The Technology & Economic Forum is a venue to discuss issues pertaining to Technological and Economic developments in India. We request members to kindly stay within the mandate of this forum and keep their exchanges of views, on a civilised level, however vehemently any disagreement may be felt. All feedback regarding forum usage may be sent to the moderators using the Feedback Form or by clicking the Report Post Icon in any objectionable post for proper action. Please note that the views expressed by the Members and Moderators on these discussion boards are that of the individuals only and do not reflect the official policy or view of the Bharat-Rakshak.com Website. Copyright Violation is strictly prohibited and may result in revocation of your posting rights - please read the FAQ for full details. Users must also abide by the Forum Guidelines at all times.
Singha
BRF Oldie
Posts: 66601
Joined: 13 Aug 2004 19:42
Location: the grasshopper lies heavy

Re: Indian Roads Thread

Post by Singha »

CM Yogi Adityanath approves construction of the ganga expressway connecting Meerut to Allahabad 600km.
Delhi and Meerut already have a expressway in construction which should be all done in a year. near delhi, it is 14 lanes to handle traffic.

IBN

The chief minister, who presided over the meeting, told reporters that the Cabinet gave its approval for the construction of the 600 km expressway, which will be the longest expressway in the world.


It will start from Meerut and touch Amroha, Bulandshahr, Badaun, Shahjahanpur ,Farrukhabad, Hardoi, Kannauj, Unnao, Rae Bareli, Pratapgarh before reaching Allahabad, he said.


This expressway will require 6,556 hectares of land and it will be access-controlled and four-lane expandable to six lanes, Adityanath said, adding the estimated cost of this project will be around R 36,000 crores.
Supratik
BRF Oldie
Posts: 6470
Joined: 09 Nov 2005 10:21
Location: USA

Re: Indian Roads Thread

Post by Supratik »

How Lavato is revolutionizing highway toilet experience in India.

https://swarajyamag.com/business/in-the ... ry-service
Mollick.R
BRFite
Posts: 1033
Joined: 15 Aug 2016 10:26

Re: Indian Roads Thread

Post by Mollick.R »

CM Yogi Adityanath approves construction of the ganga expressway connecting Meerut to Allahabad Prayagraj :D 600km. Delhi and Meerut already have a expressway in construction which should be all done in a year.
Supratik
BRF Oldie
Posts: 6470
Joined: 09 Nov 2005 10:21
Location: USA

Re: Indian Roads Thread

Post by Supratik »

Delhi-Saharanpur expressway 12 lane (3M + 3S) AV from PIB.

https://youtu.be/Z7UjIvTD1Es
Singha
BRF Oldie
Posts: 66601
Joined: 13 Aug 2004 19:42
Location: the grasshopper lies heavy

Re: Indian Roads Thread

Post by Singha »

i fully believe the claim that NCR will soon be a 100 million "country" soon. they have done good job integrating all neighbouring states into the economic & transport ecosystem and place continues to attract migrants as a job creating +ve hub.
its already 50 mil

haridwar imo can be a strong domestic airport and save the 6 hr journey via meerut and muzzafarnagar. it attracts hordes from all over india.
dehra dun airport can be enlarged. between tourists and pilgrims these two places are quite viable. if I have no business in dilli but want to trek or visit himalaya for pilgrimage would rather fly there via dilli than waste time negotiating dilli city. i hope to see shoals of silver painted ATR72 types streaming to these places.

Image
Supratik
BRF Oldie
Posts: 6470
Joined: 09 Nov 2005 10:21
Location: USA

Re: Indian Roads Thread

Post by Supratik »

You can fly directly to Dehradun's Jolly Grant airport if you have connection from your city and do the himalayas.
Supratik
BRF Oldie
Posts: 6470
Joined: 09 Nov 2005 10:21
Location: USA

Re: Indian Roads Thread

Post by Supratik »

12 lane (3M + 3S) Faridabad bypass/expressway to start.

https://www.tribuneindia.com/news/weekl ... 22720.html
Mollick.R
BRFite
Posts: 1033
Joined: 15 Aug 2016 10:26

Re: Indian Roads Thread

Post by Mollick.R »

X-post from railways thread....

Have seen this as Breaking News on 28th after CCEA meeting. Reservation issue of of J&K residents and this in principal approval of Bridge over River Brahmaputra between Dhubri (on North Bank, Assam) and Phulbari (On South Bank, Meghalaya) was the top decision taken on that meeting.

Due to Border tensions, was busy following those threads & forgot to post it here.
Excellent decision, hope construction progresses smoothly and finishes on time.
(adds to another reason we need NAMO back for that :D )

Press Information Bureau
Government of India //Cabinet Committee on Economic Affairs (CCEA)// 28-February-2019 22:41 IST
Cabinet approves construction of four lane bridge including approaches over River Brahmaputra between Dhubri (on North Bank, Assam) and Phulbari (On South Bank, Meghalaya) on NH-127B with loan assistance from JICA

The Cabinet Committee on Economic Affairs chaired by the Prime Minister today approved construction of four lane bridge including approaches over river Brahmaputra between Dhubri on North Bank and Phulbari on South Bank on NH-127 B in the State of Assam/Meghalaya. The total length of the bridge will be 19.282 km.

The bridge will be built under the scheme of North-East Road Network Connectivity Project Phase-03’ under loan assistance with JICA at the civil construction cost of Rs.3548 crore and total capital cost of Rs.4997.04 crore including the cost of Rs.55.68 crore towards the cost of land acquisition, resettlement & rehabilitation and other pre construction activities. The completion of the project will take approximately six years’ period.

The project has strategic and socio-economic importance. The project shall be an instrument for the development of the most economically backward districts in the states of North East. The construction of this bridge project over river Brahmaputra will save huge travel distance from 205.3 km to only 19.282 km and saving in time of five hours to 20 minutes between Dhubri in Assam and Phulbari in Meghalaya. This alignment will further augment the transport network for the region by providing the shortest link between the western regions of Meghalaya as well as Barak valley region of Assam and southern states in NE namely Manipur, Mizoram and Tripura and the rest of the country, including the ports of Kolkata
http://pib.nic.in/newsite/PrintRelease. ... lid=189099
Last edited by Mollick.R on 04 Mar 2019 17:30, edited 1 time in total.
Mollick.R
BRFite
Posts: 1033
Joined: 15 Aug 2016 10:26

Re: Indian Roads Thread

Post by Mollick.R »

X-post from railways thread....
Another few links on same subject (Centre Approves 4-Lane Bridge over Brahmaputra), with some additional details....

Business Standard
Cabinet approves Dhubri - Phulbari four lane bridge construction over River Brahmaputra
Capital Market Last Updated at March 1, 2019 13:18 IST


https://www.business-standard.com/artic ... 396_1.html

North east live tv.com
Cabinet approves construction of Dhubri – Phulbari four lane bridge over river Brahmaputra

https://northeastlivetv.com/2019/03/01/ ... ahmaputra/

Centre Approves 4-Lane Bridge over Brahmaputra
G PLUS NEWS | MARCH 01, 2019 13:55 HRS

GUWAHATI: The Cabinet Committee on Economic Affairs (CCEA) approved a four-lane bridge over river Brahmaputra between Dhubri (on the North Bank) and Phulbari (on South Bank) on February 28.

The total length of the bridge will be 19.282 km, Finance Minister Arun Jaitley told reporters after by the CCEA meeting.

The proposed four-lane bridge will connect the old town of Dhubri in Assam with the village of Phulbari in Meghalaya and shorten a huge amount of travel time.

Currently, those who travel across these states either take the Naranarayan bridge which is a huge inconvenience as it is 60 km upstream or, alternatively, row across the river in small boats which again takes about two and a half hours.

It is to be mentioned that the Dhubri District Administration has already begun the process of land acquisition for construction of roads to accommodate India’s longest river bridge over the Brahmaputra.

Currently, the longest river bridge in India is at 9.15 km, is the Dhola-Sadiya bridge in Assam which became functional in 2017.


https://www.guwahatiplus.com/daily-news ... rahmaputra
UlanBatori
BRF Oldie
Posts: 14045
Joined: 11 Aug 2016 06:14

Re: Indian Roads Thread

Post by UlanBatori »

Day of Mourning in Ulan Bator: 300 yaks die of starvation :oops:

Read the quote in there: they could not helo-drop food due to bad seather, but the Conservationist bowbows are barking about "road construction activity" and blaming that!!!!!!! If they had any roads someone could get up there with a tractor and snowmobiles and supply food, snow or no snow.
Kakkaji
BRF Oldie
Posts: 3866
Joined: 23 Oct 2002 11:31

Re: Indian Roads Thread

Post by Kakkaji »

This is how UPA Government's sins are impacting development:

NHAI tweaks strategy for Rs 3 trillion projects under Bharatmala scheme
High land acquisition costs have forced the National Highways Authority of India (NHAI) to tweak its strategy for project implementation. The NHAI has decided to consider only those projects that require minimal land acquisition as it finalises highway contracts worth about Rs 3 trillion under the Bharatmala scheme.

The reason for shifting priority is land compensation costs, which increased after the new Act — the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (LARR) — came into being in January 2014. Before the Act, the land acquisition cost made up 10 per cent of a project’s cost. This has now risen to 30-40 per cent.
JTull
BRF Oldie
Posts: 3118
Joined: 18 Jul 2001 11:31

Re: Indian Roads Thread

Post by JTull »

Fair compensation is important, but land acquisition should also be easier. Influence of local politicians should be completely nullified.
Rishirishi
BRFite
Posts: 1409
Joined: 12 Mar 2005 02:30

Re: Indian Roads Thread

Post by Rishirishi »

JTull wrote:Fair compensation is important, but land acquisition should also be easier. Influence of local politicians should be completely nullified.
Land is used as a place to park black money. This inflates the value of land and have make poor farmers rich. The downside is that economic activity becomes a problem. All land intensive activity is suffering from the high land costs.
CalvinH
BRFite
Posts: 1098
Joined: 15 Jul 2007 04:14

Re: Indian Roads Thread

Post by CalvinH »

Kakkaji wrote:This is how UPA Government's sins are impacting development:

NHAI tweaks strategy for Rs 3 trillion projects under Bharatmala scheme
High land acquisition costs have forced the National Highways Authority of India (NHAI) to tweak its strategy for project implementation. The NHAI has decided to consider only those projects that require minimal land acquisition as it finalises highway contracts worth about Rs 3 trillion under the Bharatmala scheme.

The reason for shifting priority is land compensation costs, which increased after the new Act — the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (LARR) — came into being in January 2014. Before the Act, the land acquisition cost made up 10 per cent of a project’s cost. This has now risen to 30-40 per cent.
One of the way to avoid high land costs is to seek a completely different alignment for the expressways with branches connecting it to the older highways. This will also speed up development in areas that were not along the older highways.

Expressways such as Delhi Mumbai should stay outside the main cities on the way with the city government paying for the connectivity between the city and the highway.
Mollick.R
BRFite
Posts: 1033
Joined: 15 Aug 2016 10:26

Re: Indian Roads Thread

Post by Mollick.R »

Good article about actual on ground effects of Good Quality Highways + GST + FASTAG.............
We are witnessing phase-2 of silent logistic revolution (counting GQ by AVB as phase-1).

GST on the Highway
N Madhavan | Updated on June 04, 2019 Published on June 03, 2019


Hopping on to a truck carrying consumer durables from Sriperumbudur to Bhiwandi, N Madhavan discovers how GST, despite hiccups, has transformed goods movement on India’s southern highways
The wait was frustrating. The truck, which had entered the factory of a consumer durables company near Sriperumbudur to load the wares, emerged after almost 20 hours. It was 7.40 pm on May 1, Wednesday, when this writer boarded the truck. Its destination: Bhiwandi in Maharashtra.

Our idea was to experience, first-hand, the changes in road transportation of goods after the implementation of the Goods and Services Tax (GST) and the billions invested in overhauling the country’s road infrastructure. In the process, has the lot of the drivers — who are critical in ensuring that the wheels of the economy keep moving — changed for the better over the years? The 1,288-km ride, we hoped, could reveal a lot about the transformation in road transportation that policymakers keep parroting about, or the lack of it.

“Documentation took a long time,” said Ram* in a matter-of-fact manner. This lean-built 23-year-old from Maharashtra’s Beed district looked the least like typical truck drivers. “Such delays are common. Companies do not really care about grounding a truck for hours together,” he added in Hindi that had strains of Marathi.

All doubts about his inexperience and driving capabilities vanished as he manoeuvred the truck, an Ashok Leyland Tusker Super 2514 H, with absolute ease. For a nine-year-old vehicle, the truck’s pick-up was unusually good and Ram immediately explained that it was more due to the lower payload weight. The 174 air-conditioners and 63 refrigerators it carried weighed less than five tonnes as against its capacity of 14 tonnes.

As the truck eased past the silk town of Kanchipuram, one could not help but notice the sparseness of the truck’s cabin. Two seats and a long bench behind the seats with a Rexine cushion is all it had. With little or no insulation from the engine, the cabin was fast heating up.

Nag, Ram’s brother-in-law who also doubles up as a support staff, pointed to an opening between the two windscreens. “That is our air-conditioning,” he said. The air that blew into the cabin when the truck was in motion ensured that the heat was not felt. It was a different story when the truck stopped.

About an hour into the drive Ram took a right turn at Ranipet, an industrial town. “We prefer the Chittoor route as there are fewer toll plazas than the Krishnagiri route,” he explained. The difference will be as much as ₹800, he said — a reasonable saving, considering that total toll charges for the entire trip were to the tune of ₹6,500.

Checks and balances
The first checkpost to come up was that of Tamil Nadu (TN) before the truck entered Andhra Pradesh (AP). There were no officials in the middle of the road halting the vehicles. From the side a torch was shone and a whistle blown as the truck passed. Ram acted as if he did not hear it and the truck went through. He kept looking at the rear-view mirror for a while, though.

“Post GST, officials try to stop vehicles more discreetly. They show the torch and/or blow the whistle. If you stop they will take ₹500 even if your documentation is perfect,” he explained. By not stopping he took a risk, he said. “If they chase the truck and stop us, I will be forced to pay a bribe of ₹2,000 and the truck will be halted for many hours,” he added. That explained his intense focus on the rear-view mirror as we passed the checkpost.

Ram explained that prior to GST there were two checkposts on each State border. One was that of sales tax and the other, the Regional Transport Office (RTO). The sales tax checkposts have disappeared but the RTO ones remain. “It is the RTO officials who are notorious. Sales tax officials would let us go if the invoices and other documentation are correct but RTO officials will find some reason to extract a bribe, like, driver not in uniform, the truck has an air horn or does not have a first-aid box, and so on,” he explained.

Within minutes of crossing the TN checkpost, another barrier emerged, this time it was AP’s checkpost. Again a whistle was blown but Ram yelled ‘empty load’ and kept driving. AP RTO officials, busy with other trucks they had stopped, let the truck go. “The story is the same here too. If you stop you will end up paying ₹300 or so as a bribe,” he said.

It was almost midnight when the truck crossed Chittoor and headed towards Kolar. The journey was bumpy and slow as four-laning of the highway was in progress. It was 1.20 am when the truck crossed the AP border (Ram yet again deftly dodged AP RTO officials) and entered Karnataka.

The scene at the Karnataka checkpost was different. There were no officials in sight. Ram parked the truck and headed into the RTO office some distance away, surprisingly without any documents. “In Karnataka it is very simple. Just pay ₹200 per truck while entering and exiting, they let you through. Unless they are suspicious, they do not ask for documents or inspect the vehicle,” he explained. In all, it took just about 10 minutes.

Night awaits
As the truck headed towards Bengaluru, Ram announced that he was going to drive through the night. “I rested well while waiting for the documentation to be ready at the factory,” he said. He had set his eyes on the incentive of ₹1,700 he will get if he reaches the goods to Bhiwandi within 48 hours.

There was another motivation too. This was his last trip this season. He and Nag were heading home to their village Therla. “It is five months since we came from the village. Ram is missing his daughter who will be a year-old soon,” Nag said. The plan was to reach Bhiwandi by Friday (May 3), offload the goods and reach their village, which is 35 km from Beed town, by Saturday.

It was almost 4 am when the truck entered Bengaluru. The Nelamangala Toll plaza that soon came up was packed with trucks. Still it took just about 10 minutes, by far the longest in the trip, to pass through, thanks to FASTag. In fact, most of the toll plazas were a breeze taking less than a minute or two. This flies against the constant complaints by truck operators about the time lost in toll plazas. “They should try using FASTag,” quipped Ram.

As the sun ushered in Thursday, the truck had left Bengaluru and Tumakuru behind and was heading towards Chitradurga, a town famous for its fort. The roads got more undulated here. Before long you notice Ram shifting the gear to neutral when the road dips, allowing gravity to power his vehicle. “I do that to save fuel. It is through these savings that I earn my income,” he explained. An all-new remuneration model was revealed.

Ram, being a part-time driver (he tends to his family’s fields during the monsoon period between May and October), is not paid a salary. His income comes from savings in fuel, incentives and whatever he saves from the ₹3,000 his employer pays for food and bribes. “I am given 400 litres for each way. How much of diesel I save at the end of the return trip is paid to me in cash,” he said. This time he had managed to save 50 litres (both ways). That got him ₹3,500. “I end up making, in all, ₹12,000 comfortably for every return trip,” he added. But his ability to realise more income is hampered by the fact that he gets to make just two or three round trips in a month. A clear case of demand-supply mis-match (too many trucks chasing too few a load).

As the truck drove past Davangere, Hubballi (formerly Hubli) and Dharwad, Ram showed no sign of tiredness. He has been on the road continuously for over 20 hours but for brief stops for tea and food. The terrain got tough as Belagavi (formerly Belgaum) approached. Trucks were inching their way ahead on the steep ghat road. Ram finally announced, to everyone’s relief, that he will halt for the night after Kolhapur.

Crossing into Maharashtra was a breeze but the roads were crowded as locals used the highway to commute. It was 9 pm on Thursday (May 2) when Ram halted at Karmani, after a 26-hour ride, for a night’s rest.

A long journey
Most drivers end up sleeping under their truck. “No one cares to offer us decent facilities,” rued Ram. That is a valid statement. Companies invest hundreds of crores to build manufacturing facilities but they do not create decent facilities for truck drivers to rest and freshen up inside the factory. After all, they entrust the drivers with goods worth many crores. Salaries are low, cabin conditions are bad and most importantly, there is no value for their time. They need to push themselves very hard to make money.

“The irony is that the demand-supply equation does not work here,” said Ram adding “when there is a shortage of drivers, the condition of the existing lot should ideally improve but that is not the case.”

It is an early start next day (May 3). Within hours, Satara and Pune are behind as the truck heads towards Mumbai on the Mumbai-Pune Expressway. Near Navi Mumbai, Ram takes a right turn to enter the Mumbra bypass. “We used to spend a lot of time at the checkpost outside Mumbai due to Octroi. Not any more,” he said. A traffic snarl and a stop by police (the truck had a Karnataka registration) later, the truck reaches Bhiwandi by 2.15 pm.

It took Ram just 42.35 hours to cover 1,288 km. In the days before GST and before India’s highways were the four-lane beauties they are today, it would have taken about four days to cover the distance.Though some issues remain, the flow of goods along Indian highways has definitely become smoother and faster.

*Name changed to protect identity of the person

Published on June 03, 2019

https://www.thehindubusinessline.com/sp ... 428804.ece
nandakumar
BRFite
Posts: 1638
Joined: 10 May 2010 13:37

Re: Indian Roads Thread

Post by nandakumar »

https://www.thehindubusinessline.com/sp ... 428804.ece
A very nice write up on the post GST environment for road transport.
Mollick.R
BRFite
Posts: 1033
Joined: 15 Aug 2016 10:26

Re: Indian Roads Thread

Post by Mollick.R »

nandakumar wrote:https://www.thehindubusinessline.com/sp ... 428804.ece
A very nice write up on the post GST environment for road transport.
just posted same :!:
nandakumar
BRFite
Posts: 1638
Joined: 10 May 2010 13:37

Re: Indian Roads Thread

Post by nandakumar »

Mollick.R wrote:
nandakumar wrote:https://www.thehindubusinessline.com/sp ... 428804.ece
A very nice write up on the post GST environment for road transport.
just posted same :!:
I meant to endorse your posted link! But ended up posting it afresh.
Supratik
BRF Oldie
Posts: 6470
Joined: 09 Nov 2005 10:21
Location: USA

Re: Indian Roads Thread

Post by Supratik »

Why are RTO checkposts there except to collect bribes? What can be done to get rid of them?
nandakumar
BRFite
Posts: 1638
Joined: 10 May 2010 13:37

Re: Indian Roads Thread

Post by nandakumar »

Supratik wrote:Why are RTO checkposts there except to collect bribes? What can be done to get rid of them?
Well, the ministers in question have collected their upfront payments for the posting . Now the entrepreneur (the RTO in question) who has invested his risk capital needs to recover his risk capital. Else there will be what the economists would describe as "market failure"!
Supratik
BRF Oldie
Posts: 6470
Joined: 09 Nov 2005 10:21
Location: USA

Re: Indian Roads Thread

Post by Supratik »

No I meant what can be done to remove RTO checkposts. A source of corruption. Haven't seen them in the west. IMO not necessary. If it is a state issue why are BJP govts not removing it?
Suraj
Forum Moderator
Posts: 15043
Joined: 20 Jan 2002 12:31

Re: Indian Roads Thread

Post by Suraj »

The UP expressway building surge is not getting enough attention in this thread. I wonder if some, especially a local with a better feel of the transportation linkages of the state, can please track this in more detail:
Yogi plans expressway to every region of UP by 2022
The Uttar Pradesh government is focusing on completing several expressways before the next assembly elections in 2022. In 2017, the election pitch of the then chief minister Akhilesh Yadav centred around Agra-Lucknow Taj expressway.

Similarly, in 2007 the then chief minister Mayawati’s achievement was Yamuna Expressway. The Yogi Aditya Nath government is working on four large projects which could be the highlight of his government before elections in 2022. First project on the priority list is the Purvanchal Expressway, a 341 km long expressway from Lucknow to Ghazipur, passing through Amethi, Ambedkar Nagar, Sultanpur, Faizabad, Azamgarh and Mau.

“We are targeting to open the main carriageway for public by August 2020,” says Awanish Awasthi. There would be 89-km link way on the expressway to connect it to Gorakhpur for which E-bids would be announced soon. Another project on the line is Bundelkhand expressway which would connect the backward districts of Bundelkhand such as Banda, Hamirpur, Jalaun to Agra Lucknow expressway in Etawah.

Around 79 per cent land acquisition has been completed for this 296 Km expressway and e-bids are going to take place in the current month. Currently the target is to complete the project by 2021. On January 29 this year, Nath announced Ganga Expressway from Meerut in West UP to Prayagraj.

The 600 KM expressway will connect districts such as Meerut, Jyotiba Phule Nagar, Sambhal, Badaun, Farrukhabad, Hardoi, Unnao, Rae Bareli, Pratapgarh to Prayagraj. The survey for the project is slated to being in coming months.
Supratik
BRF Oldie
Posts: 6470
Joined: 09 Nov 2005 10:21
Location: USA

Re: Indian Roads Thread

Post by Supratik »

UP cities and towns except the region adjoining Delhi are a terrible mess. Expressways are good but Yogi needs to replicate what he has done in Prayagraj in other cities and towns.
Suraj
Forum Moderator
Posts: 15043
Joined: 20 Jan 2002 12:31

Re: Indian Roads Thread

Post by Suraj »

Supratik wrote:UP cities and towns except the region adjoining Delhi are a terrible mess. Expressways are good but Yogi needs to replicate what he has done in Prayagraj in other cities and towns.
Pray tell us what he's done in Prayagraj then :)
Supratik
BRF Oldie
Posts: 6470
Joined: 09 Nov 2005 10:21
Location: USA

Re: Indian Roads Thread

Post by Supratik »

I will post videos.
Singha
BRF Oldie
Posts: 66601
Joined: 13 Aug 2004 19:42
Location: the grasshopper lies heavy

Re: Indian Roads Thread

Post by Singha »

meantime in the land of the free ie blr,kerala, the state govt wanted to upgrade the heavily loaded mysore-blr SH from its current 4 lane, no bypasses at major towns state to a 6 lane road, with better shoulders and bypasses at some towns like ramanagaram, chennapatna, maddur, mandya though srirangapatna was not on radar to "save" on the cost of a new kaveri bridge.

anyway farmers are up in arms over land acquisition and a major road blocade the SH was being planned for today. the chaos can only be imagined as lakhs of vehicles go on that road daily and into coorg (madikeri) and towards TN (ooty conoor) also.
Singha
BRF Oldie
Posts: 66601
Joined: 13 Aug 2004 19:42
Location: the grasshopper lies heavy

Re: Indian Roads Thread

Post by Singha »

https://timesofindia.indiatimes.com/cit ... 718465.cms

protest seems not just against the new road but a wider one about land acquisition amendments.
hnair
Forum Moderator
Posts: 4635
Joined: 03 May 2006 01:31
Location: Trivandrum

Re: Indian Roads Thread

Post by hnair »

LA issues are going to to the biggest issues for transport projects. In Kerala, I heard LA is fast approaching 70% project costs

Haven't traveled in Blr-Mys recently, but I remember they used to plonk these mini-mountains called speed-breakers on unsuspecting places. Over ne of these, I was once flying through air while riding pillion and as I achieved the zero-g Vomit_comet conditions, distinctly remember looking DOWN at the top of a bus that just landed in front of us. Fortunately not much injury, although my helmet visor cracked and few scratches.....

Really dont understand why the real-estate guys are not keen on opening up the vast spaces towards Mysore via a huge greenfield expressway?
Aditya_V
BRF Oldie
Posts: 14332
Joined: 05 Apr 2006 16:25

Re: Indian Roads Thread

Post by Aditya_V »

Singha wrote:https://timesofindia.indiatimes.com/cit ... 718465.cms

protest seems not just against the new road but a wider one about land acquisition amendments.
Wasnt some of this land returned by HD Kumaraswamy saying it was excess of what was needed in his earlier Government
Singha
BRF Oldie
Posts: 66601
Joined: 13 Aug 2004 19:42
Location: the grasshopper lies heavy

Re: Indian Roads Thread

Post by Singha »

>> Really dont understand why the real-estate guys are not keen on opening up the vast spaces towards Mysore via a huge greenfield expressway?

mandya sugarcane farmers and gowdru clan took care of that. the NICE expway to mysore abruptly ends 2km from the ring road due to that issue.
it has no use and is not much maintained. annually some spirit of wipro , blr nebs challenge type 10k runs take that in that dead end loop so myself and members of the shadow quad like prasad, negi, picklu get a good look at it.

see the dead end here https://www.google.com/maps/@12.892126, ... 486,12.82z

blr-mysore and then mysore-ooty-conoor, mysore-bandipur-wayanad-kozhikode, mysore-nagarhole, mysore-madikeri , mysore-sravanabelagola-belur-halebid-chikmagalur collectively given domestic, foreign and local weekender traffic this is one of the top5 busiest tourist corridors in the land.
while delhi-agra and delhi-jaipur have soothing highways, we have nothing as usual.
well ok we have shatabdi express but not really is much used in mysore-blr stretch as it cannot use its full speed.
A Nandy
BR Mainsite Crew
Posts: 502
Joined: 06 Sep 2009 23:39

Re: Indian Roads Thread

Post by A Nandy »

https://indianexpress.com/article/expla ... l-6135920/

Rohtang Tunnel will soon be ready for emergency services, official opening in Sept.


A 3,000-member team of contractual workers and 650 regular employees of the Border Roads Organisation (BRO) have been working in shifts through 24 hours on the project. It would have been completed at least four years earlier, but for a massive torrent of water encountered inside the tunnel. The Seri Nullah, which flows on top of the tunnel, almost threatened to derail the project and it took several years to devise ways to tackle the massive flow of water that often went up to 140 litres per second.
The project also has significant strategic implications for the military as it will allow access beyond Rohtang Pass even in peak winters. All-winter connectivity to Ladakh, however, is still some time away as more tunnels will have to be built to tackle the high passes which fall beyond Rohtang.

While Rohtang Pass is at a height of 13,050 feet, the pass on the road to Leh is Baralacha La at 16,040 feet. A 13.2-km long tunnel would be required to bypass this pass and a Detailed Project Report for the same is ready to be presented to the government.

Further down the highway comes Lachung La Pass at 16,800 feet requiring a 14.78 km long tunnel to provide all-weather connectivity. Thereafter falls the Tanglang La pass at 17,480 feet, which will need a 7.32-km long tunnel.


An alternate road link to Ladakh has also been developed by BRO on the Darcha-Padam-Nimu axis, but here again a 4.15-km long tunnel at Sinka La Pass (16,703 feet) would be required for all-weather access. The National Highways and Infrastructure Development Corporation Limited (NHIDCL) is making a DPR for this tunnel which will give a new road link to Leh.
A Nandy
BR Mainsite Crew
Posts: 502
Joined: 06 Sep 2009 23:39

Re: Indian Roads Thread

Post by A Nandy »

And forward we go, drawing ever closer to Leh, making the Chinese shibber :D

https://www.tribuneindia.com/news/archi ... cha-671762
As the ambitious tunnel under the Rohtang Pass nears completion, the Border Roads Organisation (BRO) has initiated the process of constructing a tunnel under the 16,000-foot-high Baralacha Pass, 190 kms ahead of Manali, on the highway to Leh.

This would be the second of the four proposed tunnels envisioned to provide an all-weather access to Ladakh through this 475-km route that remains closed for six months a year due to snow. The other two tunnels are proposed to bypass Lachunglang Pass (16,600 feet) and Taglang Pass (17,480 feet).

“Work on preparing the detailed project report for the tunnel has commenced and it’s expected to be submitted to the Ministry of Defence in December,” Brig NM Chandarana, Chief Engineer, Project Rohtang, said.
8)
manjgu
BRF Oldie
Posts: 2615
Joined: 11 Aug 2006 10:33

Re: Indian Roads Thread

Post by manjgu »

i thought zoji la should have been done first... which i think would have provided year round connectivity to ladhak? the other passes on srinagar Leh route are not as high as on manali/leh route. anyway the opening should help folks beyond rohtang...
A Nandy
BR Mainsite Crew
Posts: 502
Joined: 06 Sep 2009 23:39

Re: Indian Roads Thread

Post by A Nandy »

Google took me to this: https://theprint.in/india/after-6-years ... rd/276148/

Seems there is trouble finding a contractor after IL&FS went bust. It appears to me that among all these tunnels in the Himalayas and under various cities, we should have developed considerable competency and had a public sector company by now to take up these critical works completely.
nandakumar
BRFite
Posts: 1638
Joined: 10 May 2010 13:37

Re: Indian Roads Thread

Post by nandakumar »

A Nandy wrote:Google took me to this: https://theprint.in/india/after-6-years ... rd/276148/

Seems there is trouble finding a contractor after IL&FS went bust. It appears to me that among all these tunnels in the Himalayas and under various cities, we should have developed considerable competency and had a public sector company by now to take up these critical works completely.
IL&FS is only non-banking finance company. They have no technical expertise. Someone else must be doing the actual execution. Afcons and L&T do tunnelling work for Metro rail projects. Not sure if it is comparable.
Vips
BRF Oldie
Posts: 4699
Joined: 14 Apr 2017 18:23

Re: Indian Roads Thread

Post by Vips »

A Nandy wrote:And forward we go, drawing ever closer to Leh, making the Chinese shibber :D

https://www.tribuneindia.com/news/archi ... cha-671762
As the ambitious tunnel under the Rohtang Pass nears completion, the Border Roads Organisation (BRO) has initiated the process of constructing a tunnel under the 16,000-foot-high Baralacha Pass, 190 kms ahead of Manali, on the highway to Leh.

This would be the second of the four proposed tunnels envisioned to provide an all-weather access to Ladakh through this 475-km route that remains closed for six months a year due to snow. The other two tunnels are proposed to bypass Lachunglang Pass (16,600 feet) and Taglang Pass (17,480 feet).

“Work on preparing the detailed project report for the tunnel has commenced and it’s expected to be submitted to the Ministry of Defence in December,” Brig NM Chandarana, Chief Engineer, Project Rohtang, said.
8)
Due to topographical/weather challenges it takes us on an average atleast 10 years to build any long tunnel in the mountains. At this rate it will take another 30-40 years before we have a true round the clock and weather proof access to Ladakh. Why are we just doing one tunnel at a time? We have already declared all these projects as Nationally important so funds should not be an issue. Afcons, HCC and L&T all have the technical experience to do these projects. In additon there are other companies which are executing work on multiple tunnels for the Jiribum-Imphal railway line in the North East.Why cant we initiate work on all passes simultaneously?

At the rate we are going Chinese shibber aint happening for another 3-4 decades.
Vips
BRF Oldie
Posts: 4699
Joined: 14 Apr 2017 18:23

Re: Indian Roads Thread

Post by Vips »

Reality check - Chinese Army Augmenting Its Position; Digging Tunnels, Denying Indian Troops Movement Near Disputed Region Of Ladakh.

China has upped the ante against India's security establishment by massively enhancing its military infrastructure in the bordering areas in Ladakh that have witnessed skirmishes between the forces of the two countries.

China's People's Liberation Army has started carrying out military infrastructure development work near the Pangong lake in Ladakh region, a Defence Ministry source said on Thursday (26 December).

The PLA has set up tents and has constructed underground tunnels and are constructing more tunnels at the disputed Finger 8 mountain spur near Pangong Tso region, a source said.

"It has been further found that Chinese Army has augmented deployment and patrolling the area. They are now denying movement of Indian Army forces in the vicinity of the area," said a source.

Till now, there was no military infrastructure work carried out in the disputed area that the PLA used to come during patrolling in the region. But with setting up of tents, the Chinese army has stationed itself in the region which has become a matter of concern for the Indian security establishment.

There have been regular face-offs between the two armies on the northern bank of the 134-km-long Pangong lake, two-thirds of which is controlled by China as it extends from Tibet to Ladakh.

The incidents of clashes between both forces have been occurring due to deferring perceptions about the Line of Actual Control (LAC) between India and China.

The Indian Army said whenever such incidents happen delegation-level talks led by brigadier-rank officers take place as per the established bilateral mechanism to defuse tensions.

In mid-September this year, Indian and Chinese troops were involved in a heated exchange in eastern part near the Pangong lake after PLA personnel objected to patrolling by Indian soldiers in the area.

The disputed Finger-5 to Finger-8 (mountainous spurs) area on the north bank of Pangong Tso, incidentally, had witnessed a violent clash between Indian and Chinese soldiers, with stones and iron rods being used to injure each other, on 15 August, 2017.
Picklu
BRF Oldie
Posts: 2128
Joined: 25 Feb 2004 12:31

Re: Indian Roads Thread

Post by Picklu »

Guys, shameless plug, please provide your valuable feedback on this.

http://picklubrf.home.blog/2019/12/31/a ... za-fastag/
vishvak
BR Mainsite Crew
Posts: 5836
Joined: 12 Aug 2011 21:19

Re: Indian Roads Thread

Post by vishvak »

whenever such incidents happen
Including when Chinese do it.. especially in sensitive zones.. without already telling anyone.. we got same standards for all of border for all incidents.
ManuJ
BR Mainsite Crew
Posts: 441
Joined: 20 Jan 2004 12:31
Location: USA

Re: Indian Roads Thread

Post by ManuJ »

The BRO is also developing an underwater tunnel across the Brahmaputra. The approval-in-principle has been accorded by the Ministry of Defence and the proposal includes two road tubes and one rail tube.
This is the first time I'm hearing of this.

https://auto.economictimes.indiatimes.c ... 9/73010150