LCA news and discussion

All threads that are locked or marked for deletion will be moved to this forum. The topics will be cleared from this archive on the 1st and 16th of each month.
Post Reply
nash
BRFite
Posts: 946
Joined: 08 Aug 2008 16:48

Re: LCA news and discussion

Post by nash »

This may be discussed earlier...

but anybody know the status of IRST\FLIR for tejas according to vayu(BR site).
It was told that DRDO co-dev. with israel.

thanks in advance... :)
k prasad
BRFite
Posts: 962
Joined: 21 Oct 2007 17:38
Location: Somewhere over the Rainbow
Contact:

Re: LCA news and discussion

Post by k prasad »

nash wrote:This may be discussed earlier...

but anybody know the status of IRST\FLIR for tejas according to vayu(BR site).
It was told that DRDO co-dev. with israel.

thanks in advance... :)
Podded IRST for Tejas Mk2... not looking at an IRST right now (info courtesy Cde Balaji at AI)... no idea about the origin.
SaiK
BRF Oldie
Posts: 36424
Joined: 29 Oct 2003 12:31
Location: NowHere

Re: LCA news and discussion

Post by SaiK »

it was an understanding that the single port side intake beneath the fuselage would be used for FLIR/IRST/recon/... but I guess, it would be only one pod... unless they can club all these features into one pod, the port would be mutually exclusive for these specific featured pods perhaps based on mission requirements (role)?
Omar
BRFite
Posts: 142
Joined: 30 Aug 2005 07:03
Location: cavernous sinus

Re: LCA news and discussion

Post by Omar »

no idea about the origin.
They are from Rafael. Don't have a reference for co-development w/DRDO. I bet Tech Focus or DRDO Newsletters would be a good place to start.

Link: http://www.india-defence.com/reports/3273
SKrishna
BRFite
Posts: 151
Joined: 21 Jan 2008 19:18
Location: Bombay
Contact:

Re: LCA news and discussion

Post by SKrishna »

I know AI09 is long gone and most of the info we already know but found some interesting stuff on this post

X- Posting from acig.org

Post by archerblack
Latest on LCA from AI 2009 - all info from test pilots, developers themselves.

IAF will procure 40 LCA MK1 with GE404 IN20, including 8 LSP, 20 MK1 and 12 trainers
IAF will procure 100 (at least) LCA MK2, with new engines. Competition between EJ 200 and GE414. EJ200 is seen as newer tech.
Kaveri has met original design goals but is behind revised spec for LCA Mk2.
LCA Mk2, empty weight 6.5T, MTOW 13.5T

Current LCA range more than predicted- why? LCA aerodynamics are better than expected and GE engine is extremely fuel efficient. :!:

Even so, more drag reduction etc will be looked at as a more powerful engine is being procured for LCA Mk2.

Current LCA has hybrid radar - Indian hardware, antenna, transmitter etc with ELTA software. Tracking of > 100 km against small targets, proven in testing.

To speed up Mk2 development EADS has been tapped for consultancy. ADA/IAF state that the current flight testing regime can be sped up drastically as an external test agency can audit the flight test points required, and eliminate the unnecessary ones. This replaces the agreement with BAe which was used earlier, but which BAe dropped out of, because they were too busy with the EF program and had manpower constraints.

Boeing was the first choice, but the issues of ITAR etc made them lose the bid.


LCA Mk1 has already transitioned to a completely open architecture system - took 3 years to develop, after IAF asked for it. The current OAC replaces an earlier proprietary federated system which ran on (then) intel 960 type chips. Current OAC replaces dual MC, dual display processors and a display map generator with a single OAC, and another (backup) on hot standby. Uses PowerPC chips - 3 versions (h/w) developed, but s/w more or less remained the same. :!: :!:

LCA Mk1 also has a redesigned wing structure to accomodate heavier missiles, asked for by the IAF in 2003-4.

Stores Management system is of the latest type can handle western, eastern and indian weapons, uses the 1760 standard and discrete pylon interface boxes for maximum flexibility.

In terms of handling and FBW, has won IAF confidence for flight envelope and IAF now feels ADA should directly jump to LCA Mk2 using most of the core technologies of the LCA Mk1, and begin the MCA program as well.

Other features:
- New AESA radar (codevelopment between LRDE India and either ELTA or EADS/SELEX)
- CIP (common integrated processor eg see JSF/F-22 architecture, replacing current Open Avionics Computer)
- All internal RWJ suite - radar warning jammer, with DRFM, digital receiver and able to handle multiple threats (A2A, A2G)
RWJ system also to be fielded on MiG-27 Upg and MiG-29 Upg. Currently being fitted out to the MiG-27 for trials already.

LCA Mk2 to be developed by 2012.

Apart from the above, is the airframe integration etc of the new engine which will also be covered in the same timeframe.

All in all good times for the LCA program, all LCA TP and IAF crew familiar with the program very upbeat about the aircraft and state that ADA has incorporated changes they asked for.
k prasad
BRFite
Posts: 962
Joined: 21 Oct 2007 17:38
Location: Somewhere over the Rainbow
Contact:

Re: LCA news and discussion

Post by k prasad »

^^^ Excellent recap of the overall Tejas picture.... has to be saved... can admins copy this onto the AI09 thread for posterity... this post provides a good starting point to explore, given that a lot of the details have been explored in the thread, esp the radar, Mk2, Avionics, etc...

Thanks

and thanks for posting Krishna
SanjibGhosh
BRFite
Posts: 150
Joined: 30 Jan 2009 18:49

Re: LCA news and discussion

Post by SanjibGhosh »

Vivek K
BRF Oldie
Posts: 2931
Joined: 15 Mar 2002 12:31

Re: LCA news and discussion

Post by Vivek K »

If Kaveri has met its original design goals then why do they not fly say 5-10 LCAs with it?
NRao
BRF Oldie
Posts: 19236
Joined: 01 Jan 1970 05:30
Location: Illini Nation

Re: LCA news and discussion

Post by NRao »

Vivek K wrote:If Kaveri has met its original design goals then why do they not fly say 5-10 LCAs with it?
(Has it?)

The key could be "original design goals". Perhaps the goals have moved on and it is not worth flying a LCA with the original goals?
Vivek K
BRF Oldie
Posts: 2931
Joined: 15 Mar 2002 12:31

Re: LCA news and discussion

Post by Vivek K »

Well, for Indian aerospace industry and for self-reliance in the future, Kaveri is the critical path and the biggest hurdle. If it has met the "original design goals" it should be flown a lot to gain more expertise from the project. Maybe in a Mig-29 as one of the engines if not in a LCA.
SaiK
BRF Oldie
Posts: 36424
Joined: 29 Oct 2003 12:31
Location: NowHere

Re: LCA news and discussion

Post by SaiK »

Any more links on the CIP for Mk2? they have only 3 more years left to get this on the delivery? Raptor courts 66 power pc modules for its CIP, equallying two cray super computing power.
Cybaru
BRF Oldie
Posts: 2932
Joined: 12 Jun 2000 11:31
Contact:

Re: LCA news and discussion

Post by Cybaru »

SKrishna wrote:I know AI09 is long gone and most of the info we already know but found some interesting stuff on this post

X- Posting from acig.org

Post by archerblack
Latest on LCA from AI 2009 - all info from test pilots, developers themselves.

IAF will procure 40 LCA MK1 with GE404 IN20, including 8 LSP, 20 MK1 and 12 trainers
IAF will procure 100 (at least) LCA MK2, with new engines. Competition between EJ 200 and GE414. EJ200 is seen as newer tech.
Kaveri has met original design goals but is behind revised spec for LCA Mk2.
LCA Mk2, empty weight 6.5T, MTOW 13.5T

Current LCA range more than predicted- why? LCA aerodynamics are better than expected and GE engine is extremely fuel efficient. :!:

Even so, more drag reduction etc will be looked at as a more powerful engine is being procured for LCA Mk2.

Current LCA has hybrid radar - Indian hardware, antenna, transmitter etc with ELTA software. Tracking of > 100 km against small targets, proven in testing.

To speed up Mk2 development EADS has been tapped for consultancy. ADA/IAF state that the current flight testing regime can be sped up drastically as an external test agency can audit the flight test points required, and eliminate the unnecessary ones. This replaces the agreement with BAe which was used earlier, but which BAe dropped out of, because they were too busy with the EF program and had manpower constraints.

Boeing was the first choice, but the issues of ITAR etc made them lose the bid.


LCA Mk1 has already transitioned to a completely open architecture system - took 3 years to develop, after IAF asked for it. The current OAC replaces an earlier proprietary federated system which ran on (then) intel 960 type chips. Current OAC replaces dual MC, dual display processors and a display map generator with a single OAC, and another (backup) on hot standby. Uses PowerPC chips - 3 versions (h/w) developed, but s/w more or less remained the same. :!: :!:

LCA Mk1 also has a redesigned wing structure to accomodate heavier missiles, asked for by the IAF in 2003-4.

Stores Management system is of the latest type can handle western, eastern and indian weapons, uses the 1760 standard and discrete pylon interface boxes for maximum flexibility.

In terms of handling and FBW, has won IAF confidence for flight envelope and IAF now feels ADA should directly jump to LCA Mk2 using most of the core technologies of the LCA Mk1, and begin the MCA program as well.

Other features:
- New AESA radar (codevelopment between LRDE India and either ELTA or EADS/SELEX)
- CIP (common integrated processor eg see JSF/F-22 architecture, replacing current Open Avionics Computer)
- All internal RWJ suite - radar warning jammer, with DRFM, digital receiver and able to handle multiple threats (A2A, A2G)
RWJ system also to be fielded on MiG-27 Upg and MiG-29 Upg. Currently being fitted out to the MiG-27 for trials already.

LCA Mk2 to be developed by 2012.

Apart from the above, is the airframe integration etc of the new engine which will also be covered in the same timeframe.

All in all good times for the LCA program, all LCA TP and IAF crew familiar with the program very upbeat about the aircraft and state that ADA has incorporated changes they asked for.
I have the ad somewhere for the board used. Its a dual powerpc 450 chip on a single board. Two of those are used. They purchased those back in 2004/2005 time frame.

Radstone uk was the original supplier. It got bought out by GE fanuc later.
Omar
BRFite
Posts: 142
Joined: 30 Aug 2005 07:03
Location: cavernous sinus

Re: LCA news and discussion

Post by Omar »

Vivek K wrote:
If Kaveri has met its original design goals then why do they not fly say 5-10 LCAs with it?


(Has it?)

The key could be "original design goals". Perhaps the goals have moved on and it is not worth flying a LCA with the original goals?
Short answer, yes.

I went to the archives and pulled up this link to k prasad's AI 2009 post about the Kaveri engine-probably one of the most high impact posts on BR this year :).

Here's a quote:
He pointed out that the change in IAF requirements and the increase in all up wt by 2 tons killed the Kaveri as they knew it, simply because it could not in any way be able to achieve the new requirements... he was quite angry that they had been blamed for what was obviously not their fault, ie, a low-performing Kaveri for the updated reqs. Bypass Ratio is 0.16 to 0.18... he pointed out that if it had to meet the new stds, the bypass would have to be at least 0.35 to 0.45.
Last edited by Omar on 23 Jun 2009 04:02, edited 1 time in total.
pgbhat
BRF Oldie
Posts: 4163
Joined: 16 Dec 2008 21:47
Location: Hayden's Ferry

Re: LCA news and discussion

Post by pgbhat »

Omar wrote: I went to the archives and pulled up this link to k prasad's AI 2009 post about the Kaveri engine-probably one of the most high impact posts on BR this year :) .
That was a classic 8)
NRao
BRF Oldie
Posts: 19236
Joined: 01 Jan 1970 05:30
Location: Illini Nation

Re: LCA news and discussion

Post by NRao »

Well Omarji, well played. But the long answer stands too. :)

The point being that the original specs, although met, are of no use to a combat LCA.
Vivek K
BRF Oldie
Posts: 2931
Joined: 15 Mar 2002 12:31

Re: LCA news and discussion

Post by Vivek K »

But my point remains - there is a secondary goal in the Kaveri program - to get experience with aircraft engines. The Kaveri in current form should still be used to power some a/c to gain experience.
Omar
BRFite
Posts: 142
Joined: 30 Aug 2005 07:03
Location: cavernous sinus

Re: LCA news and discussion

Post by Omar »

But my point remains - there is a secondary goal in the Kaveri program - to get experience with aircraft engines. The Kaveri in current form should still be used to power some a/c to gain experience.
And it will. According to k prasad's post, if complete engine trials at CIAM were successful, then the LCA will integrated with Kaveri around October this year. The long term question is whether India will invest money to develop facilities for engine testing that exist at CIAM and AneCom.
naird
BRFite
Posts: 284
Joined: 04 Jun 2009 19:41

Re: LCA news and discussion

Post by naird »

JaiS
Forum Moderator
Posts: 2190
Joined: 01 Mar 2003 12:31
Location: JPEG-jingostan
Contact:

Re: LCA news and discussion

Post by JaiS »

naird wrote:
239 test flights.
:shock:

The real number is 1139, did you apply any special branch of Mathematics to derive the 239 number ? ( 1139 == 1+1,39 == 239 ?)
naird
BRFite
Posts: 284
Joined: 04 Jun 2009 19:41

Re: LCA news and discussion

Post by naird »

JaiS wrote:
naird wrote:
239 test flights.
:shock:

The real number is 1139, did you apply any special branch of Mathematics to derive the 239 number ? ( 1139 == 1+1,39 == 239 ?)
:D :D :D I seriously dont know where 239 came from ....correction its 1139 ....In betn the logic of 239 was excellent ...!!!!
yossarian
BRFite -Trainee
Posts: 35
Joined: 07 Jun 2009 06:52

Re: LCA news and discussion

Post by yossarian »

Just did some searching and couldn't quite find any videos or snapshots of the LCA in acrobatic displays(apart from the sole inverted flight video) demonstrating agility, while JF17 seems to have attempted and shown off quite a few moves.

Wouldn't ADA release such displays (and after 1000+ test flights, aren't such displays expected? )

Whats the word on Tejas's agility in comparison to other aircraft around the world?
Srivastav
BRFite
Posts: 142
Joined: 24 Jan 2009 17:23
Location: where the polar bears live

Re: LCA news and discussion

Post by Srivastav »

how about you read skrishna's post on the top of this page ......and if you really wanna learn read the aero india thread where kprasad, rakall etc have done awesome work.
shiv
BRF Oldie
Posts: 34982
Joined: 01 Jan 1970 05:30
Location: Pindliyon ka Gooda

Re: LCA news and discussion

Post by shiv »

yossarian wrote:Just did some searching and couldn't quite find any videos or snapshots of the LCA in acrobatic displays(apart from the sole inverted flight video)
Have you seen these:


K Mehta
BRFite
Posts: 973
Joined: 13 Aug 2005 02:41
Location: Bangalore

Re: LCA news and discussion

Post by K Mehta »

LCA weapons testing images from Journal of aeronautical sciences of India
Image courtesy ADA
Image
Image
Last edited by K Mehta on 25 Jun 2009 13:37, edited 1 time in total.
KrishG
BR Mainsite Crew
Posts: 1290
Joined: 25 Nov 2008 20:43
Location: Land of Trala-la

Re: LCA news and discussion

Post by KrishG »

Thank you so much Mehtaji. :D :D
K Mehta
BRFite
Posts: 973
Joined: 13 Aug 2005 02:41
Location: Bangalore

Re: LCA news and discussion

Post by K Mehta »

Note the use of multiple pylons in the first image.
BTW, the Feb 2009 issue of the same journal has the ENTIRE Aero India 09 Symposium presentations WITH DIAGRAMS, PHOTOS AND TABLES.
And one interesting tidbit there was that there was some interest shown in a Thrust vectored EJ200 for LCA.
If eurojet is putting in TVC, it would win hands down, apparently there has been a tech demonstrator project for EJ200 TVC.
krishg, you are welcome.
krishnan
BRF Oldie
Posts: 7342
Joined: 07 Oct 2005 12:58
Location: 13° 04' N , 80° 17' E

Re: LCA news and discussion

Post by krishnan »

Can anyone figure out the serial number?
PratikDas
BRFite
Posts: 1927
Joined: 06 Feb 2009 07:46
Contact:

Re: LCA news and discussion

Post by PratikDas »

K Mehta wrote:LCA weapons testing images from Journal of aeronautical sciences of India
...
Image
That is a beautiful photo. Tussi great ho, Mehtaji.
K Mehta
BRFite
Posts: 973
Joined: 13 Aug 2005 02:41
Location: Bangalore

Re: LCA news and discussion

Post by K Mehta »

krishnan wrote:Can anyone figure out the serial number?
I think its PV3
shiv
BRF Oldie
Posts: 34982
Joined: 01 Jan 1970 05:30
Location: Pindliyon ka Gooda

Re: LCA news and discussion

Post by shiv »

K Mehta wrote:LCA weapons testing images from Journal of aeronautical sciences of India
Image courtesy ADA
Image
Image
Thanks!

Note Litening pod
naird
BRFite
Posts: 284
Joined: 04 Jun 2009 19:41

Re: LCA news and discussion

Post by naird »

http://www.ada.gov.in/others/CurrentNew ... -lca_.html

LCA completes 1141 test flights.

Can someone tell me the number of test flight hours that needs to be logged in before getting a FOC or IOC ? LCA must have completed apprx 600 hours of testing considering average sortie hours to be 30 mins.
yossarian
BRFite -Trainee
Posts: 35
Joined: 07 Jun 2009 06:52

Re: LCA news and discussion

Post by yossarian »

shiv wrote:
yossarian wrote:Just did some searching and couldn't quite find any videos or snapshots of the LCA in acrobatic displays(apart from the sole inverted flight video)
Have you seen these:

Thanks.....:)
Nirmal
BRFite -Trainee
Posts: 81
Joined: 05 Jul 2005 15:51
Location: London, United Kingdom
Contact:

Re: LCA news and discussion

Post by Nirmal »

naird wrote:http://www.ada.gov.in/others/CurrentNew ... -lca_.html

LCA completes 1141 test flights.

Can someone tell me the number of test flight hours that needs to be logged in before getting a FOC or IOC ? LCA must have completed apprx 600 hours of testing considering average sortie hours to be 30 mins.
2000 hours is the norm applicable for FOC however other parameters of the test-envelope being met are even of more importance.
KrishG
BR Mainsite Crew
Posts: 1290
Joined: 25 Nov 2008 20:43
Location: Land of Trala-la

Re: LCA news and discussion

Post by KrishG »

Thanks!

Note Litening pod
ADA is still using LITENING pod for ground-target acquisition. Willn't any of the prototypes be fitted with a radar ??
Kartik
BRF Oldie
Posts: 5725
Joined: 04 Feb 2004 12:31

Re: LCA news and discussion

Post by Kartik »

K Mehta wrote:Note the use of multiple pylons in the first image.
BTW, the Feb 2009 issue of the same journal has the ENTIRE Aero India 09 Symposium presentations WITH DIAGRAMS, PHOTOS AND TABLES.
And one interesting tidbit there was that there was some interest shown in a Thrust vectored EJ200 for LCA.
If eurojet is putting in TVC, it would win hands down, apparently there has been a tech demonstrator project for EJ200 TVC.
krishg, you are welcome.
thanks for the great pics K Mehta ! when you say multiple pylons, what are you referring to ? I can see that there are 2 X 1000 lb bombs on the inboard pylons and 1 R-73 and 1 25kg bomb carrier on the outermost pylons alongwith a Litening LDP..there is no multiple ejection rack on any of the pylons as far as I can tell..

would you be able to scan anything else that would interest jingos here ? would make for a welcome change from the ridiculous MRCA thread..
Nihat
BRFite
Posts: 1330
Joined: 10 Dec 2008 13:35

Re: LCA news and discussion

Post by Nihat »

KrishG wrote:
Thanks!

Note Litening pod
ADA is still using LITENING pod for ground-target acquisition. Willn't any of the prototypes be fitted with a radar ??
LSP 3 would be fitted with MMR
K Mehta
BRFite
Posts: 973
Joined: 13 Aug 2005 02:41
Location: Bangalore

Re: LCA news and discussion

Post by K Mehta »

Kartik wrote: thanks for the great pics K Mehta ! when you say multiple pylons, what are you referring to ? I can see that there are 2 X 1000 lb bombs on the inboard pylons and 1 R-73 and 1 25kg bomb carrier on the outermost pylons alongwith a Litening LDP..there is no multiple ejection rack on any of the pylons as far as I can tell..

would you be able to scan anything else that would interest jingos here ? would make for a welcome change from the ridiculous MRCA thread..
Sorry for the confusion Kartik,
I meant that all 4 wing pylons were being used, I mistakenly used the term multiple pylons. That along with litening pod would mean that A2G weapons testing has reached quite an advanced stage.
In the Feb 2009 issue, there is a Talk (article in the journal) on EJ TVC I think by some Eurojet executive, but I felt apparently the whole talk was about integrating EJ200 with 3D TVC in LCA. The point was further elaborated by a picture of LCA showing control surfaces and a thrust vectoring engine in the same article. This is a very very interesting possibility
Neela
BRF Oldie
Posts: 4104
Joined: 30 Jul 2004 15:05
Location: Spectator in the dossier diplomacy tennis match

Re: LCA news and discussion

Post by Neela »

Question to gurus:

Earlier there was this discussion about the dumb bombs being dropped and how the external parameters, speed etc are used to calculate the release point.
My question is, how is the wind speed measured/calculated? . Wind conditions , I think , need not be the same at all altitudes. How is this factured in?
SivaVijay
BRFite
Posts: 136
Joined: 09 Apr 2009 19:23

Re: LCA news and discussion

Post by SivaVijay »

Isn't LCA supposed to be the workhorse of the IAF?

If so then LCA should be more numerous than any other aircraft inventory IMHO, but IAF plans for LCA puts it around 180 airframes, this is lesser the Mig 21's(The former workhorse).

By Workhorse we are talking about a system that is dependable, requires less maintenance and so shorter turaround, lower op costs and maintenance costs. If so then why does the LCA require TVC engine, it by itself is a RSS design which by itself makes it highly manverable, The TVC only increases maintenance and costs. Or is there other plans for LCA like operating in enemy airspace on SEAD, CAS etc.?

can some gurus tell me what is the role the IAF has in mind for LCA? and if it is indeed the backbone if IAF then why its projected airframe numbers are below even MMRCA(including the 126+ future option)?
K Mehta
BRFite
Posts: 973
Joined: 13 Aug 2005 02:41
Location: Bangalore

Re: LCA news and discussion

Post by K Mehta »

Sivavijay,
Think Naval LCA. TVC=shorter takeoff distance etc. TVC has its advantages and disadvantages.
And why do you think Ground weapons testing is being done now, if it were not going to be used in a ground attack role? Regarding numbers, lets first see LCA complete IOC. With production lines at HAL, IAF can always have an extended production run.
MMRCA is different topic altogether and people are still debating about it. lets wait and watch what happens at the tech evaluations there.

BTW Kartik,
Any news from panwallahs regarding LSP-3 or PV-5? I havent had pan since long time but my panwallahs word on delay beyond march deadline was correct.
Post Reply