Old and slow are not identical. Not all Shinkansen runs at 300-350km/h . Only the Tokaido/Sanyo Shinkansen (Tokyo to Osaka and Hakata) southwards and the Tohoku & Akita Shinkansen northwards do. There are multiple other 'mini Shinkansens' that are constrained to operate at slower speeds.

The Japanese are welcome to build a Shinkansen line, provided they fund it. IR itself should invest in its own network first, continuing its present plans.
Kashi
BRF Oldie
Posts: 3671
Joined: 06 May 2011 13:53

Re: Indian Railways Thread

Post by Kashi »

Suraj wrote:Old and slow are not identical. Not all Shinkansen runs at 300-350km/h . Only the Tokaido/Sanyo Shinkansen (Tokyo to Osaka and Hakata) southwards and the Tohoku & Akita Shinkansen northwards do. There are multiple other 'mini Shinkansens' that are constrained to operate at slower speeds.

The Japanese are welcome to build a Shinkansen line, provided they fund it. IR itself should invest in its own network first, continuing its present plans.
Tokaido Shinkansen runs at a maximum of 275km/h, though the trains are capable of running at higher speeds as they indeed do after crossing Shin-Osaka. The speeds on Tokyo-Osaka route are constrained due to many reasons- noise regulations, gradient curve, traffic density on the Tokaido mainline etc.

The mini Shinkansens run at lower speeds due to a variety of constraints such as gauge changes and track-sharing (some of which are not fenced).

The Japanese seem to be eager to export Shinkansen to India and JR Maglev to USA and after losing the Indonesian HSR bid to China (which was a very sore spot for them), they maybe unwilling to let the same happen in India again. I reckon there will be some serious bargaining and pitching on this when the two PMs meet.

Of course, tech share will be an issue, because Japanese may insist on the trains being built at Kawasaki heavy industries factories in Japan, while we will rightly insist on tech transfer and local production.
Singha
BRF Oldie
Posts: 66601
Joined: 13 Aug 2004 19:42
Location: the grasshopper lies heavy

Re: Indian Railways Thread

Post by Singha »

they are being eaten alive by cheen HSR + funding pkg in any contest. I would not be surprised if cheen also lands hsr contracts in parallel here. they have become self-taught masters at civil and railway engineering by investing huge over 10 years
Prasad
BRF Oldie
Posts: 7793
Joined: 16 Nov 2007 00:53
Location: Chennai

Re: Indian Railways Thread

Post by Prasad »

Would it make any sense for us to have multiple HSR tech and trainsets? Interoperability should be a main concern no?
Kashi
BRF Oldie
Posts: 3671
Joined: 06 May 2011 13:53

Re: Indian Railways Thread

Post by Kashi »

Prasad wrote:Would it make any sense for us to have multiple HSR tech and trainsets? Interoperability should be a main concern no?
It depends on what we want in the long term. As of now we are probably looking at standalone HSR links between major centres- Delhi-Mumbai, Hyderabad-Bangalore-Chennai etc. They'll probably be operated by independent companies.

Even if the systems are linked together eventually, we are unlikely to see a passenger travel all the way from Delhi to Chennai via Mumbai and Bangalore. They'll prefer a more direct route. HSRs will provide short links and interoperatibility shouldn't really be that big an issue.
Supratik
BRF Oldie
Posts: 6470
Joined: 09 Nov 2005 10:21
Location: USA

Re: Indian Railways Thread

Post by Supratik »

As long as there is no inter-operability issue it should be fine to have different systems on different lines. The main issue is whether the Chinese give loans on as favorable condition as the Japanese. Thankfully IR will not have to pay from their pocket.
Suraj
Forum Moderator
Posts: 15043
Joined: 20 Jan 2002 12:31

Re: Indian Railways Thread

Post by Suraj »

Japan poised to win India's bullet train deal: Nikkei Reports
Japan is expected to win the right to construct India's first bullet train, after losing an Indonesian high-speed rail deal to China, the Nikkei business daily reported on Tuesday.

Japan will offer more than 1 trillion yen ($8.11 billion) in loans to construct India's 980 billion rupee fast train, according to the report.

Japan recently lost the bid to build Indonesia's first fast-train because Beijing provided a $5 billion loan without guarantees.

Japanese Prime Minister Shinzo Abe, due to visit India this week, and his counterpart Narendra Modi are expected to issue a joint statement on the deal, the Nikkei said.
Prasad
BRF Oldie
Posts: 7793
Joined: 16 Nov 2007 00:53
Location: Chennai

Re: Indian Railways Thread

Post by Prasad »

Still can't wrap my head around that number. Unbelievable numbers being thrown about. How do we repay that kind of money? Are the finances in deals like this clearly elucidated anywhere? All I find are articles like the above.
Rishirishi
BRFite
Posts: 1409
Joined: 12 Mar 2005 02:30

Re: Indian Railways Thread

Post by Rishirishi »

at 0,5 % finance it is a great deal. Yet the interest alone is 40 million dollars per year. And you have to calculate the depreciation and maintnace costs. I think a conventional upgrade to 200 Km per hour would have done the trick. Mumbai to Ahemedabad in 3 hours is a good option at much lower price.
Kashi
BRF Oldie
Posts: 3671
Joined: 06 May 2011 13:53

Re: Indian Railways Thread

Post by Kashi »

We need to insist on substantial tech transfer and local manufacturing. None of "Shinkansen technology is very complex, only the very skilled Japanese workers have the know how to do so at Kawasaki Heavy Industries."

Of course, Japanese maybe a tad reluctant since infrastructure projects are their forte and bread and butter and after the Chinese experience, where they made off with Japanese technology and have started undercutting them in financial bids around the world, their reluctance would be understandable.

We could also do our bit to ally their apprehensions- royalty payments, joint future bids etc.
Singha
BRF Oldie
Posts: 66601
Joined: 13 Aug 2004 19:42
Location: the grasshopper lies heavy

Re: Indian Railways Thread

Post by Singha »

we should carefully put in HSR signaling systems that are compatible with any train either right away (some global std) or with minimal MLU changes.

once such huge changes go in, they will outlast the trainsets , which will keep evolving and we need choice to run multiple vendors later since our BG gauge is std

lets not get carried away by the shiny trains.
Gyan
BRFite
Posts: 1183
Joined: 11 Aug 2016 06:14

Re: Indian Railways Thread

Post by Gyan »

It should be 100 year loan at -1% rate of interest.
SaiK
BRF Oldie
Posts: 36424
Joined: 29 Oct 2003 12:31
Location: NowHere

Re: Indian Railways Thread

Post by SaiK »

Kashi wrote:We need to insist on substantial tech transfer and local manufacturing. None of "Shinkansen technology is very complex, only the very skilled Japanese workers have the know how to do so at Kawasaki Heavy Industries."

Of course, Japanese maybe a tad reluctant since infrastructure projects are their forte and bread and butter and after the Chinese experience, where they made off with Japanese technology and have started undercutting them in financial bids around the world, their reluctance would be understandable.

We could also do our bit to ally their apprehensions- royalty payments, joint future bids etc.
+1

---

PS : RE bullet plan, they should do

Amritsar to TVM via delhi, Ahmed, mumbai, mangalore.
TVM to Kolkatta via BLR, Chennai and vizag.
Then kolkatta to dilli via varnasi.

In between, they can connect EW & NS lane.
SaiK
BRF Oldie
Posts: 36424
Joined: 29 Oct 2003 12:31
Location: NowHere

Re: Indian Railways Thread

Post by SaiK »

Not IR, but linking here to get an idea of 'impossible engineering' by the Chinese
https://www.youtube.com/watch?v=EjSKugzw59o

the only maglev in the world. like they say, it appears to defy fizzics
Karthik S
BRF Oldie
Posts: 5380
Joined: 18 Sep 2009 12:12

Re: Indian Railways Thread

Post by Karthik S »

SaiK wrote:Not IR, but linking here to get an idea of 'impossible engineering' by the Chinese
https://www.youtube.com/watch?v=EjSKugzw59o

the only maglev in the world. like they say, it appears to defy fizzics
It is German technology. Now Japanese have even a faster maglev train.
Rahul M
Forum Moderator
Posts: 17168
Joined: 17 Aug 2005 21:09
Location: Skies over BRFATA
Contact:

Re: Indian Railways Thread

Post by Rahul M »

Gyan wrote:It should be 100 year loan at -1% rate of interest.
do you ever post anything meaningful ? all I see from you is nonsense like this ^^.
Kashi
BRF Oldie
Posts: 3671
Joined: 06 May 2011 13:53

Re: Indian Railways Thread

Post by Kashi »

Rahul M wrote:do you ever post anything meaningful ? all I see from you is nonsense like this ^^.
Really underscores the irony of user names on internet fora doesn't it?
Ankit Desai
BRFite
Posts: 634
Joined: 05 May 2006 21:28
Location: Gujarat

Re: Indian Railways Thread

Post by Ankit Desai »

It will be between Ahmedabad-Mumbai.
The bullet train accident in China four years ago along with low-cost finance and a promise to have a substantial 'Make in India' component and transfer of technology clinched the deal for Japan to build the first high-speed train that will run between Mumbai and Ahmedabad — with the possibility of extending it to Delhi in future.
Japan pips China to build India’s first bullet train

-Ankit
chetak
BRF Oldie
Posts: 32290
Joined: 16 May 2008 12:00

Re: Indian Railways Thread

Post by chetak »

Ankit Desai wrote:It will be between Ahmedabad-Mumbai.
The bullet train accident in China four years ago along with low-cost finance and a promise to have a substantial 'Make in India' component and transfer of technology clinched the deal for Japan to build the first high-speed train that will run between Mumbai and Ahmedabad — with the possibility of extending it to Delhi in future.
Japan pips China to build India’s first bullet train

-Ankit

what's so great between these two particular cities that we have to spend a bomb on a bullet train??

I am sure that we can get a much bigger bang for the buck, investing in maybe other more inclusive railway projects, benefiting a much larger set of people.

my two paise onlee.
Suraj
Forum Moderator
Posts: 15043
Joined: 20 Jan 2002 12:31

Re: Indian Railways Thread

Post by Suraj »

chetak wrote:what's so great between these two particular cities that we have to spend a bomb on a bullet train??

I am sure that we can get a much bigger bang for the buck, investing in maybe other more inclusive railway projects, benefiting a much larger set of people.

my two paise onlee.
We aren't. The Japanese are funding the project, and we are not guaranteeing the investment for them.

IR's existing investment plans to expand its general network remain unchanged.
Rishirishi
BRFite
Posts: 1409
Joined: 12 Mar 2005 02:30

Re: Indian Railways Thread

Post by Rishirishi »

nukavarapu wrote:But if we are building high speed in 21st century then why do it with yesterday's technology? If they are going to run high speed trains on tracks, its better to realign the existing tracks and improve the quality of tracks, train sets and associated infrastructure so that speeds can be increased gradually to 150 kmph and finally to 300 kmph. Whether it's japan's money or whether its India's money, there is always a more sensible way to spend money. But if they are doing brand new infrastructure then why not maglev as that is the future. I assume with the unique challenges india has to offer, they will pretty much do via-duct all the way or most of it. So why not a maglev so in future, we can have glass or metal enclosures throughout the path, make it a vacuum environment and increase the speeds to 1000 kmph. I guess Musk did propose something like that in underground. Gradually this form of travel will be more cost effective then the rails and ballast system and will be far more cost effective and even faster than flights.
In current conditions the bullet train is going to work out too expensive, as even the tickets are going to be as high as flights. However the benefits are

1 For once india is planning for the future. Indians cant afford the train today, but will do in 15 years time, when incomes are quadrupled. India will have experiance and technology available to build high speed trains for all large cities.

2 Do not forget the huge industrial belt in between. Mumbai, Surat, Varoda and Ahemedabad. The benefit is not only between Mumbai and Ahm. It is also between all the cities on the route. Ahm-surat can for example be done in less then an 2 hours and Surat-Varoda in less then 40 min.

3
There is a longterm plan of Delhi-mumbai industrial corridor. This can transform India. Sunpower is plenty in Rajastan, Mumbai has the port. In between are cities like Surat, Varoda, Ahm, udaipur, Ajmer and Jaipur.
Kashi
BRF Oldie
Posts: 3671
Joined: 06 May 2011 13:53

Re: Indian Railways Thread

Post by Kashi »

Rishirishi wrote: In current conditions the bullet train is going to work out too expensive, as even the tickets are going to be as high as flights. However the benefits are

1 For once india is planning for the future. Indians cant afford the train today, but will do in 15 years time, when incomes are quadrupled. India will have experiance and technology available to build high speed trains for all large cities.
That's not entirely correct. The argument rests on the premise that the tickets will be as expensive as airfare. However, on the trunk routes (Ahmedabad-Mumbai is a part of one), flights are usually full and aplenty, suggesting that there is enough demand for speedy, convenient travel between key centres.

It is estimated that about 1 lakh people commute between Gujarat and Mumbai daily- most of them for business. If the new Shinkansen is able to lure even a quarter of them, it would be a good start.

And as you rightly pointed out, when more and more people become comfortable with Shinkansen travel, we would have build up the necessary expertise to expand our fledgling network.
Kashi
BRF Oldie
Posts: 3671
Joined: 06 May 2011 13:53

Re: Indian Railways Thread

Post by Kashi »

nukavarapu wrote:I was talking more in terms of technology and affordability point of view. I never said that there are no benefits out of it. My grind is that we are going to create another white elephant with yesterday's technology. Realigning existing rail lines and increasing the speed to about 200 kmph will be more cost effective and beneficial compared to a brand new turnkey infrastructure using viaducts, just to create another metal rail & ballast based high speed.
Is it really? In terms of work you are looking at a very similar challenges. It's not just realignment (which will come with it's own set of issues when it comes to land acquisition), but you must replace the tracks, the rolling stock, signalling, staff and crew training and fencing. Where the trunk routes pass through heavily populated sections, fencing alone will not be enough and you'll have to go the elevated way. Then there is the political hot potato of raising passenger fares to make up for the increased cost. One can only imagine how cost-effective this initiative will be.

Of course, what can be done is move freight to DFC, increase the passenger train speeds to consistently run at 160 km/h and streamline the signalling operations- something that I believe the railways are looking at (or at least should be looking at).
Suraj
Forum Moderator
Posts: 15043
Joined: 20 Jan 2002 12:31

Re: Indian Railways Thread

Post by Suraj »

nukavarapu wrote:But if we are building high speed in 21st century then why do it with yesterday's technology?
Justify your argument as to why you consider it yesterday's technology.
Karthik S
BRF Oldie
Posts: 5380
Joined: 18 Sep 2009 12:12

Re: Indian Railways Thread

Post by Karthik S »

nukavarapu wrote: My justification is maglev is available and can be more cost effective in future compared to tracks with ballast. If we are building new infrastructure, why not do it with maglev instead of doing tracks and ballast? Vaccum based maglev ducts can accelerate trains to speeds more or equal to aeroplanes and can carry more people with a fraction of cost. You can never do that with regular tracks with ballast.
How so? The 30 km Shanghai Maglev train was built at a cost of $1.2 billion more than a decade back. Without considering the effect of inflation, a line that's 17 times longer will cost $20 billion now. Also, China built most of its high speed network after Shanghai Maglev train operation started. Why didn't they go for Maglev if it'd be more cost effective in future?
SwamyG
BRF Oldie
Posts: 16267
Joined: 11 Apr 2007 09:22

Re: Indian Railways Thread

Post by SwamyG »

So Ahmedabad to Mumbai will be in 2 hours, considering Surat is almost in the half way mark it would take about an hour. This will spur more travel and economic activity.
As far as technology goes, this train is just between two cities. There is always opportunity to incorporate newer high speed trains and technology in other parts of the country. China and Japan have mixed high speed trains.
It is a first step, but a good step.
SSundar
BRFite
Posts: 626
Joined: 11 Aug 2016 06:14

Re: Indian Railways Thread

Post by SSundar »

nukavarapu wrote: My justification is maglev is available and can be more cost effective in future compared to tracks with ballast. If we are building new infrastructure, why not do it with maglev instead of doing tracks and ballast? Vaccum based maglev ducts can accelerate trains to speeds more or equal to aeroplanes and can carry more people with a fraction of cost. You can never do that with regular tracks with ballast.
Nukavarapu, Maglev is truly a white elephant. It is a very expensive way to earn bragging rights - truly a "mine is bigger than yours" claim. It is not easy to use for mass transport that can scale up as the demand increases. The track is an active component in the propulsion of the maglev. So, the cost ought to be orders of magnitude higher than conventional rail.

The Shanghai Maglev has two trains on two fixed tracks going back and forth on the 40 KM stretch between the city outskirts and the airport. The last time I went on these, one was running at 430 KMPH and the other one was stuck at 300 KMPH for some reason. 300 KMPH is the speed at which the conventional HSRs in China, Japan and Europe run. You don't need maglev if the speed you need is 300 KMPH.

The Beijing-Shanghai HSR is 1500+ kilometers long. It covers the distance in 5 hours with a stop in Nanjing. If this line had been a maglev running at 430 KMPH, you would cover this distance in 3 hours and 49 minutes. But the cost would be orders of magnitude higher. Is a cost of $45 billion worth the 1 hour 11 minutes in time savings? Lots of variables go into figuring the ROI out for a venture like this. I am not an expert at calculating ROI for a project like that, but my gut feeling that it will not have good ROI.

Today, you take a train for 40 hours to go from Chennai to Delhi (2176 KM). You would probably take about 7-8 hours doing the same over flight - add airport transit, wait times, cost of delays, etc. The nation loses the productivity of each travelling individual for anywhere between 7 and 40 hours per trip.

A 300 KMPH HSR can cover that distance in under 8 hours. That is a huge gain in productivity for the entire nation. Net ROI for the country would go through the roof. I would argue that bringing down that time to 5 hours with a 430 KMPH maglev will NOT bring a proportional benefit to the nation. The incremental ROI won't be worth it. The cost-benefit curve tends to become a flat line in that zone.
Last edited by SSundar on 11 Dec 2015 21:42, edited 1 time in total.
SSundar
BRFite
Posts: 626
Joined: 11 Aug 2016 06:14

Re: Indian Railways Thread

Post by SSundar »

Kashi wrote:That's not entirely correct. The argument rests on the premise that the tickets will be as expensive as airfare. However, on the trunk routes (Ahmedabad-Mumbai is a part of one), flights are usually full and aplenty, suggesting that there is enough demand for speedy, convenient travel between key centres.

It is estimated that about 1 lakh people commute between Gujarat and Mumbai daily- most of them for business. If the new Shinkansen is able to lure even a quarter of them, it would be a good start.
My grandfather did business with merchants in Surat. He traveled there from Chennai at least once every quarter. Two days in the train each way. He did that for at least 35 years that I know of. In his last days, low cost airlines made it easier for him to fly to Mumbai and then take the train to Surat. Many in his line of business make this trip very often. So, the demand for Mumbai-Surat-Ahmadabad includes a lot of traffic that originates outside Mumbai or Gujarat. The demand is there and this route is a really good one to prove out the economics and macroeconomic impact of HSR.

Besides, when Mamata or Laloo become Rail Mantri, they announce new trains to completely undeserving and unviable places in their states/constituencies. One could claim that Japan is investing in this project at least partly due to their relationship with Modi. He absolutely deserves to send this project to "his city".
SSundar
BRFite
Posts: 626
Joined: 11 Aug 2016 06:14

Re: Indian Railways Thread

Post by SSundar »

SwamyG wrote:So Ahmedabad to Mumbai will be in 2 hours, considering Surat is almost in the half way mark it would take about an hour. This will spur more travel and economic activity.
As far as technology goes, this train is just between two cities. There is always opportunity to incorporate newer high speed trains and technology in other parts of the country. China and Japan have mixed high speed trains.
It is a first step, but a good step.
+1

1. The economic activity surge will be enormous. We cannot look at HSRs through the conventional prism of ticket prices and infrastructure costs.

2. Every pair of destinations will have its own ideal duration of travel as well as ideal hours of departure and arrival. That "sweet time" needs to be exploited to the max. Train speeds should be subordinated to this requirement, not the other way round.

3. India should indeed require standardization between Japanese, Chinese and European-origin HSRs, but only in terms of gauge, voltage-current requirements, communication and signaling systems.

4. Hopefully, the HSR operations will start from and continue to be with private parties and not end up in the hands of a bureaucracy such as IR.
SwamyG
BRF Oldie
Posts: 16267
Joined: 11 Apr 2007 09:22

Re: Indian Railways Thread

Post by SwamyG »

If the Maglev is forced to only 300kmh, then a 'regular' HSR definitely should be pursued now. I traveled in Frecciarossa 1000 in Italy, from Rome to Pompeii. It maxed at 293kmh and there was very little noticeable vibrations in the coach. Only the TV monitors announced the speed. The train for most part was operated in the 250-270 kmh range for a journey of 1 hour. Its full potential was not exercised :-)

I would expect the usage between Ahmedabad to Surat would be high. By the time the train is operational our eInfra (electronic infrastructure) would have advanced even more. Tech/Gadget savvy people will pay for their journey online using their mobile phones, get the some kind of eTicket, scan the eTickets at turnstiles on the platform and walk into their AC coaches, start working/browsing and reach their destination in 1 hour. Considering the train station drop off and pick up by a cab add 2 more hours. So from door to door, 3 hours Ahmedabad to Surat is a possibility. The only traffic snarls would be on the roads, so add another hour to the total trip. With WiFi, and other facilities inside the train, or even if people bought their WiFi dongles people will remain connected for the 2 hours.

Day trips from Ahmedabad to Mumbai becomes possible, increases tourism opportunities.

At this point in time, it is unnecessary for India to do a jump to Maglev trains. Let us move to recently developed HSRs (the non-Maglev types), master them by building more routes and then incorporate Maglev after some time. Biting a chewable project will help us master the technology and more importantly for India the project management of making a HSR a reality.

Indian companies have build stadiums in record times whenever there was a strong political will with good quality. So India can do it, lets take a nibble first then we can take larger bites.

There is no big benefit for being one of the technology adapters (though a little late).
Singha
BRF Oldie
Posts: 66601
Joined: 13 Aug 2004 19:42
Location: the grasshopper lies heavy

Re: Indian Railways Thread

Post by Singha »

quite a few inter-city routes in the country like kolkata-patna, kolkata-guwahati, kolkata-ranchi, Hyd-vizag, Hyd-chennai,Hyd-blr, blr-chennai, chennai-tvm might be profitable quite easily with even a 150kmph average "junior" HSR ... it will revolutionize our travel economy if we can convert even 25% of our track mileage to permit 180kmph surges and 150kmph avg.

eg howrah to guwahati is 900 km. it is a 24 hr journey, and then people spend another 24 hrs travelling to far flung corners of NE mostly by bus or by train to dibrugarh and onward. if this journey is cut down to 6 hrs + 1 hr for slowly leaving and entering the cities at both ends......it changes the entire travel economy to NE.

however track alignments simply cannot be "made strong" in many cases, there will be many curves that will need new alignments (like the famous makalidurga climb into blr plateau from hyd side, the curves on the blr-chennai route).....so its not a cheap fix. many old bridges will need replacement.

but its inevitable if we want to make progress into a upper middle income country. will hugely prime our construction industry as well

once the east and west frieght corridors get done I hope they start such improvements countrywide.
SwamyG
BRF Oldie
Posts: 16267
Joined: 11 Apr 2007 09:22

Re: Indian Railways Thread

Post by SwamyG »

I like to tell for a rich country Americans are poor, and for a poor country Indians are rich. Every time I travel to India, and fly between cities I look at the passengers taking domestic flights my jaw drops. 10-15 years ago I would never have imagine these types of people would be flying. When I say "these types" I mean we have the stereotype of poor or lower middle income people clad in ethnic outwear and looking very non-chichi. Growing up, there was a thought only the rich flew and a middle class flew once or twice per life time - due to odd reason.

With booming economy, every Ramu and Rani are flying. They have the money, they want the convenience and the modern pleasures of travel.

Build HSR, and appropriate supporting infrastructure people will come flocking to them. There would be no empty trains. Phool paisa will be vasooled.
Singha
BRF Oldie
Posts: 66601
Joined: 13 Aug 2004 19:42
Location: the grasshopper lies heavy

Re: Indian Railways Thread

Post by Singha »

true..for one time let infra capacity lead demand...in india is vastly the other way around.

municipality builds electric poles, roads and drains after people are done building houses...or never at all properly.

UP and Bihar belt have very few airports but a lot of medium sized business hub towns....agra, moradabad, aligarh, mughalsarai, gorakhpur, varanasi, allahabad, kanpur....huge market there also for fast intercity day trains.
Prasad
BRF Oldie
Posts: 7793
Joined: 16 Nov 2007 00:53
Location: Chennai

Re: Indian Railways Thread

Post by Prasad »

Suraj wrote:
chetak wrote:what's so great between these two particular cities that we have to spend a bomb on a bullet train??

I am sure that we can get a much bigger bang for the buck, investing in maybe other more inclusive railway projects, benefiting a much larger set of people.

my two paise onlee.
We aren't. The Japanese are funding the project, and we are not guaranteeing the investment for them.

IR's existing investment plans to expand its general network remain unchanged.
No economist so didn't understand what you're saying here. We do have to repay them no? Or is it like a commercial venture that the japanese are doing with their own funding, pricing and exit strategy? If this is a loan to india/IR then its a humungous amount of money.
Kashi
BRF Oldie
Posts: 3671
Joined: 06 May 2011 13:53

Re: Indian Railways Thread

Post by Kashi »

Singha wrote:UP and Bihar belt have very few airports but a lot of medium sized business hub towns....agra, moradabad, aligarh, mughalsarai, gorakhpur, varanasi, allahabad, kanpur....huge market there also for fast intercity day trains.
Varanasi in particular could be the interchange and transfer hub for the entire poorvanchal region. The flights to Delhi are reasonably occupied and trains too. A Delhi-Mathura-Agra-Kanpur-Allahabad-Varanasi section in principle could be chock-a-block full of businessmen, tourists and pilgrims.
SSundar
BRFite
Posts: 626
Joined: 11 Aug 2016 06:14

Re: Indian Railways Thread

Post by SSundar »

Prasad wrote: No economist so didn't understand what you're saying here. We do have to repay them no? Or is it like a commercial venture that the japanese are doing with their own funding, pricing and exit strategy? If this is a loan to india/IR then its a humungous amount of money.
We do not know yet who will operate the HSR and what the rev sharing arrangement is. It maybe a few years before we know all these details.
Suraj
Forum Moderator
Posts: 15043
Joined: 20 Jan 2002 12:31

Re: Indian Railways Thread

Post by Suraj »

Prasad wrote:No economist so didn't understand what you're saying here. We do have to repay them no? Or is it like a commercial venture that the japanese are doing with their own funding, pricing and exit strategy? If this is a loan to india/IR then its a humungous amount of money.
This is nothing more than FDI in a railway project. It's their venture, not ours. They front up the capital and technology, and in return require a minimum amount of product to be sourced from Japan (30-40% ?). They'll have a BOT arrangement of some kind to get back their investment, but it's not guaranteed that they will get it back, if ridership turns out to be lower than their calculations etc. There's no sovereign guarantee of the 'build this for us, we'll pay you back $X billion in Y years at Z% rate' kind. Companies invest in India and then make or lose money all the time. This is just one more FDI case. Another FDI in railways case was the recent awarding of the diesel loco plant to GE and the electric loco plant to Alstom.
hanumadu
BRF Oldie
Posts: 5168
Joined: 11 Nov 2002 12:31

Re: Indian Railways Thread

Post by hanumadu »

Suraj wrote:
Prasad wrote:No economist so didn't understand what you're saying here. We do have to repay them no? Or is it like a commercial venture that the japanese are doing with their own funding, pricing and exit strategy? If this is a loan to india/IR then its a humungous amount of money.
This is nothing more than FDI in a railway project. It's their venture, not ours. They front up the capital and technology, and in return require a minimum amount of product to be sourced from Japan (30-40% ?). They'll have a BOT arrangement of some kind to get back their investment, but it's not guaranteed that they will get it back, if ridership turns out to be lower than their calculations etc. There's no sovereign guarantee of the 'build this for us, we'll pay you back $X billion in Y years at Z% rate' kind. Companies invest in India and then make or lose money all the time. This is just one more FDI case. Another FDI in railways case was the recent awarding of the diesel loco plant to GE and the electric loco plant to Alstom.
Then, from where does this talk of .5 interest rate comes from. Fro what I have read, it is a loan and not FDI.

http://www.deccanherald.com/content/508 ... dabad.html
Japan has offered soft loan for the Mumbai-Ahmedabad bullet train project. The railway ministry is studying the conditionality of the loan which will involve transfer of technology and purchase of materials including coaches and locomotives.

“The discussions are on. Railway Minister Suresh Prabhu had last month discussed the matter with the Japanese government during his visit to Japan,” a high official told Deccan Herald.

The Japan is ready to fund 80 per cent cost of the project and wants India to purchase 30 per cent of coaches and locomotives from Japanese companies.

The railway ministry is evaluating the cost-benefit ratio of the project. According to officials, the rate of return on this Rs 98,000 crore project is estimated to be around 4 per cent. So, interest on the loan should not exceed this amount.
vsunder
BRFite
Posts: 1356
Joined: 06 Sep 1999 11:31
Location: Ulan Bator, Mongolia

Re: Indian Railways Thread

Post by vsunder »

Short video clip on Dedicated Freight Corridors. See my previous post above on what I witnessed between Delhi and Kanpur of construction activity on EDFC, Nov 5th, 2015 a month ago. Coming back by LKO Shatabdi it had gotten dark and Shatabdi struck goats near Etwah( outside Ekdil station) and was delayed by 45mins. The problems of Land acquisition will remain and are quite acute, and will also impact HSR too. Nothing is simple in India.

https://www.youtube.com/watch?v=xblzCXk2tUk
vsunder
BRFite
Posts: 1356
Joined: 06 Sep 1999 11:31
Location: Ulan Bator, Mongolia

Re: Indian Railways Thread

Post by vsunder »

Doubling of Mysore to Bangalore line is done and trains are running since Nov 30th on it except for a 1.3km section between Srirangapatna and Pandavapura where Tippu's armory is to be shifted. Bejesus this shifting has been going on for a decade. The latest is that this US company will put the Armory onto wheels and roll it 100m away by March so that tracks can be laid and the doubling can be completed. This is supposed to decrease travel time between Mysore to Bangalore from 3 hours to 2 hours. But take all this with a pinch of salt. Trains coming from Mysore are usually stopped at Nayandahalli outer as there are not enough pit and washing lines at Bangalore city to move rakes out of station platforms. Maybe there are some newer pit and washing lines constructed at Binny Mills. They need to decongest Bangalore city station some more.

Mysore to Shirdi Sai Nagar Express was the first train to use the newly laid double line between Mysuru and Bangalore. Electrification of this section will take another decade given the super efficiency of SWR. Now they say some old overhead transmission lines are in the way of electrification of Mysuru-Bengaluru.
Bengaluru to Ramnagar is electrified. Ramnagar-Mysuru still waits to be electrified.
Somebody needs to give SWR a real kick in their rear ends. They have mega projects on their hands I expect a real cockup. Chikjajur-Hubbali doubling, Arsikere-Tumkur doubling and the important Bengaluru-Penukonda doubling on the Hyderabad-Bangalore route. Tenders for all have been floated October 2015 and Niti Aayog had warned SWR that they want completion of all these important projects in 4 years.

Pic of Paschimvahini bridge over Kaveri ( the girder bridge is newly laid, hope it has enough clearance for electrification!!) and Tippu's armory blocking in front. Tracks have to be laid over the bridge too:

http://i1055.photobucket.com/albums/s51 ... C_0496.jpg

But the pace of IR projects is glacial. The important third line project that got started in June 2015, Bhopal-Itarsi which is 50 miles and does have a small ghat section at Midghat is scheduled for completion in 2020,
and this is a Class A line on Delhi-Chennai route and Delhi-Mumbai route via Itarsi-Khandwa-Bhusaval.

Update on Shoranaur(SRR)-Mangalore electrification: As observed by me upto Dec 1st, traction poles are in the ground on the entire route upto MAQ(Mangalore Central) and the line from MAQ to MAJN(Mangalore Jn.). However between Kasaragod and Mangalore the poles are on just side, that is only the up or down lines have traction poles, wiring is also not complete. Before Kasaragod, Kanhangad etc, wiring is complete. However electric locos are only plying between SRR and Kallayi, not even Kozhikode. Some ROB was not raised high enough near Kozhikode so CRS has banned electric locos entering Kozhikode. There is some wire clearance requirement. After ROB was raised, old requirements were met, but failed new requirements. If ROB is raised more the whole decrepit thing will simply collapse and die and there will be a serious mess, various people will shut down the state of Kerala. Also there is some "ghotala" regarding some sub-station at Tirur, land acquisition problem. I bet you these things will even sink the Japanis when they come to build the HSR, pagal kardega. All these are personal observations made on the above spots.

http://www.thehindu.com/todays-paper/tp ... 051378.ece