LCA: News & Discussions - October 2016
-
- BRF Oldie
- Posts: 4067
- Joined: 29 Mar 2017 06:37
Re: LCA: News & Discussions - October 2016
Apologies for overreaction.
Even if we plan to order 100s of F16s or actually order F16s, we should create a third line. Not only it should help,
1. reduce the AC shortfall and that too quickly
2. Scientific and Economic perspective is always there
3. For F16 on any other plane, we might know the plane from our singapore experience, but actually using it and putting it to use would require development of flying tactics that too would take time. Just like Mig 21 and Su 30 didnt participate in '65 and '99
4. Ahuja sir's analysis and Pilot's experience tells LCA will not be a pushover to F16 (paki threat)
Net net, from a pure military perspective, it makes much more sense to invest in a new line and get it in more and more no.s..
From a technological perspective, even if Kaveri doesnt sees much success, it will still be a reasonable plane where we will have a potential for future growth into MCA (not just AMCA, we are jumping a step) and NLCA.
Perhaps those funds are better utilized for Navy acquisition and future growth of NLCA
Even if we plan to order 100s of F16s or actually order F16s, we should create a third line. Not only it should help,
1. reduce the AC shortfall and that too quickly
2. Scientific and Economic perspective is always there
3. For F16 on any other plane, we might know the plane from our singapore experience, but actually using it and putting it to use would require development of flying tactics that too would take time. Just like Mig 21 and Su 30 didnt participate in '65 and '99
4. Ahuja sir's analysis and Pilot's experience tells LCA will not be a pushover to F16 (paki threat)
Net net, from a pure military perspective, it makes much more sense to invest in a new line and get it in more and more no.s..
From a technological perspective, even if Kaveri doesnt sees much success, it will still be a reasonable plane where we will have a potential for future growth into MCA (not just AMCA, we are jumping a step) and NLCA.
Perhaps those funds are better utilized for Navy acquisition and future growth of NLCA
Re: LCA: News & Discussions - October 2016
No problem.
2 hour wait before outrage submit is good. With Namo its 48 hour wait.
Venkiah Naidu 2 min!
2 hour wait before outrage submit is good. With Namo its 48 hour wait.
Venkiah Naidu 2 min!
Re: LCA: News & Discussions - October 2016
It's not Paki threat.
Folks laughed when I said 65 squadrons if we want to fight and win 2.5 front war.
It's coming.
Folks laughed when I said 65 squadrons if we want to fight and win 2.5 front war.
It's coming.
-
- BRF Oldie
- Posts: 4067
- Joined: 29 Mar 2017 06:37
Re: LCA: News & Discussions - October 2016
Agreed, pakis individually stopped posing a threat after they lost in '65. In '71 it was just a revalidation. It's the joint threat. Also, given the terrain, and most importantly given our fear of China after '62 a repeat will be avoided at all costs, right from top level to the individual soldier level.
Now coming to your point about 65 squadrons, the quesiton i think of are if? how? and then when?
How is the easiest part, coz we have almost all the pieces in place now. Things can not go south from here (even after counting for HAL and production screw ups).
The question is if we have the desire/capability to have 65 sqdns? I am myself incapable of answering this question.
65 Sqdns:
Ignoring time and making some arbit assumptions we can have: 13 Su 30, 4 Raffie, 4 Mig 29, 4 Mirage 2000, 7 jags, ~6 Tejas=38 leaves a gap of 27 sqdns
Lets assume even if get 10 sqdns of F16, and 7 sqdns of FGFA, and 10 sqdns of AMCA.
Results in reasonable mix from operational PoV, but it will also require massive expansion in pilot force and thereby associated training infra as well. Perhaps dilution of entry standards.
The question is will we have enough money and will to operate this big AF which will be in top 4 (assuming US, Russia and China)
Now coming to your point about 65 squadrons, the quesiton i think of are if? how? and then when?
How is the easiest part, coz we have almost all the pieces in place now. Things can not go south from here (even after counting for HAL and production screw ups).
The question is if we have the desire/capability to have 65 sqdns? I am myself incapable of answering this question.
65 Sqdns:
Ignoring time and making some arbit assumptions we can have: 13 Su 30, 4 Raffie, 4 Mig 29, 4 Mirage 2000, 7 jags, ~6 Tejas=38 leaves a gap of 27 sqdns
Lets assume even if get 10 sqdns of F16, and 7 sqdns of FGFA, and 10 sqdns of AMCA.
Results in reasonable mix from operational PoV, but it will also require massive expansion in pilot force and thereby associated training infra as well. Perhaps dilution of entry standards.
The question is will we have enough money and will to operate this big AF which will be in top 4 (assuming US, Russia and China)
-
- BRF Oldie
- Posts: 5128
- Joined: 07 Sep 2009 16:17
Re: LCA: News & Discussions - October 2016
??ramana wrote:It's not Paki threat.
Folks laughed when I said 65 squadrons if we want to fight and win 2.5 front war.
It's coming.
Ramana ji you have upped the number of squadrons by 5, and fronts by .5
What's the other'half' front?
-
- BRF Oldie
- Posts: 5128
- Joined: 07 Sep 2009 16:17
Re: LCA: News & Discussions - October 2016
Today the order of 450 Tejas and 90 Tejas trainers should be placed. I remember German Swiss giant RuAG had offered assistance to hal but were ignored. Maybe Tata-Ruag can set up extra line ...ArjunPandit wrote: 65 Sqdns:
Ignoring time and making some arbit assumptions we can have: 13 Su 30, 4 Raffie, 4 Mig 29, 4 Mirage 2000, 7 jags, ~6 Tejas=38 leaves a gap of 27 sqdns...
Last edited by Manish_Sharma on 01 Jul 2017 16:40, edited 1 time in total.
-
- BRF Oldie
- Posts: 4067
- Joined: 29 Mar 2017 06:37
Re: LCA: News & Discussions - October 2016
01 July..
Flying Daggers has completed the first year of its service to nation. Wishing the Aviators, Engineers and the Airmen many more successful years of Tejas flying ahead..
Flying Daggers has completed the first year of its service to nation. Wishing the Aviators, Engineers and the Airmen many more successful years of Tejas flying ahead..
Re: LCA: News & Discussions - October 2016
Officially, it is a 2-front war for IAF. The other .5 front (for COIN is mostly for IA). But in reality, we need to be ready for a 3-front war - Bangladesh can "turn" anytime (if the wrong begum comes to power) and threaten our flanks and the "chicken neck".ramana wrote:It's not Paki threat.
Folks laughed when I said 65 squadrons if we want to fight and win 2.5 front war.
It's coming.
Re: LCA: News & Discussions - October 2016
Look at point and area targets in TSP and China. Add IA and IN support roles. Now back calculate how many sorties are needed accounting for effectiveness. Add attrition rate. Then add margin for reserves to influence battle outcomes.
Re: LCA: News & Discussions - October 2016
That is a one gorgeous plane.Cybaru wrote:Whaaat a beauty!!
Re: LCA: News & Discussions - October 2016
Or the cost of one Rafale.ramana wrote:That's about 2.5 Guardian drones.srai wrote: I would think that is a true statement.
The "official" second-line (i.e. technically third line) of 8 LCA assembly capacity will cost $203 million.
Second Production Line For India's Home-grown LCA Tejas For $203 Million
Re: LCA: News & Discussions - October 2016
Interesting tit-bit on LCA Mk1A. Existing prototypes will be upgraded to Mk1A standard. That means current SP Mk1 (IOC-2/FOC) standards would be upgradable too.
22 June at 07:20Karapattu R Sanjeev:
Tejas - LCA Sir, Any update on the Tejas Mk1A development
22 June at 08:39 Tejas - LCA:
It's gaining momentum now.
23 June at 00:11 Karapattu R Sanjeev:
Are you building a new Prototype for Tejas Mk1A or modifying any of the existing aircrafts?
23 June at 01:11 Tejas - LCA:
modifyong existing prototype makes more sense.
27 June at 00:45Ravi Gopalan Sir:
we havent seen reports of any engine orders for 404IN20, curious about HAL's plans to ramp up in time for MK1A
27 June at 01:50 Tejas - LCA:
The flight testing will have to happen first. Some of the existing prototypes will be modified to start with.
-
- BRF Oldie
- Posts: 5891
- Joined: 04 Apr 2005 08:17
- Location: Dera Mahab Ali धरा महाबलिस्याः درا مهاب الي
Re: LCA: News & Discussions - October 2016
Building MK1A will need gutting down some of the LSPs and re-building the innards from nose cone till the engine. The entire pilot facing surface will change. The entire 'jungle' under the spine also will change. It is major MAJOR work onlee.
Before that happens, the stuff that need to be mounted there must be ready. Delays do happen.
Before that happens, the stuff that need to be mounted there must be ready. Delays do happen.
Re: LCA: News & Discussions - October 2016
^^^
All depends on how much internal rearrangement has been designed. If they can do minimum that is required for better access to the identified areas/parts for maintenance, then the whole Mk1A may not be all that much extra work. But if they are planning to do as much as what you are implying then I don't think they can complete qualifications by 2020.
All depends on how much internal rearrangement has been designed. If they can do minimum that is required for better access to the identified areas/parts for maintenance, then the whole Mk1A may not be all that much extra work. But if they are planning to do as much as what you are implying then I don't think they can complete qualifications by 2020.
-
- BRF Oldie
- Posts: 5571
- Joined: 26 Jun 2005 10:26
Re: LCA: News & Discussions - October 2016
Sh*t. Saar, last few times ju have wonlee posted such newj. Every now and again, do some appetizing bits too. No wonder they are looking for solah.Dileep wrote:Building MK1A will need gutting down some of the LSPs and re-building the innards from nose cone till the engine. The entire pilot facing surface will change. The entire 'jungle' under the spine also will change. It is major MAJOR work onlee.
Before that happens, the stuff that need to be mounted there must be ready. Delays do happen.
Re: LCA: News & Discussions - October 2016
It's true. And cable harnesses have to remade for the relocated packages.
Making 3 D cable harnesses is a non-trivial task.
Making 3 D cable harnesses is a non-trivial task.
Re: LCA: News & Discussions - October 2016
Arjun MBT redux. By the time Mk1A is ready, Mk1 production would have long ended. They are taking on too many changes in a short amount of time. Again, the work effort is being underestimated as well as the time required for qualifications. Doesn't look good for the future of LCA, IMO.Cain Marko wrote:Sh*t. Saar, last few times ju have wonlee posted such newj. Every now and again, do some appetizing bits too. No wonder they are looking for solah.Dileep wrote:Building MK1A will need gutting down some of the LSPs and re-building the innards from nose cone till the engine. The entire pilot facing surface will change. The entire 'jungle' under the spine also will change. It is major MAJOR work onlee.
Before that happens, the stuff that need to be mounted there must be ready. Delays do happen.
Re: LCA: News & Discussions - October 2016
No. Briefly, prototypes can undergo Frankenstein surgeries which is almost similar to new build aircraft. Reason for modification is to save on administrative approval time & effort for new test planes.srai wrote:Interesting tit-bit on LCA Mk1A. Existing prototypes will be upgraded to Mk1A standard. That means current SP Mk1 (IOC-2/FOC) standards would be upgradable too
Modifying SP-1-20 will require similar rebuild and not worth the effort that can be spent on new aircraft.
Re: LCA: News & Discussions - October 2016
how is the internal cable routing of a a.c done? some "layout" sw similar to that used in 3D routing of wires inside a chip?
Re: LCA: News & Discussions - October 2016
Of coarse there are SW available for preparing the wiring layouts, both commercial and inhouse (e.g. Saffron has one SW call eCentric). They are like CAD SW more or less. There are specialised companies doing this work. It quite a complicated task for bigger aircrafts and fighter jets. Highly man-hr intensive work. A few companies in BLR do such work. There have been known delays in 'years' for some Aircraft projects due to wiring. IIRC A380 was one of those, where a simple error of mismatch in versions of the SW used for creating these layouts set the project back by billions of dollars (at least that what they claim). Mitsubishi MRJ is also delayed due to wiring changes.Singha wrote:how is the internal cable routing of a a.c done? some "layout" sw similar to that used in 3D routing of wires inside a chip?
Re: LCA: News & Discussions - October 2016
Singh Do download some recent aircraft cutaway dwgs and see how those black boxes are connected up. Such wiring is called cable harness. And in aircraft it is 3D and not just 2D.
Re: LCA: News & Discussions - October 2016
For LCA, its not merely about spending money to get the third assembly line started.
Currently all the suppliers of HAL and HAL itself for the components that it makes, have to ramp up production, so that a total of 11 aircrafts can be on the assembly line at any given time. Right now that's not the case.
We are not at that stage as yet. My guess is that we probably might be having 5-8 aircraft on the first assembly line and 1 on the 0.5 assembly line.
Once SP5 rolls of the 0.5 assembly line, they will be confident enough to use all the 3 slots on the 0.5 assembly line and ramp up production.
Also, remember that only 40 MK1 planes to be made. Setting up an additional assembly line for 8 more aircrafts that will only lie idle, doesn't make much sense. The second line of 8 assembly slots will come online, when MK1A is ready. Offcourse the line should be ready before that.
From the existing 1.5 assembly line itself, HAL might be able to produce upto 12 aircrafts per year.
Right now, the main focus should be on the following:
1). ADA achieving FoC for MK1.
2). HAL stabilizing the production, so that from 2018 onwards, they are able to produce 10-12 aircrafts per year.
3). ADA and HAL going after MK1A on war footing and targeting 2020 as the start of full scale production, with 2.5 assembly lines, producing 20 planes per year from 2021 onwards.
Without development of MK1A, we simply cannot ramp up production right now. The additional assembly line at this point in time would make sense, only if IAF and MoD decide to increase the number of MK1 planes to 60 from the current 40.
Currently all the suppliers of HAL and HAL itself for the components that it makes, have to ramp up production, so that a total of 11 aircrafts can be on the assembly line at any given time. Right now that's not the case.
We are not at that stage as yet. My guess is that we probably might be having 5-8 aircraft on the first assembly line and 1 on the 0.5 assembly line.
Once SP5 rolls of the 0.5 assembly line, they will be confident enough to use all the 3 slots on the 0.5 assembly line and ramp up production.
Also, remember that only 40 MK1 planes to be made. Setting up an additional assembly line for 8 more aircrafts that will only lie idle, doesn't make much sense. The second line of 8 assembly slots will come online, when MK1A is ready. Offcourse the line should be ready before that.
From the existing 1.5 assembly line itself, HAL might be able to produce upto 12 aircrafts per year.
Right now, the main focus should be on the following:
1). ADA achieving FoC for MK1.
2). HAL stabilizing the production, so that from 2018 onwards, they are able to produce 10-12 aircrafts per year.
3). ADA and HAL going after MK1A on war footing and targeting 2020 as the start of full scale production, with 2.5 assembly lines, producing 20 planes per year from 2021 onwards.
Without development of MK1A, we simply cannot ramp up production right now. The additional assembly line at this point in time would make sense, only if IAF and MoD decide to increase the number of MK1 planes to 60 from the current 40.
Re: LCA: News & Discussions - October 2016
like these i think..ramana wrote:Singh Do download some recent aircraft cutaway dwgs and see how those black boxes are connected up. Such wiring is called cable harness. And in aircraft it is 3D and not just 2D.
http://www.sasmos.com/Harnesses.html
Re: LCA: News & Discussions - October 2016
Does anyone else find it amazing that after decades of indigenizing hundreds upon hundreds of MiGs and Sukhois, HAL and its supporting suppliers do not have the capacity to make a dozen indigenous fighters per year?mody wrote:For LCA, its not merely about spending money to get the third assembly line started.
Currently all the suppliers of HAL and HAL itself for the components that it makes, have to ramp up production, so that a total of 11 aircrafts can be on the assembly line at any given time. Right now that's not the case.
What use is indigenizing 70% of the MKI or anything else if it did not create intrinsic capacity for our aviation eco-system? The LCA has been flying since 2001 and no one at HAL had planned for production during all this time?
Sorry, the babudom at HAL is dug-in, entrenched and impossible to extract and fix. Give Tata and the private sector a chance. Even if it means letting them partner with Amreekis and introducing the F-solah.
-
- BRF Oldie
- Posts: 4067
- Joined: 29 Mar 2017 06:37
Re: LCA: News & Discussions - October 2016
Can't HAL keep on producing the MK1 planes on its own, I am sure it can bear with the carry cost, with nothing in sight IAF wont mind a plane. I am sure payments can be sorted out over time.
For IAF an inferior plane should be preferable to no plane
For IAF an inferior plane should be preferable to no plane
-
- BRF Oldie
- Posts: 4067
- Joined: 29 Mar 2017 06:37
Re: LCA: News & Discussions - October 2016
Chola, just threaten these babus to withhold their salaries, and see how they will be working like clockwork to get the planes of high quality
Re: LCA: News & Discussions - October 2016
From a risk-mitigation point of view, the assembly line should continue to produce Mk1 until the Mk1A becomes ready and then gradually switch over. That may mean additional one-or-two year production run for Mk1.ArjunPandit wrote:Can't HAL keep on producing the MK1 planes on its own, I am sure it can bear with the carry cost, with nothing in sight IAF wont mind a plane. I am sure payments can be sorted out over time.
For IAF an inferior plane should be preferable to no plane
Re: LCA: News & Discussions - October 2016
ArjunPandit wrote:Can't HAL keep on producing the MK1 planes on its own, I am sure it can bear with the carry cost, with nothing in sight IAF wont mind a plane. I am sure payments can be sorted out over time.
For IAF an inferior plane should be preferable to no plane
It is not making them on their own, Saar!
Why do people say that? IAF has agree on taking six squadrons (120) MK1 in October 2015. The IAF has accepted LSP-1 that same year without weapons or even a productuon radar.
MoD is has ordered the planes and the IAF has supported by accepting the orders. What more can they do? Is the IAF supposed to buy and project manage HAL's production process too?!
The reason we are having this single-engine tender is because 45 Squadron has literally less than a handful of aircraft delivered after two years. MoD is not out to kill LCA. It has ordered over 120 including the LSPs. But it needs to meet the IAF's needs too within a reasonable time frame.
Re: LCA: News & Discussions - October 2016
ArjunPandit wrote:Chola, just threaten these babus to withhold their salaries, and see how they will be working like clockwork to get the planes of high quality

In Indian government jobs when one employee is punished the whole factory will go on strike. The MD of the factory - also a babu will come under pressure from the politician to settle the issue or the politician will lose votes. If the MD does not comply there will be gharao and he will later be transferred.
A doctor friend of mine, my senior at medical college who later became Chief Medical Officer of a major "navratna" defence PSU was slapped by a "class 4 employee" when I was a medical student in a central government run medical college in Pondicherry . We all cheerfully went on strike for this guy and gheraoed the director and did the usual stuff including hunger strike etc. It all ended with a whimper when the aggrieved chap we were fighting for was made to say "I forgive him".
-
- BRF Oldie
- Posts: 4067
- Joined: 29 Mar 2017 06:37
Re: LCA: News & Discussions - October 2016
No shiv saar, I have seen that happening in PSU banks. My father who retired from a PS bank, where CBS was not moving at a snail's pace. Results would start showing when CMDs would threaten the branch managers with stopping salary all the people getting it done.
If the govt becomes ruthless, then in the end even with these labor unions will have to fall in line. Speaking from my limited experience only.
If the govt becomes ruthless, then in the end even with these labor unions will have to fall in line. Speaking from my limited experience only.
Re: LCA: News & Discussions - October 2016
AP, Did HAL get funds to develop supply chain or funded for JIT? It starts from top. Finance Ministry is the key obstacle. Lot of competing demands for scarce resources. And banks are trained for that. When a new minister comes and gets the funds they don't know how to spend. Till 3 years ago another scam was UP A would allocate lots of money with understanding it won't be spent and returned. A PR stunt under clean mumdu.
Re: LCA: News & Discussions - October 2016
This was one of the major reasons for delay in Project 71 IAC. Sadly visionaries and persons of action are few in Indian Leadership and Manohar Parrikar is badly missed. Somehow Goa having a higher priority than Defence of our nation just shows our horribly skewed sense of priority.ramana wrote:Till 3 years ago another scam was UPA would allocate lots of money with understanding it won't be spent and returned. A PR stunt under clean mumdu.
Re: LCA: News & Discussions - October 2016
If one goes by the murmurs, there is an attempt to convert the 20 FOC order to Mk1A..srai wrote:From a risk-mitigation point of view, the assembly line should continue to produce Mk1 until the Mk1A becomes ready and then gradually switch over. That may mean additional one-or-two year production run for Mk1.ArjunPandit wrote:Can't HAL keep on producing the MK1 planes on its own, I am sure it can bear with the carry cost, with nothing in sight IAF wont mind a plane. I am sure payments can be sorted out over time.
For IAF an inferior plane should be preferable to no plane
It's quite ambitious, all power to HAL to deliver on it !
I was digging for information on the permanent waivers granted, and came across a CAG audit report.
It makes for very sorry reading.
Considering what has happened over the years, the 83 mk1A orders are nothing but an act of God and Mr.Parrikar an agent of God who made it happen. 108 pranaams to man !
The order for IOC 20 was placed in 2006 and FOC 20 in 2010. By the UPA goberment !!
The observation of CAG on failure by HAL to setup a production line were pretty damning.
https://www.google.co.in/url?sa=t&sourc ... fxAYXW6V5g
http://www.cag.gov.in/content/report-no ... ght-combat
Re: LCA: News & Discussions - October 2016
Did MoD give the funds to HAL to setup the line?
Re: LCA: News & Discussions - October 2016
Quoting from the report.ramana wrote:Did MoD give the funds to HAL to setup the line?
The above states money was sanctioned and utilised too, albeit at a very slow rate. From 2002-2014.4.3.1 Delay in creation of production facilities: Audit observed that HAL had been utilizing the existing facilities available with it for manufacture of LCA. Even though HAL initiated action in April 2006 to form a dedicated LCA facility, LCA Project Group was established as a full-fledged Division only in March 2014 as seen from HAL’s 371st Board Meeting papers. MoU of 2002 sanctioned `391.18 crore towards creation of facility i.e. Capital4 expenditure Rs. 188.71 crore and DRE5 `202.47 crore.Audit noticed that as of March 2014, HAL had incurred an amount of `118.99 crore (63 per cent) towards capital expenditure and `139.12 crore (69 per cent) towards DRE.
When reasons for delay in creation of manufacturing facility was enquired (October 2014) in audit, HAL stated (November 2014) that extensive changes in the design and development post 2006 had resulted in reviewing the facility requirement and a capacity augmentation plan was being put up for meeting the objectives. It was also stated that non-finalisation of configuration of LCA had led to the postponement of establishment of production facilities. Reply is not acceptable as the GoI sanction of November 2001 stipulated that the facilities for manufacture of eight LCA were to be created and the first LCA was to be delivered within 4 ½ years from the date of sanction i.e. by May 2006. Further, the delay in creation of manufacturing facility of eight aircraft per annum impacted the production of LSPs, as discussed in Para 4.3.4 as well as the Series Production Aircraft.
4 5 Capital expenditure consists of expenditure towards Plant & machinery and civil works. Deferred Revenue Expenditure (DRE) consists of expenditure towards tooling, test equipments, technical assistance, training, project management, publications and long and
Edit-
One thing that caught my eye in the report.
The flying daggers won't have much trouble with spares.
HAL expeditedly delivered about 100 crores worth of spares upto March 14 which could be used only after the squadron got equipped with the jets !

Re: LCA: News & Discussions - October 2016
Some geek bhai must have this info. Please helep karo !!
Please copy and paste. I just want to know if the
1. aircraft is retired
2. working with HAL/ ADA team
3. with Daggers @ IAF
4. with ASTE @ IAF
This is for IAF Tejas only.
Technology Demonstrators (TD)
TD-1 (KH2001) - Retired ?
TD-2 (KH2002) - Retired ?
Prototype Vehicles (PV)
PV-1 (KH2003) - Retired ?
PV-2 (KH2004) - Retired ?
PV-3 (KH2005) - Retired ?
PV-4 ? never Built ?
PV-5 (KH-T2009) - with HAL ?
PV-6 (KH-T2010) - with HAL ?
Limited Series Production
LSP-1 (KH2011) - with HAL ?
LSP-2 (KH2012) - with HAL ?
LSP-3 (KH2013) - with HAL ?
LSP-4 (KH2014) - with HAL ?
LSP-6 – Not built.[151]
LSP-7 (KH2017) – - with HAL ?
LSP-8 – - with HAL ?
Series Production
SP-1 - with Daggers @ IAF
SP-2 - with Daggers @ IAF
SP-3 - with ?
SP-4 - with ?
SP-5 - with ?
SP-6 - built and destined for Daggers @ IAF
Please copy and paste. I just want to know if the
1. aircraft is retired
2. working with HAL/ ADA team
3. with Daggers @ IAF
4. with ASTE @ IAF
This is for IAF Tejas only.
Technology Demonstrators (TD)
TD-1 (KH2001) - Retired ?
TD-2 (KH2002) - Retired ?
Prototype Vehicles (PV)
PV-1 (KH2003) - Retired ?
PV-2 (KH2004) - Retired ?
PV-3 (KH2005) - Retired ?
PV-4 ? never Built ?
PV-5 (KH-T2009) - with HAL ?
PV-6 (KH-T2010) - with HAL ?
Limited Series Production
LSP-1 (KH2011) - with HAL ?
LSP-2 (KH2012) - with HAL ?
LSP-3 (KH2013) - with HAL ?
LSP-4 (KH2014) - with HAL ?
LSP-6 – Not built.[151]
LSP-7 (KH2017) – - with HAL ?
LSP-8 – - with HAL ?
Series Production
SP-1 - with Daggers @ IAF
SP-2 - with Daggers @ IAF
SP-3 - with ?
SP-4 - with ?
SP-5 - with ?
SP-6 - built and destined for Daggers @ IAF
Re: LCA: News & Discussions - October 2016
Sir SP-3 and SP-4 are with the squadron.
Re: LCA: News & Discussions - October 2016
Some answers here: https://www.ada.gov.in/images/flighttestnews.htmKhalsa wrote:Some geek bhai must have this info. Please helep karo !!
Please copy and paste. I just want to know if the
1. aircraft is retired
2. working with HAL/ ADA team
3. with Daggers @ IAF
4. with ASTE @ IAF
This is for IAF Tejas only.
Technology Demonstrators (TD)
TD-1 (KH2001) - Retired ?
TD-2 (KH2002) - Retired ?
Prototype Vehicles (PV)
PV-1 (KH2003) - Retired ?
PV-2 (KH2004) - Retired ?
PV-3 (KH2005) - Retired ?
PV-4 ? never Built ?
PV-5 (KH-T2009) - with HAL ?
PV-6 (KH-T2010) - with HAL ?
Limited Series Production
LSP-1 (KH2011) - with HAL ?
LSP-2 (KH2012) - with HAL ?
LSP-3 (KH2013) - with HAL ?
LSP-4 (KH2014) - with HAL ?
LSP-6 – Not built.[151]
LSP-7 (KH2017) – - with HAL ?
LSP-8 – - with HAL ?
Series Production
SP-1 - with Daggers @ IAF
SP-2 - with Daggers @ IAF
SP-3 - with ?
SP-4 - with ?
SP-5 - with ?
SP-6 - built and destined for Daggers @ IAF
https://www.ada.gov.in/images/Annual%20 ... 015-16.pdf
Re: LCA: News & Discussions - October 2016
It's a tribute to the care that the LCA program has taken for the test flights. Shows their dedication.
Re: LCA: News & Discussions - October 2016
And perhaps shows their fear too, for what would happen if there would be some failure or mishap during flight testing.ramana wrote:It's a tribute to the care that the LCA program has taken for the test flights. Shows their dedication.
We just saw a demonstration with the new rifle made by OFB. It was termed a failure even before the actual user trials started and was "lynched" by MSM including some folks who you would expect to know better. Saras is another living example.