France Tests Huge 140mm Tank Gun As It Pushes Ahead With Germany On A New Tank Design
(apologies for the large size image. Can it be sized down?)
The 140mm and 120mm rounds side by side

ks_sachin wrote:nachiket wrote:...
The bin itself is not protected by a blast proof door like the Abrams or the Leclerc
durairaaj wrote:
Then the more pertinent question would be "Does T tanks have comparable protection?"
or "is it viable to add such protection to the T-tanks?"
We were comparing Arjun only with T tanks in our armory not Abrams or Lecrec, which are not in our armory.
ks_sachin wrote:
The bin itself is not protected by a blast proof door like the Abrams or the Leclerc
jamwal wrote:Ammunition on Arjun is stored in turret area behind gunner. I have posted pictures in this thread not too long back and on twitter
It has 14 major upgrades over the Mk1 variant
After delays, the process for procurement of 118 indigenous Main Battle Tank (MBT) Arjun Mk-1A has commenced, according to an Army source. The cost as obtained from the Heavy Vehicles Factory (HVF), Avadi, is ₹8,956.59 crore.
“The file is currently with the Deputy Chief of Army Staff and will be shortly sent to Integrated Defence Staff (IDS) to put up the case. The case is planned to be fielded before the Defence Procurement Board (DPB) and the Defence Acquisition Council (DAC) in January 2021,” the source said. Issues with Arjun Mk1 ammunition, spares and repairs had also been resolved and the Defence Research and Development Organisation (DRDO) had set up an Arjun hub in Jaisalmer for spares and support, the source stated.
Stating that the Arjun Mk-1A would be without missile firing capability and would be incorporated as and when the development was complete, the source said that at the Arjun hub in Jaisalmer, 248 rotables had been deposited.
On the process and timeline of the project, the official explained that once DAC approved the case, the Army would place indent with the HVF, Avadi. “That is also expected to happen before March 31, 2021. HVF will then build the first five tanks in 30 months which are called ‘First of Production Model’,” the official stated.
These five tanks will be put through General Service Quality Requirement (GSQR) evaluation by the Army and will accord Bulk Production Clearance (BPC) if found satisfactory. Once BPC was given, production would be done as per an agreed schedule, the official said.
Observing that if subsequently more numbers were ordered beyond 118, it would immensely benefit the domestic industry and the ‘Make in India’ effort, the official added that the indigenisation content could also progressively go to 70% with more numbers.
The advanced GMS of the Arjun Mk-1A had built-in laser target designator and the tank was customised for missile firing, a second official said. The missile is under development at the Armament Research and Development Establishment (ARDE), Pune, and trials are under way. Missile firing is under way at the ARDE. “A few more trials are required,” the official stated.
To incorporate this capability on the existing Arjun Mk1 tanks...
Thakur_B wrote:Let the 118 Arjun Mk1A DAC clearance->Negotiation->Approval->T90 is 50% cheaper circus begin.
jamwal wrote:Why is it taking 2.5 years to manufacture just 5 Arjun Mk1A tanks? Has HVF dismantled it's manufacturing infrastructure?
I am willing to bet that army will come up with dozens of must have "improvements" and delay induction by 4-5 years again.
Pratyush wrote:At this point in time its a waste of time to further work on the Arjun. The Army is wasting every ones time for not coming up with the GSQR of the FMBT and its assorted supporting vehicles.
ParGha wrote:On the contrary, the Army wants (and NEEDS) to induct Arjun Mk2s and Abhays by 2026-27 -- it is better to focus one's energy on getting them mass-production-worthy, increasing the indigenization and ironing out the issues. It is critical to have them fully ready by this time because a whole bunch of T-72s and BMP2s upgraded in early-2000s will hit their 25-year life-span (for engines and transmission).
If the Arjuns and Abhays aren't ready, the Army will just order more T-90s and worse.
jamwal wrote:Why is it taking 2.5 years to manufacture just 5 Arjun Mk1A tanks? Has HVF dismantled it's manufacturing infrastructure?
I am willing to bet that army will come up with dozens of must have "improvements" and delay induction by 4-5 years again.
ParGha wrote:
On the contrary, the Army wants (and NEEDS) to induct Arjun Mk2s and Abhays by 2026-27 -- it is better to focus one's energy on getting them mass-production-worthy, increasing the indigenization and ironing out the issues. It is critical to have them fully ready by this time because a whole bunch of T-72s and BMP2s upgraded in early-2000s will hit their 25-year life-span (for engines and transmission). If the Arjuns and Abhays aren't ready, the Army will just order more T-90s and worse. The FMBT, like the FICV, is a pipedream. No one can even visualize where it would fall in the procurement cycles. If Arjuns can start replacing Ajeyas by 2026 successfully, I can easily see them replacing the older T-90s by 2031-32.
jamwal wrote:Why is it taking 2.5 years to manufacture just 5 Arjun Mk1A tanks? Has HVF dismantled it's manufacturing infrastructure?
I am willing to bet that army will come up with dozens of must have "improvements" and delay induction by 4-5 years again.
nam wrote:IA doesn't want Arjun in current form. Weight, logistics, OFB being the single production agency etc. All of these are against it.
Arjun in current form is a dead end. Even if DRDO creates a new FRCV, IA will not induct a kit, where OFB is the sole production agency.
So for replacing T72 in the next decade, it is going to be either T14, ToT to OFB or K2 hopefully built L&T. But I am pretty sure, OFB will muscle in for ToT for K2.
The only hope I have for an DRDO designed Indian tank, is it getting produced ONLY by a private entity.
Keeping OFB employed is a bigger objective than IA getting proper kit or loosing a war.
AkshaySG wrote:Looks like Arjun is going the Marut way rather than the Tejas way , I just hope we don't have to wait 30 more years to see the next indigenous iteration.
darshan wrote:AkshaySG wrote:Looks like Arjun is going the Marut way rather than the Tejas way , I just hope we don't have to wait 30 more years to see the next indigenous iteration.
Only time will tell. Arjun is step ahead. Ordered and delivered. Tejas has just been ordered. Long road ahead.