 2016 10:26

Re: Indian Railways Thread (Dec 2015)

Post by Mollick.R »

Only AC coaches on trains running at over 130 kmph
TNN | Oct 12, 2020, 02.41 AM IST

NEW DELHI: Railways will phase out sleeper coaches on mail and express trains that will run at 130 kmph or above on its tracks. Such trains will have only AC coaches as it plans to upgrade the network.
.
.
...............
He added AC coaches have become a technical necessity wherever the speed of the train is going to be above 130 kmph. “Non-AC coaches will continue to run in trains running at 110 kmph…It will be ensured that while the price of tickets of modified AC coaches remains very affordable for the passengers, the comfort and conveniences increase manifold and there is substantial reduction in travel time,” he said. The spokesperson said currently an 83-berth coach is being designed. There is a plan to have 100 such coaches this year and 200 in the next year.


Officials said that the new AC coaches will be economical as their tickets will be priced between AC 3 and sleeper coaches. Compared to 72 berths in a sleeper coach, this new AC coach will have 83 berths, but the number of berths in a coupe will remain the same. However, there will be no extra middle berth between side-upper and side-lower berths. How ? Length of Coach is being increased ?? or Space near both toilet's end currently used for storing blanket etc will be used ??? :roll:

https://timesofindia.indiatimes.com/ind ... 610891.cms


Indian Railways To Replace Sleeper Coaches With New AC Coaches With 83 Berths In Coming Years
by Swarajya Staff-Oct 11, 2020 04:48 PM
https://swarajyamag.com/insta/indian-ra ... ming-years
arshyam
BRF Oldie
Posts: 4570
Joined: 11 Aug 2016 06:14

Re: Indian Railways Thread (Dec 2015)

Post by arshyam »

Mollick.R wrote: How ? Length of Coach is being increased ?? or Space near both toilet's end currently used for storing blanket etc will be used ???
I was wondering about this too - but there is a catch. The 72 berths is for the traditional "ICF" design coaches. LHB coaches are longer and so provide an extra bay with 8 berths (in SL), so that's 80 already. I believe they'll add a half-bay with 3 berths to this, hence 83. The half-bay is present in some older ICF 2A coaches next to the entrance - the other half is taken by some storage area (sheets and pillows?). Maybe LHB coaches have a similar arrangement, not sure. I sure hope they don't cut down on the toilets or the doors - it will become a comfort as well as a safety issue. The other option, is of course to bring back Laloo's infamous side-middle berths (shudder), and I am glad to see the article quoted some officials saying that it won't happen.
pandyan
BRFite
Posts: 472
Joined: 31 Jul 2006 05:12

Re: Indian Railways Thread (Dec 2015)

Post by pandyan »

Looks like we missed this Train 18 news. Whoever filed a false complaint ...will they face any music?
It is confusing why they are going after Mr. Shubhranshu with a fresh case.

https://twitter.com/SJha1618/status/1317055548714405888
W.r.t the Train-18 ICF investigation:
The CVC in a note said the clause “found to be restrictive by the Railway Board does not appear to be restrictive in view of the response received against the tenders".
There you have it folks.
...But what does this episode say about how India treats those who dare to innovate in the public sector?
CVC drops action against top officials of Train18 team ( September 15, 2020)
https://www.thehindu.com/news/national/ ... 613114.ece
According to sources in the Indian Railways, the CVC has advised that no action be taken against the then General Manager Sudanshu Mani; Principal Chief Mechanical Engineer Shubhranshu; Principal Chief Electrical Engineer N. K. Gupta; Chief Design Engineer S. P. Vavre; and others, who were facing allegations of irregularities in the purchase of three-phase propulsion equipment for Electrical Multiple Units (EMUs), Mainline Electrical Multiple Unit, and Train18 (Vande Bharat Express).
Fresh case
Meanwhile, the Vigilance Directorate of the Railway Board has initiated a fresh case against Mr. Shubhranshu, the officer whose name was dropped from the panel of officers approved by the Appointments Committee of the Cabinet for posting as a General Manager in the Zonal Railways.
ManuJ
BR Mainsite Crew
Posts: 442
Joined: 20 Jan 2004 12:31
Location: USA

Re: Indian Railways Thread (Dec 2015)

Post by ManuJ »

Indian bureaucracy is full of over-inflated egos and risk-averse brains.
The problem, as far as the Railway Board is concerned, is that Mr. Mani and his team tried to innovate and actually succeeded against all odds. That's an anomaly that has to be viewed with suspicion.
On top of that, they failed to give credit to the mighty board even as they stole the limelight and caught the imagination of the nation. Shame on them.
durairaaj
BRFite
Posts: 137
Joined: 11 Aug 2016 06:14

Re: Indian Railways Thread (Dec 2015)

Post by durairaaj »

Regarding Train 18 issue:
What no news article discusses is the role played by the CEO. The CEO is a post created by the present government and the person occupying the post is very close to administration and came from Electrical branch. His earlier posting was the Chairman of the board of railways. There is no discussion on his role in this train 18 saga by any of the newspapers.

In all other positive news, we read about his contributions or opinions such as in Railways electrification, Human resources improvement, train time table changes, railways freight transport increase, etc... But not in Train 18.

While the BJP government wants Atmanirbhar in all departments, with respect to train 18 it did not utter a single word. What was essentially an Indian design, that's working perfectly good without any glitch, has been discarded to dustbin and we are going rounds after rounds of tender issuals and dismissals.

Though Vande bharat (Train 18) is better than all of the other trains in Railways operation, we read more news on Tejas Express.

There is something more fishy in this witch hunting than usual scams, especially the role of current CEO and Railways minister's inaction.
arshyam
BRF Oldie
Posts: 4570
Joined: 11 Aug 2016 06:14

Re: Indian Railways Thread (Dec 2015)

Post by arshyam »

The railway minister has been particularly underwhelming. I wish we had Suresh Prabhu back in the ministry - he was the one who had given full backing to the T-18, IIRC.
darshhan
BRF Oldie
Posts: 2937
Joined: 12 Dec 2008 11:52

Re: Indian Railways Thread (Dec 2015)

Post by darshhan »

rajkumar wrote:
CalvinH wrote:why do they need elevated tracks in this section? It will just increase the cost.
This is because of the cost of land acquisition in India is so high and takes so long. The NCR RRTS is being built in the median of existing highways and uses elevated tracks for most of the way apart from sections in Delhi which are being tunnelled.

I personally approve of this method of construction...given India's density of population we need a balance and while elevated tracks are more expensive they also have advantages the principal one is that we don't need to access control the tracks. Imagine having farm animals wondering onto the tracks when the train is travelling at 160 Kmph.

I would like to add two more points to this.

1. Over the last two decades, many Indian companies have acquired the experience and machinery to execute such projects through metro contracts in various cities all over India. As such now they are able to give competitive rates for these projects. Lot of skilled manpower has been created. Lots of machinery has been amortized. Plus these companies have further created their own eco system of cost efficient vendors who provide specialized services.

2. Lot of sections both concrete as well as steel for eg viaduct sections, girders etc are all pre fabricated at some workshop away from construction site. This ensures better quality and cost. Also it ensures faster completion of project, thereby further reducing the costs.

At the end of day while elevated tracks might still be costlier than regular at grade level tracks from a construction viewpoint, the gap is now much closer than what it was two decades earlier. And as you rightly said taking into land acquisition and Right of Way issues into account, elevated tracks would be a better alternative. Remember technologies for both elevated sections and tunneling have improved by leaps and bounds in last 2-3 decades.
yensoy
BRF Oldie
Posts: 2494
Joined: 29 May 2002 11:31
Location: USA

Re: Indian Railways Thread (Dec 2015)

Post by yensoy »

Elevated tracks also takes care of all crossings - otherwise in the future there will be persistent asks for under/over bridges for which 50% of funds will need to be provided by railways, in addition to all operational headaches arising from construction.
A Nandy
BR Mainsite Crew
Posts: 502
Joined: 06 Sep 2009 23:39

Re: Indian Railways Thread (Dec 2015)

Post by A Nandy »

https://themetrorailguy.com/2020/10/19/ ... ackage-c4/
L&T Wins Mumbai – Ahmedabad HSR’s Package C4

Larsen & Toubro today emerged as the lowest bidder for constructing the 237.1 km Package C4 of the 508.17 km Mumbai – Ahmedabad High Speed Rail (MAHSR Bullet Train) project, after officials from the National High Speed Rail Corporation (NHSRCL) opened financial bids submitted by 3 infrastructure companies / consortia.

Package C4 represents 46.66% of the main-line making it the longest amongst all, and runs elevated from Zaroli Village on the Maharashtra – Gujarat border to Vadodara Station through 4 stations at Vapi, Bilimora, Surat and Bharuch in Gujarat.
chetak
BRF Oldie
Posts: 32402
Joined: 16 May 2008 12:00

Re: Indian Railways Thread (Dec 2015)

Post by chetak »

ITDC to take over Parliament canteen from Northern Railways

The Northern Railways will hand over the reins of the Parliament canteen to ITDC on November 15, bringing to an end its 52-year legacy of serving food to Parliamentarians.

A letter from the Lok Sabha Secretariat has asked the Northern Railways, which has been serving food in the canteen since 1968, to pack up and move on from the Parliament premises by that time.

The India Tourism Development Corporation (ITDC), the government’s tourism arm, runs the luxury five-star Ashok Group of hotels.

“The competent Authority has desired that the operations of the catering units in Parliament House Estate (Parliament House Parliament House Annexe & Parliament Library Building and paties mide and outside PHE providing services to dignitaries) be taken over by ITDC 15.11 2020,” the letter stated.

“The Northern Railway may, accordingly, hand over the electronic gadgets viz Computers Printer etc. provided by the Lok Sabha Secretariat to ITDC and furniture items, equipment gadgets etc to CPWD for being handed over by them to ITDC,” it said.

The process to find a new vendor was started last year and in July this year, Lok Sabha Speaker Om Birla met Tourism Minister Prahlad Patel and officials of ITDC to discuss the issue.

Officials at ITDC said they have been instructed to keep special focus on the quality of food which should suit both common people as well as dignitaries.

At present, the canteen serves around 5,000 people during every session. It has a total of 48 food items on its menu for lunch and evening snacks.


While matters relating to catering arrangements in the Parliament House Complex are typically decided by a joint committee on food management, in the 17th Lok Sabha, however, the food committee has not been constituted.

The final decision was taken by Speaker Birla, who has taken personal interest in ensuring that better quality food is served in the canteen and also to end subsidies.


An end to subsidies is expected to lead to annual savings of approximately ₹17 crore to Parliament.
A Nandy
BR Mainsite Crew
Posts: 502
Joined: 06 Sep 2009 23:39

Re: Indian Railways Thread (Dec 2015)

Post by A Nandy »

https://themetrorailguy.com/2020/10/27/ ... peed-rail/
India’s National High-Speed Rail Corporation Limited (NHSRCL) today invited tenders (bids) for the first ever preparatory survey work to develop the Detailed Project Report (DPR) for the upcoming 767 km Mumbai – Pune – Hyderabad High Speed Rail (MPHHSR bullet train) project in Maharashtra and Telangana.

This is the fifth of six new high speed rail corridors, planned by the Government of India in 2019, for which basic preliminary work has commenced to start construction on the project. Others already in the preparatory stage include the 865 km Delhi – Varanasi line, 886 km Delhi – Ahmedabad line, 741 km Mumbai – Nagpur line, and 465 km Delhi – Amritsar line.
A Nandy
BR Mainsite Crew
Posts: 502
Joined: 06 Sep 2009 23:39

Re: Indian Railways Thread (Dec 2015)

Post by A Nandy »

:D

Image
Dilbu
BRF Oldie
Posts: 8272
Joined: 07 Nov 2007 22:53
Location: Deep in the badlands of BRFATA

Re: Indian Railways Thread (Dec 2015)

Post by Dilbu »

Performance, Not Seniority, To Now Be The Sole Criterion For Promotion To Key Railway Posts
Discarding the age-old practice of seniority as a major criterion for promotion to higher posts, Indian Railways will now focus on performance, for selection to key positions such as Divisional Railway Managers, General Managers and Board Members.

In a reform-driven initiative, the Railways will fill up key posts with senior officers who are performers, as the national transporter has amended the selection procedure to have the best persons with proven track records on the job, said a senior Railway Ministry official aware of the development.

The proposal to set up a selection panel has been sent to the Group of Secretaries who would forward it to the Group of Ministers with its recommendations for final approval.
Railways has already decided to merge the eight rail services into a single Indian Railways Management Service (IRMS) for which preparatory measures are under way.

Though this decision was not received well by the civil services in the Indian Railways, especially the Traffic, Personnel and Accounts services, nevertheless, for the public transporter, there is no going back.

According to Railways, many aspects of management are still being worked out and the best feasible decision in the interest of the Indian Railways would be taken.

In 2019, the Cabinet had decided that an IRMS will be set up so as to put an end to the “departmentalism” and the “culture of silos” in the Indian Railways.
Vamsee
BRFite
Posts: 685
Joined: 16 Mar 2001 12:31

Re: Indian Railways Thread (Dec 2015)

Post by Vamsee »

https://indianexpress.com/article/india/railways-set-to-make-rs-8000-crore-with-zero-based-timetable-7056693/
In the new timetable, around 600 trains with traditionally low patronage are proposed to be knocked off the system, while around 400 trains are being either merged or upgraded.

That apart, around 10,000 halts are proposed to be done away with.

The new timetable — built in collaboration with IIT-Bombay — will also create around 15 per cent more dedicated paths for freight trains, translating into more earnings for the national transporter, sources said. As per internal calculations, this will result in savings of around Rs 4,000 crore and extra earnings of at least another Rs 4,000 crore.
Mollick.R
BRFite
Posts: 1033
Joined: 15 Aug 2016 10:26

Re: Indian Railways Thread (Dec 2015)

Post by Mollick.R »

Piyush Goyal inaugurates a recently electrified section on the Delhi-Ajmer route
PTI Last Updated: Nov 29, 2020, 09:49 PM IST

NEW DELHI: Union minister for railways Piyush Goyal on Sunday inaugurated the newly electrified Dhigawara-Bandikui section of North Western Railway and flagged off the first train on this newly electrified route. After the electrification of this line, the route from Rewari to Ajmer has been electrified and now the electrified trains from Delhi to Ajmer will start soon, the railway ministry said in a statement on Sunday. After running of these trains, the diesel trains will be stopped, which will eliminate pollution as well as the dependence on the fuel imported from outside and trains will be operated from the electricity produced in self-reliant India, and will also save significant revenue, the ministry said.

A total of 23,418 foundations, 26 switching stations, 6 traction sub-stations and 7 overhead equipment (OHE) depots have been set up for electrification on Delhi Sarai Rohilla-Madar (Ajmer). The electrification work was done on the Kota-Mumbai line in Rajasthan 35 years ago, after that no one paid attention to this area, Goyal was quoted as saying in the statement. “While working on this in the railways, a target has been set to electrify the entire percentage of railway lines across India,” Goyal added.

The Indian Railways has set a target to complete Electrification of its Broad gauge network by December 2023. More than 66% of the broad gauge route has already been electrified, the ministry said. With 18,065 km of electrification, Railways have recorded a 371 % increase in electrification during 2014-20 period as compared to 2009-2014. Around 28,143 km of Railway Track electrification is targeted to be complete by December 2023.

Red Full Article from here// ET Link............
https://economictimes.indiatimes.com/in ... 479135.cms
Mollick.R
BRFite
Posts: 1033
Joined: 15 Aug 2016 10:26

Re: Indian Railways Thread (Dec 2015)

Post by Mollick.R »

Railways gets environmental clearance for Mumbai-Ahmedabad Bullet train
IANS Last Updated: Dec 01, 2020, 03:57 PM IST

New Delhi: The Indian Railways has got all the requisite wildlife, forestry and coastal regulation zone clearances in Gujarat and Maharashtra for the 508-km Ahmedabad-Mumbai High Speed Rail Corridor, officials said on Tuesday.

Addressing a virtual press conference here, Railway Board Chairman and CEO, V.K. Yadav said, "Requisite Wildlife, Forestry and Coastal Regulation Zone clearances in the state of Gujarat and Maharashtra have been obtained."

He said that out of 1,651 utilities, 1,070 have been shifted for the High Speed Train Corridor. Yadav further said that railways have got 67 per cent of the land required for the Bullet train project. Giving the break up of land acquired in Gujarat, he said, 825 hectare out of 956 hectare have been acquired, which is 86 per cent.While in Maharashtra, the 97 hectare out of the 432 hectare of land has been acquired, which is only 22 per cent of the total land required and seven hectare out of eight hectare land has been acquired in Dadra and Nagar Haveli, Yadav said. Yadav further said that railways has floated the tenders worth Rs 32,000 crore in Gujarat for the ambitious project covering 325 km length of viaduct and five stations.
.
.
.
Commenting on the progress of the Dedicated Freight Corridor, Yadav said that by June 2022 the DFC will be complete.In the first phase, the organisation is constructing the Western DFC (1,504 route km) and Eastern DFC (1,856 route km) spanning a total length of 3,360 route km.

Yadav said that in the EDFC the 353 km long Khurja-Bhaupur section is ready for commissioning while 48 km-long Khurja-Dadri section will be ready by June 2021, 401 km-long Ludhiana-Khurja section and 402 km-long Bhaupur-Deen Dayal Upadhyay section will be ready by June 2022 and 137 km long Deen Dayal Upadhyay-Sonnagar section will be ready by December 2021.

He said on the WDFC, the 306 km-long Rewari-Madar section is ready for commissioning while 335 km-long Madar-Palanpur section will be ready by March 2021, 122 km-long Rewari-Dadri by December 2021 and 738 km-long Palanpur-Makarpura-JNPT section by June 2022.


Red Full Article from here// ET Link..................

https://economictimes.indiatimes.com/in ... content=23
Vips
BRF Oldie
Posts: 4699
Joined: 14 Apr 2017 18:23

Re: Indian Railways Thread (Dec 2015)

Post by Vips »

Indian Railways gets its 50th high-speed freight locomotive from Alstom.

Indian Railways has recently got the 12000HP 50th 12WAGB electric locomotive from Alstom.

The locomotives will be used for hauling freight trains can run at a top speed of 120kmph and to be deployed on all the major routes and Dedicated Freight Corridors(DFCs) of Indian Railways. The locomotive will be used for the faster movement of goods, especially coal and iron ore.

Alain Spohr, Managing Director, Alstom India & South Asia said,“We are proud to have successfully manufactured and delivered 50 e-locos of 12,000 HP to Indian Railways so far, in spite of the global pandemic. These are the only freight e-Locos approved by Indian Railways to run at a speed of 120 KMPH. The locos that have been inducted by Indian Railways have already covered close to 2 million kilometers till date.

Planned to be deployed for operations on major freight routes, including the Dedicated Freight Corridors (DFCs), these electric locos are capable of hauling ~6000 tonnes at a top speed of 120 kmph. Built as part of the largest Foreign Direct Investment (FDI) project in the Railway sector, these 800 fully electric super powered double-section locomotives will transform the heavy freight transportation landscape of India.

These 800 e-locos are being manufactured at India’s largest integrated greenfield manufacturing facility in Madhepura, Bihar. This project has created over 10,000 jobs, primarily in Bihar, Uttar Pradesh and Maharashtra. This joint venture by Ministry of Railways (Indian Railways) and Alstom is one of the strongest realizations of Make-in-India vision with a strong impetus on indigenous manufacturing with over 87% localization. The JV combines innovation with responsibility and together we are committed to deliver safe, reliable and efficient solutions. We are excited to be part of this revolutionary journey of Indian Railways."

In line with the Make-in-India mandate, all the 800 Prima locomotives are being manufactured locally. Designed at Alstom’s Engineering Centre in Bengaluru, the Prima T8 WAG-12 are being built at Madhepura in Bihar.

Spread across 250 acres, with a production capacity of 120 locomotives per year, the Madhepura site is built to international standards of safety and quality. Two ultra-modern maintenance depots in Saharanpur and Nagpur will ensure the high service availability of the locomotives. The latest features, these depots will play a critical role in maintaining India’s most advanced freight locomotives at significantly lower costs.
A Nandy
BR Mainsite Crew
Posts: 502
Joined: 06 Sep 2009 23:39

Re: Indian Railways Thread (Dec 2015)

Post by A Nandy »

https://timesofindia.indiatimes.com/bus ... 437491.cms
The National High Speed Rail Corporation (NHSRCL) on Thursday signed the country’s largest ever government-funded civil contract of nearly Rs 25,000 crore for the Ahmedabad-Mumbai bullet train project with infrastructure major Larsen and Toubro (L&T). The construction company said they have deployed people on ground to start work. The NHRSCL has awarded work for 325 km falling in Gujarat to L&T.

Speaking on the occasion, the Japanese ambassador to India Satoshi Suzuki said the contract for such a mammoth infrastructure project has been awarded at a time when it was required to accelerate economic activities. He said the project will not only help in transfer of Japanese technologies to India but it will also transform urban development along its corridor.

Railway board CEO and chairman, V K Yadav, said that after completion of this first bullet train project, the government will take up more such train corridors on seven more routes. There will be employment generation not only for professionals like engineers, technicians, designers and architects but also for skilled and semi-skilled workforce and construction workers.
Suraj
Forum Moderator
Posts: 15043
Joined: 20 Jan 2002 12:31

Re: Indian Railways Thread (Dec 2015)

Post by Suraj »

Medha Likely To Bag Vande Bharat Train Project For Which BHEL And Chinese Firm Were Also Bidders
In a keenly fought race, Medha, a major domestic player in the rolling stock manufacturing sector, has edged past Bharat Heavy Electricals Limited (BHEL) with a wide margin and emerged as the lowest bidder in the Rs 1800 crore Vande Bharat train project.

There were only three participants including a Chinese entity in the race to bag the prestigious project involving manufacturing of 44 semi-high speed Vande Bharat trainsets indigenously.

While the Chinese bidder could not qualify, the final race was between BHEL, the State-run PSU and the domestic giant Medha.

According to railway sources, Medha is slated to bag the contract as it has quoted a lower price than the state-run PSU.
A Nandy
BR Mainsite Crew
Posts: 502
Joined: 06 Sep 2009 23:39

Re: Indian Railways Thread (Dec 2015)

Post by A Nandy »

So basically wasted a lot of time and money and decided on the same company as t18.
nachiket
Forum Moderator
Posts: 9126
Joined: 02 Dec 2008 10:49

Re: Indian Railways Thread (Dec 2015)

Post by nachiket »

The Vande Bharat tender is the perfect example of bureaucracy run amok. Penalizing people for the crime of innovating and actually making something tangible and useful. Creating more work for paper pushers while the country is deprived of the output of people who are actually being productive members of society.
darshan
BRF Oldie
Posts: 4018
Joined: 28 Jan 2008 04:16

Re: Indian Railways Thread (Dec 2015)

Post by darshan »

Indian Railways Dismisses Bid Of Chinese Led JV For Manufacturing 44 Vande Bharat Trainsets
https://swarajyamag.com/insta/indian-ra ... -trainsets
Deleted my comments to follow Suraj's guidance about greatness of law and order that India is a shiny example of.
Last edited by darshan on 25 Dec 2020 00:27, edited 2 times in total.
Suraj
Forum Moderator
Posts: 15043
Joined: 20 Jan 2002 12:31

Re: Indian Railways Thread (Dec 2015)

Post by Suraj »

Please stop derailing this thread with such vomit . We are a nation of laws . Laws work like this - the appropriate arm of government defines the restrictions on Chinese JVs, then other public and private commercial entities follow those rules . That’s what happened .
A Nandy
BR Mainsite Crew
Posts: 502
Joined: 06 Sep 2009 23:39

Re: Indian Railways Thread (Dec 2015)

Post by A Nandy »

https://www.financialexpress.com/infras ... c/2158887/
The ‘New Bhaupur-New Khurja’ section of Indian Railways’ Eastern Dedicated Freight Corridor will be inaugurated by PM Narendra Modi tomorrow. Besides, the Prime Minister will also inaugurate the operation control centre of the Eastern Dedicated Freight Corridor at Prayagraj, according to a PTI report. The 351 kilometres long stretch of New Bhaupur-New Khurja is located in the state of UP and has been built at a cost of Rs 5,750 crore. The EDFC section of New Bhaupur-New Khurja will benefit local industries like the aluminium industry in Pukhrayan region of Kanpur Dehat, glassware industry of Firozabad, asafoetida production of Hathras, textile production and block printing of Etawah, dairy sector of Auraiya, pottery products of Khurja, as well as locks and hardware of Aligarh district.
Inauguration done: https://twitter.com/hashtag/VikasKaRail ... htag_click
Ashokk
BRFite
Posts: 1122
Joined: 11 Aug 2016 06:14

Re: Indian Railways Thread (Dec 2015)

Post by Ashokk »

Indian Railways Unveils New Made-In-India Luxury Vistadome Coaches, Here Are The Top Features
Image
The Indian Railways has unveiled new state-of-the art luxury Vistadome coaches which are capable of running at speeds up to 180 kmph, which will be used on tourist routes, Livemint has reported.

The coaches have successfully completed 180 kmph oscillation trials and squeeze tests. They have been manufactured by the Integral Coach Factory (ICF) in Chennai
These coaches are equipped with a large glass roof, large windows, an observation lounge and rotatable seats for an optimal experience for tourists.

The glasses have been coated with a laminated sheet to make it shatter proof.

Each coach will have 44 seats, with features like 180 degree rotation and plush upholstery. The passengers will also be able to avail the facility of an onboard WiFi information system.

Here are two other photographs of these coaches.
Image
Image
The usage of these coaches would be reserved for scenic tourist spots. The older versions of these coaches are currently being used by Darjeeling Himalayan Railway, Kalka Shimla Railway, Kangra Valley Railway, Matheran Hill Railway and Nilgiri Mountain Railway.
Post Reply