Indian Space Programme Discussion

All threads that are locked or marked for deletion will be moved to this forum. The topics will be cleared from this archive on the 1st and 16th of each month.
Locked
Bade
BRF Oldie
Posts: 7212
Joined: 23 May 2002 11:31
Location: badenberg in US administered part of America

Re: Indian Space Programme Discussion

Post by Bade »

SriKumar wrote:
Varoon Shekhar wrote:GSLV Mk.2 4 × L-40H / Vikas GS-1 / S-139 GS-2 (L-37.5H) / Vikas GS3 (CUS-12) / CS -
GSLV Mk.2A 4 × L-40H / Vikas GS-1 / S-139 GS-2 (L-37.5H) / Vikas GS3 (CUS-15) / CS -
GSLV Mk.2C 4 × L-40H / Vikas GS-1 / S-139 GS-2 (L-40H) / Vikas GS3 (CUS-15) / CS PAM-G

"It is the CE 7.5 Engine which is part of the CUS15 cryogenic stage."

So was there some uprating of the stage, from the first failed launch of the Indian Cryo-engine. From CUS-12 to CUS-15. What were the modifications?
If I recall right, the failure of the desi cryo stage was due to the cryo turbo-pump(s) failing. The ISRO brochure posted by PratikDas on previous page says something about turbopump modification.
http://timesofindia.indiatimes.com/indi ... 417612.cms
From the April 2010 failure, when the cryogenic engine failed 800 milliseconds after ignition, Isro learned that dissimilar contractions of different materials led to problems in three bearings in the fuel booster turbo pump. "Here we made some changes to the design of one of the casings and tested the new pump under normal operating temperatures. Its working perfect now," Radhakrishnan said. In the case of the December 2010 misfire, scientists found some Russian connectors had snapped. This was corrected by changing the mounting design, which was later tested on ground using the wind tunnel blow down method.

"We have thoroughly studied the past experiences and made changes. We are all upbeat," said Radhakrishnan while travelling from the Isro headquarters in Bangalore to Sriharikota on Saturday.
member_28108
BRFite
Posts: 1852
Joined: 11 Aug 2016 06:14

Re: Indian Space Programme Discussion

Post by member_28108 »

Preparations for Propellant filling operation of GSLV-D5 Cryo Stage is under progress
SriKumar
BRF Oldie
Posts: 2245
Joined: 27 Feb 2006 07:22
Location: sarvatra

Re: Indian Space Programme Discussion

Post by SriKumar »

Bade wrote: http://timesofindia.indiatimes.com/indi ... 417612.cms
From the April 2010 failure, when the cryogenic engine failed 800 milliseconds after ignition, Isro learned that dissimilar contractions of different materials led to problems in three bearings in the fuel booster turbo pump. "Here we made some changes to the design of one of the casings and tested the new pump under normal operating temperatures. Its working perfect now," Radhakrishnan said. In the case of the December 2010 misfire, scientists found some Russian connectors had snapped. This was corrected by changing the mounting design, which was later tested on ground using the wind tunnel blow down method.

"We have thoroughly studied the past experiences and made changes. We are all upbeat," said Radhakrishnan while travelling from the Isro headquarters in Bangalore to Sriharikota on Saturday.
Hey ......thanks for the link. This is the first time I am seeing a number associated with the time of failure. If you recall the launch video, they announced 'cryogenic stage ignition' and there was applause among the viewers. After that the blip on the screen started to to depart from the expected trajectory and then it was clear for all to see. Regarding the recent failure of the GSLV with russian cryo stage, indeed the connectors had snapped. I thought they traced that to a failure of the shroud as the primary cause. If I recall right, the payload fairing was larger than before, or something like that, and that caused some (aerodynamic?) issues around the shroud....per some press reports or the ISRO failure report. The current GSLV brochure mentions this as one of the improvements 're-characterization of the vehicle aerodynamics' plus re-design of the shroud.

Added later: The above article is in 2010 at which point the primary cause was not determined. Article in 2014, but more detail below. This link has more on the cause of connectors snapping (air pressure around the shroud). http://indianspaceweb.blogspot.com/2011 ... ilure.html
Last edited by SriKumar on 05 Jan 2014 07:24, edited 2 times in total.
member_28108
BRFite
Posts: 1852
Joined: 11 Aug 2016 06:14

Re: Indian Space Programme Discussion

Post by member_28108 »

putnanja wrote:From the GSLV-D5 documenton ISRO site


ok, noobie question, so please don't laugh :) The first stage which is solid provides altitude gain of almost 70kms, and that is while trying to escape the earth's gravity. However, the CUS provides altitude gain of around 73kms in outer space where the earth's pull will be less. How exactly is the cryogenic stage providing better capability? does it have to do with the size/propellants required for cryogenic stage as compared to the solid stage?
A cryogenic engine is needed after a certain amount of time (rather payload weight and insertion needs) because we need to move a certain amount of fuel and oxidizer at a sufficiently fast rate to impart a sufficient increase in velocity(deltaV). To do that - solid and liquid traditional fuel cannot do that rapidly enough as the rate of pumping versus fuel efficiency is not possible to be achieved with current traditional solid and liquid noncryogenic fuels.(solids are not pumped but burn as is where is and the rate is determined by altering the surface area of the burning solid fuel to put it simply) For oxygen and hydrogen in gaseous form the problem is the holding tanks for these in gaseous form would be just too large offsetting fuel transmission needs (good) to tank weight (bad).So we need to hold the fuel in as efficient form in smaller tanks . Verner Von Braun found out that this could be overcome by holding the gaseous fuel as cryogenic liquids (LOX - liquid oxygen) and Liquid hydrogen (LH2) and this allows compact storage in weight saving smaller tanks and the gas can now be "vaporized" at the time of injection into the ignition chamber but be held cryogenically till then during pumping so we can now throw a huge amount of efficient fuel rapidly allowing a bigger "bang for buck" though the bang is a controlled one :)
The problems we face are one of handling that cryogenic fuel - holding pumping and efficiently igniting in a controlled manner this fuel. Not so easy as metals etc behave differently at such low temperatures so the holding containers, pumps etc must work properly both at cryogenic temperatures as well as in the vacuum of space.
Just to indicate how complex this is the rocket cone gets heated so much that it should melt so part of the cryogenic fuel actually circulates around the engine nozzle (the inverted aluminium bucket :) ) to cool it and simultaneously gets converted to gaseous form to enter the ignition chamber.

If I am right there is some photo showing the external temperature of the cryogenic rocket engine nozzle which is technically cool enough to put a hand on it but for the fact we cannot stand near the rocket when it is firing !! I cannot seem to get hold of that picture.

Hoe this helps

If you want to read some more see
http://www.slideshare.net/pandu_sravs/c ... nes-report
Gagan
BRF Oldie
Posts: 11242
Joined: 16 Apr 2008 22:25

Re: Indian Space Programme Discussion

Post by Gagan »


Jan 05, 2014
Preparations for Propellant filling operation of GSLV-D5 Cryo Stage is under progress
They've tested the cryo stage so many times now, and in all sorts of conditions, even high altitude test chamber, in vaccum.

God speed to the GSLV flight !!!
All the best ISRO team !!!
member_28108
BRFite
Posts: 1852
Joined: 11 Aug 2016 06:14

Re: Indian Space Programme Discussion

Post by member_28108 »

Image

From ISRO's FB page.
Raja Bose
BRF Oldie
Posts: 19478
Joined: 18 Oct 2005 01:38

Re: Indian Space Programme Discussion

Post by Raja Bose »

^^^Thats one beauitiful rocket, aint it?! 8)
ravar
BRFite
Posts: 259
Joined: 04 Feb 2008 11:30
Location: हिमालयम समारभ्य़ यावत हिन्दु सरोवरम, तम देव निर्मितम देशम हिन्दुस्थानम प्रचक्षते

Re: Indian Space Programme Discussion

Post by ravar »

Quote-
"Just to indicate how complex this is the rocket cone gets heated so much that it should melt so part of the cryogenic fuel actually circulates around the engine nozzle (the inverted aluminium bucket :) ) to cool it and simultaneously gets converted to gaseous form to enter the ignition chamber." Unquote

Vikas engine uses the same tech for cooling itself but for ISRO the challenge has been with materials to withstand the cryo and extreme hot temperature within a few inches apart, which is the holy grail in such engines
disha
BR Mainsite Crew
Posts: 8264
Joined: 03 Dec 2006 04:17
Location: gaganaviharin

Re: Indian Space Programme Discussion

Post by disha »

SriKumar wrote:... This link has more on the cause of connectors snapping (air pressure around the shroud). http://indianspaceweb.blogspot.com/2011 ... ilure.html
SriKumar, you are confusing and conflating two GSLV failures.

The failure due to snapping of connectors happened with the one of the last of Russian CUS. The Russians were not forthcoming with the shroud design data (maybe they just did not want to be held liable or show up as buffoons). This was a design failure. The recommendation was doing away with shroud all together.

Look at the latest photos carefully, between the H2 tank and O2 tank, there is only trusses (covered in thermal blankets) but no shroud.

The last GSLV failure in the Indian CUS was due to bearings getting jammed. The CUS did achieve ignition and burnt for 800 msec., and then jammed up. It was a material failure and not a design failure.
Last edited by disha on 05 Jan 2014 09:31, edited 1 time in total.
SriKumar
BRF Oldie
Posts: 2245
Joined: 27 Feb 2006 07:22
Location: sarvatra

Re: Indian Space Programme Discussion

Post by SriKumar »

Actually, I do not believe I conflated the two. Please check my post on the previous page where I mention the desi cryo stage specifically. In the post above, I refer to both, and the quoted Hindu article also refers to both (and maybe hence the confusion) but my comment with regard to the russian cryo stage is about snapping of connectors and shroud.
Last edited by SriKumar on 05 Jan 2014 08:50, edited 4 times in total.
member_28108
BRFite
Posts: 1852
Joined: 11 Aug 2016 06:14

Re: Indian Space Programme Discussion

Post by member_28108 »

ravar wrote:Quote-
"Just to indicate how complex this is the rocket cone gets heated so much that it should melt so part of the cryogenic fuel actually circulates around the engine nozzle (the inverted aluminium bucket :) ) to cool it and simultaneously gets converted to gaseous form to enter the ignition chamber." Unquote

Vikas engine uses the same tech for cooling itself but for ISRO the challenge has been with materials to withstand the cryo and extreme hot temperature within a few inches apart, which is the holy grail in such engines
I was just mentioning it (regenerative cooling and rocket nozzle temperature mitigation) to indicate how complex the design of a rocket engine is !
member_23694
BRFite
Posts: 732
Joined: 11 Aug 2016 06:14

Re: Indian Space Programme Discussion

Post by member_23694 »

All eyes on today’s launch of refurbished GSLV-D5
http://www.thehindu.com/sci-tech/scienc ... 538111.ece

the most heartening part
M.C. Dathan, Director, Liquid Propulsion Systems Centre (LPSC), ISRO, said: “We have done everything humanly possible” to ensure the success of the mission. “We have drawn on all the expertise available,” he said.
Best of LUCK . Hard work does pays off :D
Austin
BRF Oldie
Posts: 23387
Joined: 23 Jul 2000 11:31

Re: Indian Space Programme Discussion

Post by Austin »

Good Luck to ISRO and Team GSLV , Wishing them a successful launch
SwamyG
BRF Oldie
Posts: 16268
Joined: 11 Apr 2007 09:22

Re: Indian Space Programme Discussion

Post by SwamyG »

Good luck onlee.
kvraghavaiah
BRFite
Posts: 126
Joined: 16 Feb 2008 17:20
Location: Chennai
Contact:

Re: Indian Space Programme Discussion

Post by kvraghavaiah »

ISRO,

We are optimistic that today's launch will be a full success. You have done everything you can for that.
disha
BR Mainsite Crew
Posts: 8264
Joined: 03 Dec 2006 04:17
Location: gaganaviharin

Re: Indian Space Programme Discussion

Post by disha »

All, I have created a thread to discuss GSLV-D5 Launch - any launch specific discussion, status tracking etc will be available there.

Also links for any webcasts/news links/updates will be available in the GSLV-D5 launch and post launch discussions thread.
Comer
BRF Oldie
Posts: 3574
Joined: 11 Aug 2016 06:14

Re: Indian Space Programme Discussion

Post by Comer »

prasannasimha wrote: *snip*
Hoe this helps

If you want to read some more see
http://www.slideshare.net/pandu_sravs/c ... nes-report
Thanks a lot for very lucid and clear explanation.
Gagan
BRF Oldie
Posts: 11242
Joined: 16 Apr 2008 22:25

Re: Indian Space Programme Discussion

Post by Gagan »

Propellant filling operation of GSLV-D5 Cryo Stage has commenced at 11:42 hrs (IST).
Last edited by SSridhar on 05 Jan 2014 13:32, edited 1 time in total.
Reason: Post it in the GSLV-D5 thread
Kakarat
BRF Oldie
Posts: 2225
Joined: 26 Jan 2005 13:59

Re: Indian Space Programme Discussion

Post by Kakarat »

Comer
BRF Oldie
Posts: 3574
Joined: 11 Aug 2016 06:14

Re: Indian Space Programme Discussion

Post by Comer »

PratikDas wrote:The video is good and the narration crisp but I couldn't listen to more than a few minutes of it. The accent is like the one on board Air India informing passengers how to wear their seat belts or escape the plane in case of an emergency. Not a *single* Indian I know speaks in an operatic manner like that - even the ones with an excellent grasp of the English language, both written and verbal. Who are they trying to impress? In contrast, many of ISRO's leaders who spoke after Mangalyaan's launch seemed more authoritative, earnest and down right inspirational.
OT: If I am correct, the same person/voice is used in the planetarium shows. It is very grating after a few minutes.
vdutta
BRFite
Posts: 682
Joined: 08 Nov 2002 12:31
Location: USA
Contact:

Re: Indian Space Programme Discussion

Post by vdutta »

So far so good. Congrats
Peregrine
BRF Oldie
Posts: 8441
Joined: 11 Aug 2016 06:14

Indian Space Programme Discussion

Post by Peregrine »



Cheers Image
Singha
BRF Oldie
Posts: 66601
Joined: 13 Aug 2004 19:42
Location: the grasshopper lies heavy

Re: Indian Space Programme Discussion

Post by Singha »

not sure who owns this site but has good laymen language description of all our projects and technical goals in launchers
http://isp.justthe80.com/launchers
A_Gupta
BRF Oldie
Posts: 12128
Joined: 23 Oct 2001 11:31
Contact:

Re: Indian Space Programme Discussion

Post by A_Gupta »

Congrats to Team ISRO!
member_22539
BRF Oldie
Posts: 2022
Joined: 11 Aug 2016 06:14

Re: Indian Space Programme Discussion

Post by member_22539 »

Congrats to ISRO and to India. May we march steadily ahead on the path of technological progress.
Kakarat
BRF Oldie
Posts: 2225
Joined: 26 Jan 2005 13:59

Re: Indian Space Programme Discussion

Post by Kakarat »

ISRO GSLV-D5 launch Video
member_26535
BRFite -Trainee
Posts: 47
Joined: 11 Aug 2016 06:14

Re: Indian Space Programme Discussion

Post by member_26535 »

Congratulations team ISRO.. this looks to be a fantastic copybook launch.. As a nation we have successfully overcome another technology denial regime . I hear that it will take atleast 2 more successful launches for this to be considered a reliable workhorse like PSLV. Hope we achieve that in the next couple of years.
pankajs
BRF Oldie
Posts: 14746
Joined: 13 Aug 2009 20:56

Re: Indian Space Programme Discussion

Post by pankajs »

GSLV rocket's success will mean immense savings: ISRO chief
"We will be launching satellites GSAT-6, 7A, 9 using GSLV. We will also be using this rocket for our second Chandrayaan mission and for the launch of GISAT," he said.

According to him, another communication satellite GSAT-15 will be launched using the Ariane rocket.

Other than the flight testing of cryogenic engine, 2014 will be an important year for ISRO.

Radhakrishnan noted that in September, the Mars Orbiter will be injected into the Mars orbit while the test flight of GSLV-Mark III version will also include a crew module for characterisation of re-entry from the space.

"The GSLV-Mark III experimental mission will be in April this year. The rocket will have a passive cryogenic stage/engine. The main purpose of the mission is to study the aerodynamics and stability of the rocket," he said.

He said the cryogenic engine for the next GSLV version will take around three years for being flight ready.


According to him, the next fiscal (April 2014-March 2015) would see ISRO launching three IRNSS (Indian Regional Navigational Satellite System) satellites taking the total to four and be ready for usage.
member_25400
BRFite -Trainee
Posts: 49
Joined: 11 Aug 2016 06:14

Re: Indian Space Programme Discussion

Post by member_25400 »

putnanja wrote:From the GSLV-D5 documenton ISRO site
ok, noobie question, so please don't laugh :) The first stage which is solid provides altitude gain of almost 70kms, and that is while trying to escape the earth's gravity. However, the CUS provides altitude gain of around 73kms in outer space where the earth's pull will be less. How exactly is the cryogenic stage providing better capability? does it have to do with the size/propellants required for cryogenic stage as compared to the solid stage?
Solid fuel based engines can provide great thrust, but have a tendency to have poorer specific impulse. Think of this as the trade-off between power (thrust) and fuel efficiency. (since rockets have to carry both fuel and oxidizer, so specific impulse is actually a measure of an engine's propellant efficiency). There are some other trade-offs. (briefly described below)

Solid fuels can be stored easily for long periods of time, making them suitable for military applications like missiles. Cryogenic engines being liquid fueled, can be designed to be re-started or throttled back (though not always done so). The rocket equation (actually payload mass fraction of ~0.9) tells us that for every 1 kg of payload that we get to orbit, we tend to use ~9 kg of propellant (ignoring structure/tank weight). By reducing the amount of propellant & tanking to be lifted off & accelerated for an upper stage, we can reduce the size/thrust required for the rocket as a whole by a similar multiplication factor.
Cryogenic engines also help by increasing the density of fuel/oxidizer (reduces tank size and weight). But they require difficult handling, careful insulation, complicated design and material science.

Easy ref: http://www.esa.int/Education/Solid_and_ ... l_rockets3
Last edited by member_25400 on 05 Jan 2014 19:22, edited 1 time in total.
Varoon Shekhar
BRF Oldie
Posts: 2178
Joined: 03 Jan 2010 23:26

Re: Indian Space Programme Discussion

Post by Varoon Shekhar »

"He said the cryogenic engine for the next GSLV version will take around three years for being flight ready."

He of course means the engine for the Mark 3 vehicle, right? For the Mark 2, any reference to the next launch? This year, early next year?
A Nandy
BR Mainsite Crew
Posts: 502
Joined: 06 Sep 2009 23:39

Re: Indian Space Programme Discussion

Post by A Nandy »

I have a question. Why is the spent first stage not separated immediately but carried on as dead weight for some time ?
SSridhar
Forum Moderator
Posts: 25101
Joined: 05 May 2001 11:31
Location: Chennai

Re: Indian Space Programme Discussion

Post by SSridhar »

putnanja wrote:How exactly is the cryogenic stage providing better capability? does it have to do with the size/propellants required for cryogenic stage as compared to the solid stage?
Two things matter, the specific impulse, thrust per unit mass of propellant(s) and re-startability of engine.
SSridhar
Forum Moderator
Posts: 25101
Joined: 05 May 2001 11:31
Location: Chennai

Re: Indian Space Programme Discussion

Post by SSridhar »

A Nandy wrote:I have a question. Why is the spent first stage not separated immediately but carried on as dead weight for some time ?
Because, the attached strap-ons are still firing.

Added later: From the GSLV-D05 ISRO Brochure, you can see that the core stage shuts off in 100 secs whereas the liquid strap-ons end in 148 secs.
A Nandy
BR Mainsite Crew
Posts: 502
Joined: 06 Sep 2009 23:39

Re: Indian Space Programme Discussion

Post by A Nandy »

Ok, I am no expert, but the strap-ons are lifting dead weight after that time. Maybe the first stage firing time can be increased to coincide with the end of the the strap-ons firing.
Varoon Shekhar
BRF Oldie
Posts: 2178
Joined: 03 Jan 2010 23:26

Re: Indian Space Programme Discussion

Post by Varoon Shekhar »

[quote="PratikDas"]The video is good and the narration crisp but I couldn't listen to more than a few minutes of it. The accent is like the one on board Air India informing passengers how to wear their seat belts or escape the plane in case of an emergency. Not a *single* Indian I know speaks in an operatic manner like that - "

It's wonderful to see this diversity of English language style in India. Why should everyone speak in the same way.There are those who might even prefer the manner of the presenter in the ISRO video, to the conventional Indian style, without denigrating that style.

You can hear more or less the same accent/speech style in official Air India, ICICI and CNN-IBN announcers.It would even be nice to hear a few Indians in India speak with an American or Canadian accent. Let many styles blossom! Those aren't going to be the majority, anyway.

Congratulations to ISRO for this excellent, and very difficult, achievement. It was a long time coming, but well worth the wait. Yes, as someone remarked, we can eagerly await the day when such launches become routine!
member_28348
BRFite -Trainee
Posts: 20
Joined: 11 Aug 2016 06:14

Re: Indian Space Programme Discussion

Post by member_28348 »

i mean no disrespect but why does ISRO allow prof. yashpal talk in every post launch speeches?

i bet he's not a part of any technical team for those launches. today, he couldn't even describe the cryogenic engine's maiden achievement well.
every time he thanks ISRO for even allowing his speech and says "its good to be alive" in the end.

is it because ISRO considers him as the same NASA did for carl sagan- a cosmic inspirational guide?
Victor
BRF Oldie
Posts: 2628
Joined: 24 Apr 2001 11:31

Re: Indian Space Programme Discussion

Post by Victor »

Congratulations to India and ISRO. A major milestone crossed.
member_28108
BRFite
Posts: 1852
Joined: 11 Aug 2016 06:14

Re: Indian Space Programme Discussion

Post by member_28108 »

He has been on many failure analysis committees especially of the cryogenic engine.
Also may be there as a lucky charm :D
Last edited by member_28108 on 05 Jan 2014 19:56, edited 1 time in total.
member_28108
BRFite
Posts: 1852
Joined: 11 Aug 2016 06:14

Re: Indian Space Programme Discussion

Post by member_28108 »

The strapons do not eject earlier because they fire for a longer time.This was a trade off because the GSLV was designed by minimizing the modifications of systems we already had and the Ist stage is directly a copy of the PSLV stage so this was used but the strap ons needed to fire for a longer time so indeed they are carrying for some time a dead weight.
Varoon Shekhar
BRF Oldie
Posts: 2178
Joined: 03 Jan 2010 23:26

Re: Indian Space Programme Discussion

Post by Varoon Shekhar »

He is very natural, non-bureaucratic and pleasant to listen to. He is very sincere in his praise of ISRO, and is obviously deeply moved by its successes like the Mars mission and the GSLV.
Locked