Indian Military Helicopters
Re: Indian Military Helicopters
Fennec was the one originally chosen in 2007 but that tender was cancelled after the corruption allegations. They competed again in the second tender but I don't think any government was going to take the chance of selecting it again. Doesn't matter if it was better or worse than the Kamov.
Re: Indian Military Helicopters
Ah well. Why? Production quality, or low power?deejay wrote:My post was to dispel any myths that folks may have for European systems. My POV is we need those helicopters urgently. I am not a fan of KA 226 having seen it up close now.
Also HAL finally waking up to providing service and spares helping its products reach 65% availability (hopefully will continue to rise till 80% and beyond for domestic designs).LUH - great high altitude performance expectations. I will wait for trials. Should do well given HALs past experience with ALH.
Re: Indian Military Helicopters
The army technology description has a company provided description; we dont have the actual IA reports etc. to state it was better than its western counterparts.Philip wrote:A very detailed post was given by Ramana above.The KA-226 also underwent extensive testing and from official reports,was evaluated as being "better" than its Western counterparts.Let's leave it that.
On a technical ground every selection can be disputed since each design has trade offs and its all dependent on what weights the evaluator adds to which criteria.No one also disputes the selection of the Rafale on technical ground,and it also was supposedly cheaper than the Typhoon.
Agree.Every defence deal will have some degree of political consideration too,especially if there is a virtual "dead heat" between the finalists!
Re: Indian Military Helicopters
To sum up, Kamov 226T was chosen
- After trials
- Fills and IA need. The order mix shows this.
- And helicopters are needed now not later.
LUH may or may not be made later.
Fennec got out of the competition due to bribes.
No one would associate again as the allegation will come up whether true or not this time.
Also not 2007 was clean mundu AKA time.
- After trials
- Fills and IA need. The order mix shows this.
- And helicopters are needed now not later.
LUH may or may not be made later.
Fennec got out of the competition due to bribes.
No one would associate again as the allegation will come up whether true or not this time.
Also not 2007 was clean mundu AKA time.
Re: Indian Military Helicopters
I think Ka-226 presents an opportunity to develop bespoke pods for different applications. It could trigger innovation and create space for pvt involvement.
I would love to see special operations variant with MG mounts and methods for quick embark/disembarkation.
A unit could drop self contained pods at isolated areas (portable kitchens?) And pick them up when job is done.
I would love to see special operations variant with MG mounts and methods for quick embark/disembarkation.
A unit could drop self contained pods at isolated areas (portable kitchens?) And pick them up when job is done.
Re: Indian Military Helicopters
Looks like this deal is going nowhere fast, because of exorbitant costing (2.5x for local choppers at 40% indigenization). Which means the LUH may end up being the final answer.
https://www.livefistdefence.com/2017/10 ... -deal.html
http://indiatoday.intoday.in/story/kamo ... 60527.html
http://ajaishukla.blogspot.in/2016/01/m ... kamov.html
https://www.livefistdefence.com/2017/10 ... -deal.html
http://indiatoday.intoday.in/story/kamo ... 60527.html
http://ajaishukla.blogspot.in/2016/01/m ... kamov.html
Re: Indian Military Helicopters
Sorry if this was already posted before:
India's Rudra Helicopter back in sight, Still waiting for missiles
The Rudra is hardly 'armed but toothless.'
It has those 48, 70mm rockets and the GIAT gun.
Its sad that DRDO missile development are always so late that the rest of the products march on and get held up.
HELINA is being talked for years...
So IA plans 7 squadrons for the Rudra helicopters.
India's Rudra Helicopter back in sight, Still waiting for missiles
HAL’s Rudra, a weaponised and hunt-focused Mk.4 version of the trusty Dhruv, is still settling in with its primary customer — the Indian Army signed on earlier this month for 18 more, taking the total size of its intended fleet to 78 aircraft. The Army currently 23 Rudras across three operational squadrons, with plans to raise four more squadrons. A further 21 airframes are currently under test at HAL Bengaluru. HAL will produce a total of 34 more Rudras to complete the Army’s current confirmed order book of 78. More from Defence Minister Sitharaman’s tour of a Rudra at AFS Naliya:....
While the Army is largely pleased with the Rudra, save some niggles being sorted out with HAL, a serious unresolved flashpoint between the Indian Army and the copter remains its lack of an anti-tank guided missile. India continues to stall on a decision to award a contract for 124 launchers and 1,362 missiles to either MBDA or Rafael Defence for the PARS L3 or Spike ER respectively. The indigenous HELINA ATGM is still at least two years away from proving itself on the Rudra’s launchers. Livefist can confirm that Minister Sitharaman has been brought up to speed on the Rudra’s pecular ‘armed-but-weaponless’ situation and moving forward on a decision will be one of the things on her table soon.
Official HAL literature on the Rudra details the platform thus:
The Rudra can deploy 48, 70mm rockets at standoff ranges of more than 8 km, a turret mounted 20 mm cannon cued to its electro optical payload or the pilot’s helmet mounted cuing system. This provides Rudra immediate and accurate firepower against ground and aerial targets. Pilot only has to look at the target and fire. With an advanced ballistic computer, the guns are very accurate even at extreme angles. Fire and forget anti-tank guided missiles with 7-km range make Rudra an ideal platform for ground support roles. Rudra can carry four air to air missiles. These are infra red guided fire and forget missiles with off axis boresight capability. Pilot can engage the target using the helmet mounted sight or with the electro optical pod, while manoeuvering. State of the art sensors complement this tremendous firepower. Gyrostabilised electro optical sensors work on both visual and IR spectrum. Any type of target will be picked up and tracked at large distances, whether by day or by night. These targets can be handed over to the guided missiles or attacked with rockets and gun. The laser designator can designate the target for any compatible weapon. A comprehensive self protection suite would empower the pilot with essential situational awareness of the elctromagnetic and laser environment.
The Rudra is hardly 'armed but toothless.'
It has those 48, 70mm rockets and the GIAT gun.
Its sad that DRDO missile development are always so late that the rest of the products march on and get held up.
HELINA is being talked for years...
So IA plans 7 squadrons for the Rudra helicopters.
Re: Indian Military Helicopters
So once this Rudra production is complete the facility can be switched to LUH which is now undergoing trials?
Re: Indian Military Helicopters
No ji for me please. I am just comfortable with titles.Manish_P wrote: Indranil ji, do you mean to say that the ceiling numbers of the KA-226 are minus the pod ?
Kamov's website says that the Ka-226Ts OGE is 4600 mtrs. I don't know in what configuration. But, it will be light.
If LUH has the same hover performance has ALH, then ...
Bangalore ALH pilots fly high
We already know that ALH can lift 600 kgs at 21000 feet in the summers. If LUH shares the high altitude genes of ALH, then it will run circles around a KA-226 at altitude.Upadhyay describes that flight: "We started climbing stage by stage... 20,000 feet, 23, 24, 25, 26 and then 27,500. It had never been done before. We were hovering and watching a Cheetal (another helicopter) land just below us at 25,100 feet. Landing at that height isn't easy. We were ready to pick up the pilot if something went wrong.
When IA/IAF was evaluating Ka-226T, it's engine was not even certified.
Re: Indian Military Helicopters
Plenty of scope for 200+ LUHs as the Kamov deal is for 200 only, and tri-service plus civvy needs will require at least 400+ helos.The L UH must quickly finish its trials and enter production.KAs engines are French by the way.
Reg.Rudra's missiles, why can't the missiles being used aboard the MI-35s be used in the interim until HELINA arrives?
Reg.Rudra's missiles, why can't the missiles being used aboard the MI-35s be used in the interim until HELINA arrives?
Re: Indian Military Helicopters
What "missiles" do the Indian Mi-35 carry which is not already on Rudra?
Re: Indian Military Helicopters
Can anybody give me a sensible reason why we should go for both Ka-226 if LUH and Ka-226 are to both start coming in from 2019, and built by the same company? Mind you Ka-226s will be more expensive. Afterall, we are getting ToT
To me, it made sense in 2007. May be even in 2011. In 2017? When 2 LUH's have been flying for the past 1 year or so?
To me, it made sense in 2007. May be even in 2011. In 2017? When 2 LUH's have been flying for the past 1 year or so?
Re: Indian Military Helicopters
Answering my own question: 9K114 Shturm.Indranil wrote:What "missiles" do the Indian Mi-35 carry which is not already on Rudra?
Line of sight attack only: no top attack capability
Continuous guidance required: no fire and forget capability
Daylight laser range finder
Re: Indian Military Helicopters
Has the LUH completed all its trials? How long is it going to take and when will it enter serial production? Will it really enter prod. in 2019 and at what rate? These are still unknown factors only estimates.Its design is also diff.No med. pods or modules that can be dropped off like mini- containers for differing roles. This is a great capability esp. for the mountains.
However there are other regions where a conv. helo can do the biz. and the LUH will come into its own .As I said the civil market will also take off.Air ambulances have just started entering service.Recently there was a media report about a south- based hospital starting such a service.
We also know that HAL's prod. rates are low.The IA has been waiting for years for replacements of its French origin desi-built birds which have in recent times been crashing more frequently.The IA is to get the first 60 built in Russia asap, part of the deal.No waiting time for the Indian plant to deliver, accelerating time for in induction.
However there are other regions where a conv. helo can do the biz. and the LUH will come into its own .As I said the civil market will also take off.Air ambulances have just started entering service.Recently there was a media report about a south- based hospital starting such a service.
We also know that HAL's prod. rates are low.The IA has been waiting for years for replacements of its French origin desi-built birds which have in recent times been crashing more frequently.The IA is to get the first 60 built in Russia asap, part of the deal.No waiting time for the Indian plant to deliver, accelerating time for in induction.
Re: Indian Military Helicopters
The pods are so useful an idea that NO heli manufacturer builds them and NOBODY, not even the host country uses them!
Let me draw some use cases. Forget the Sonam posts, these are how mountainside helipads look like:
The reason they are called postage size is because they don't have much clearance around them a large enough flat surface. So in this clutter, you want to add more adventure and add and remove 1 ton pods with next to no machinery? By the way, this pod you are putting back on has been lying exposed to the elements since the last time the heli left was there. How is it cleared for flight again? I will let Deejay comment on how idiotic that sounds.
Let me draw a more realistic picture employed day in and day out by the armed forces. Heli flies in with a flat bed for luggage and a few chairs in case of in bound passengers. Heli unloads luggage and passengers and reloads with return luggage and passengers. Fast in and fast out. REquires less fuel. Much safer too. You can reach higher and further too. In case of a medical evacuation, heli flies in with medic, first aid, and in bound luggage. Luggage is dropped. Patient is loaded, and off they go. If a stretcher is required, a light weight stretcher is flown in typically weighs around 10 kgs. With a pod loaded with shiny medical instrument, you won't reach beyond a few 3000 mtrs. And you want to leave that pod behind sometimes? How cheap is this pod?
This is what the "typical" looks like.
You can hold on to whatever fanciful imagination you have, just because a Russi designed it.
Let me draw some use cases. Forget the Sonam posts, these are how mountainside helipads look like:
The reason they are called postage size is because they don't have much clearance around them a large enough flat surface. So in this clutter, you want to add more adventure and add and remove 1 ton pods with next to no machinery? By the way, this pod you are putting back on has been lying exposed to the elements since the last time the heli left was there. How is it cleared for flight again? I will let Deejay comment on how idiotic that sounds.
Let me draw a more realistic picture employed day in and day out by the armed forces. Heli flies in with a flat bed for luggage and a few chairs in case of in bound passengers. Heli unloads luggage and passengers and reloads with return luggage and passengers. Fast in and fast out. REquires less fuel. Much safer too. You can reach higher and further too. In case of a medical evacuation, heli flies in with medic, first aid, and in bound luggage. Luggage is dropped. Patient is loaded, and off they go. If a stretcher is required, a light weight stretcher is flown in typically weighs around 10 kgs. With a pod loaded with shiny medical instrument, you won't reach beyond a few 3000 mtrs. And you want to leave that pod behind sometimes? How cheap is this pod?
This is what the "typical" looks like.
You can hold on to whatever fanciful imagination you have, just because a Russi designed it.
Re: Indian Military Helicopters
We don't know what HAL plans are for the helicopters.
They have ALH/LCH, Rudra, LUH, Medium helicopter IMRH, replacement for Mi17.
They have the old HAL helicopter factory bldg.
A new one is supposed to come up in Tumkur.
Where is the KA226 to be assembled?
They have ALH/LCH, Rudra, LUH, Medium helicopter IMRH, replacement for Mi17.
They have the old HAL helicopter factory bldg.
A new one is supposed to come up in Tumkur.
Where is the KA226 to be assembled?
Re: Indian Military Helicopters
Wherever the KA226 is assembled (by HAL ), it could have been used to assemble more LUHs, right? What are we gaining exactly?
Now,
1. We will be buying Ka226s at a price higher than LUH
2. Push LUH prices higher by reducing the number of orders
3. Increase maintenance price and headache
When the Ka-226T was "selected" in Aug 2014, it was not certified either. It got certification a year later.
Now,
1. We will be buying Ka226s at a price higher than LUH
2. Push LUH prices higher by reducing the number of orders
3. Increase maintenance price and headache
When the Ka-226T was "selected" in Aug 2014, it was not certified either. It got certification a year later.
Re: Indian Military Helicopters
Russia has not produced more the 30-40 Ka-228Ts since 2002, and we have a guarantee that their production rate will be higher then HAL’s?
Re: Indian Military Helicopters
Please tell me that is a joke.Indranil wrote:When the Ka-226T was "selected" in Aug 2014, it was not certified either. It got certification a year later.
Did the MoD just buy a chopper that was not certified? I am not discounting what you are saying, but I cannot fathom on what basis the MoD cleared the purchase of an un-certified platform. Was this not known to them at the time of purchase?
Re: Indian Military Helicopters
I am not singling out one thing. Just did not like the entire package. Having flown the Mi 17 family mostly, I am in love with Russian designs and understand how they make things but the Ka 226 is not the Mi 17. Will wait for more open source literature.Karan M wrote:Ah well. Why? Production quality, or low power?deejay wrote:My post was to dispel any myths that folks may have for European systems. My POV is we need those helicopters urgently. I am not a fan of KA 226 having seen it up close now.
Karan, HAL has not woken up to services and spare support. Ask the Nepalese. If HAL spruces up on this, I am pretty sure that not a single helicopter will fly in the Himalayas (Nepal, Bhutan, India) either military or civil and the Andes which is not either ALH or LUH. The performance difference with competition is that big. It will take a decade for the change to happen but it will happen.Karan M wrote:Also HAL finally waking up to providing service and spares helping its products reach 65% availability (hopefully will continue to rise till 80% and beyond for domestic designs).LUH - great high altitude performance expectations. I will wait for trials. Should do well given HALs past experience with ALH.
Re: Indian Military Helicopters
Yes, indeed, its hilarious the extent people invent fanciful reasons to justify. Dhruv & Mi-17 can carry any underslung containerised "pods" that the lower powered Ka-226 can.Indranil wrote:The pods are so useful an idea that NO heli manufacturer builds them and NOBODY, not even the host country uses them! You can hold on to whatever fanciful imagination you have, just because a Russi designed it.
In the IAF & IA, the Chetak is being replaced by Dhruv and only Cheetah replacement is required that hopefully LUH can quickly fulfill. LUH has no weapon requirement and so its testing should be faster than LCH. And after testing of Dhruv, Rudra & LCH, hopefully LUH can expedite the process.
And if HAL develops new gearboxes optimized for higher power rating and better load capacity at sea level, then the Naval requirement too can be fulfilled by Dhruv & LUH.
Re: Indian Military Helicopters
Certification was happening in parallel , Since we wanted a french engine for hot and high performance it was demonstrated what was asked for and since were were familiar with french engine performance it was agreed to let certification continue without holding trails , it was certified in 2015 by RussianRakesh wrote:Please tell me that is a joke.Indranil wrote:When the Ka-226T was "selected" in Aug 2014, it was not certified either. It got certification a year later.
Did the MoD just buy a chopper that was not certified? I am not discounting what you are saying, but I cannot fathom on what basis the MoD cleared the purchase of an un-certified platform. Was this not known to them at the time of purchase?
Certification of Ka-226T helicopter powered by French engines has been successfully completed in Russia
more details on Ka-226 with French Engine
https://www.ainonline.com/aviation-news ... lo-contest
Speaking to AIN at the HeliRussia 2015 show in Moscow last month, Olivier Andries, chairman and chief executive officer at Turbomeca, said: “our partnership with Russian Helicopters, and with India, is crucial.” He noted that Turbomeca has been in India for 50 years and is currently the supplier of engines for most Indian military helicopters. “Through the Ka-226T project we can develop our presence in this marketplace,” Andries added. He said that although manufacturing details are yet to be agreed, “we will probably follow the guidance of Russian Helicopters, but we have to be compliant with the ‘Make in India’ requirement. So, it may well be that these engines will be assembled in India and partly manufactured there.”
Certified in November 2011, the Arrius 2G develops 804 shaft horsepower at emergency setting, 730 shp at takeoff and 622 shp at maximum continuous mode, compared to the Rolls-Royce Allison’s 450 shp at takeoff and 380 shp at max continuous settings. Due to the French engine’s higher power, the rotorcraft’s maximum takeoff weight has been increased from 3.4 to 3.6 metric tons. The configuration of the Ka-226T may have been the crucial factor in its selection: it is noticeably slower than the Fennec, but hot-and-high performance in mountain areas was a key criteria for India, and the coaxial main-rotor layout takes maximum advantage of engine power. The Ka-226T also features a beefed-up VR-226 gearbox and improved avionics, compared with the original Ka-226. The certification trials of the Arrius 2G were performed on two Ka-226T prototypes
Last edited by ramana on 09 Dec 2017 00:22, edited 1 time in total.
Reason: Added bold and underline.. ramana
Reason: Added bold and underline.. ramana
Re: Indian Military Helicopters
As per the original agreement weren't the Shakti engines supposed to have full TOT as some point, so hopefully both these Engines can be manufactured fully in India by Turbomeca
Re: Indian Military Helicopters
Wow! Unbelievable. How did they evaluate the performance of the Ka-226 before selecting it if it wasn;t even certified to fly with the engine that was being offered? Anyone still doesn't believe Indranil when he says this was done to keep the Russians happy?Austin wrote: Certification was happening in parallel , Since we wanted a french engine for hot and high performance it was demonstrated what was asked for and since were were familiar with french engine performance it was agreed to let certification continue without holding trails , it was certified in 2015 by Russian
Certification of Ka-226T helicopter powered by French engines has been successfully completed in Russia
Re: Indian Military Helicopters
The key word is urgent. Has anyone driven far enough ahead of curve to see how many posts are supplied by helicopter? Please point me to someone who will answer that question without fudging and shifting the goalpost, which is the usual tactic on BRF.deejay wrote:My post was to dispel any myths that folks may have for European systems. My POV is we need those helicopters urgently. I am not a fan of KA 226 having seen it up close now.
LUH - great high altitude performance expectations. I will wait for trials. Should do well given HALs past experience with ALH.
Re: Indian Military Helicopters
Admiral, why does that surprise you? How many more examples do you want? When is Gripen E's certification date. Meanwhile, HAL has to make LSPs of LCH on its own money in anticipation of orders.
Ditto Deejay, what HAL can do with a world beating product like ALH is lesson world class lesson in mismanagement. They can't even get it certified elsewhere.
Actually, I love Russian helis too. But pods?!!! I would have loved for India to say to save the money on this ToT, and plunk it into a collaboration between HAL and Kamov to develop a light and a medium coaxial heli with pusher props. There are guaranteed orders for that in India and elsewhere.
Ditto tsarkar sahab. I don't how long I have been shouting for that higher rated transmission for better sea level performance. Instead, they have employed a bunch of young people to design an amphibian with rows !!!!!
Austin, we did not ask for the Arrius engines. Kamov had been mulling them for a long time. They ordered their two engines in 2002, and got them in 2003. It took them 12 years to certify. But hey, why would Philip sir register that as slow?
Ditto Deejay, what HAL can do with a world beating product like ALH is lesson world class lesson in mismanagement. They can't even get it certified elsewhere.
Actually, I love Russian helis too. But pods?!!! I would have loved for India to say to save the money on this ToT, and plunk it into a collaboration between HAL and Kamov to develop a light and a medium coaxial heli with pusher props. There are guaranteed orders for that in India and elsewhere.
Ditto tsarkar sahab. I don't how long I have been shouting for that higher rated transmission for better sea level performance. Instead, they have employed a bunch of young people to design an amphibian with rows !!!!!
Austin, we did not ask for the Arrius engines. Kamov had been mulling them for a long time. They ordered their two engines in 2002, and got them in 2003. It took them 12 years to certify. But hey, why would Philip sir register that as slow?
Re: Indian Military Helicopters
Hakeem,
You raise a good point. IA/IAF's need to replace the Chetaks and Cheetals/Cheetahs is very urgent. It was pretty urgent in 2004. And I myself was supportive of the RSH program then. Even in 2008, when HAL was just showing cheap plastic models, I was in support of RSH. I used to be in support of RSH for another reason: I was hoping it will be built by a private sector company. Tata setting up Indian rotorcraft was such a happy moment for me (ofcourse the AW scam killed it).
But in 2017, you can't say that Ka-226 acquisition suffices an urgent need. It is to be built by the same HAL by setting up a new production facility flies in the face of that argument! HAL knows how to build LUHs at much higher rate from day 1. Nobody in HAL/MoD/IAF/IA is ga ga over it. Intent was signed in 2015. The Russians acknowledged that NOTHING happened from then till late 2017 (when they talked to Sitharaman). Nothing else will happen till a high dignitary visits Moscow or New Delhi. That's how excited HAL/MoD/IAF/IA is about the project. It is todays equivalent of the MTA or US-2.
But I agree, it is a done deal. It has to be completed unless Putin decides not to run for Presidency in 2018.
You raise a good point. IA/IAF's need to replace the Chetaks and Cheetals/Cheetahs is very urgent. It was pretty urgent in 2004. And I myself was supportive of the RSH program then. Even in 2008, when HAL was just showing cheap plastic models, I was in support of RSH. I used to be in support of RSH for another reason: I was hoping it will be built by a private sector company. Tata setting up Indian rotorcraft was such a happy moment for me (ofcourse the AW scam killed it).
But in 2017, you can't say that Ka-226 acquisition suffices an urgent need. It is to be built by the same HAL by setting up a new production facility flies in the face of that argument! HAL knows how to build LUHs at much higher rate from day 1. Nobody in HAL/MoD/IAF/IA is ga ga over it. Intent was signed in 2015. The Russians acknowledged that NOTHING happened from then till late 2017 (when they talked to Sitharaman). Nothing else will happen till a high dignitary visits Moscow or New Delhi. That's how excited HAL/MoD/IAF/IA is about the project. It is todays equivalent of the MTA or US-2.
But I agree, it is a done deal. It has to be completed unless Putin decides not to run for Presidency in 2018.
Re: Indian Military Helicopters
^^^
Everything is "urgent" in India and that is because of long-drawn out acquisition process for imported weapon systems and for indigenous systems a lot of time for R&D/trails/etc. From 2004 -> 2017 how many rounds of RFI/RFP/trials/mistrials/retrials/selection/wait/etc for the light helo? 13-years (going on 14-years) later what was urgent back then still has not materialized. Same for fighter acquisition and other major programs of IA and IN.
Everything is "urgent" in India and that is because of long-drawn out acquisition process for imported weapon systems and for indigenous systems a lot of time for R&D/trails/etc. From 2004 -> 2017 how many rounds of RFI/RFP/trials/mistrials/retrials/selection/wait/etc for the light helo? 13-years (going on 14-years) later what was urgent back then still has not materialized. Same for fighter acquisition and other major programs of IA and IN.
Re: Indian Military Helicopters
Shakti is manufactured in India 80 % , 20 % component comes from French outright ( this is as per the agreement ) was something the French OEM informed me when I inquired.Aditya_V wrote:As per the original agreement weren't the Shakti engines supposed to have full TOT as some point, so hopefully both these Engines can be manufactured fully in India by Turbomeca
Re: Indian Military Helicopters
Doc, the number is in thousands though not all our supplied daily, weekly or monthly. New posts come up regularly. Some older posts go out of use.shiv wrote:The key word is urgent. Has anyone driven far enough ahead of curve to see how many posts are supplied by helicopter? Please point me to someone who will answer that question without fudging and shifting the goalpost, which is the usual tactic on BRF.deejay wrote:My post was to dispel any myths that folks may have for European systems. My POV is we need those helicopters urgently. I am not a fan of KA 226 having seen it up close now.
LUH - great high altitude performance expectations. I will wait for trials. Should do well given HALs past experience with ALH.
The road construction in NE alone will have opened up 20 odd helipads. The regular posts on glacier are of course the most frequented. But they are a tiny fraction of the overall helipads just in hills alone.
Re: Indian Military Helicopters
Isn't this what lead to the AW-101 scandal? No actual trial on the mil version etc.nachiket wrote:Wow! Unbelievable. How did they evaluate the performance of the Ka-226 before selecting it if it wasn;t even certified to fly with the engine that was being offered? Anyone still doesn't believe Indranil when he says this was done to keep the Russians happy?
I tell you, EVERY deal by GoI between 2004-2014 needs a re-look
We blame MoD for delays, but in this instance their delay might end up helping a domestic product! Hail the Babus at the MoD for this !!!
Re: Indian Military Helicopters
Apart from the usual allegations that we are import friendly, the other aspect is that the LCA, ALH and LCH are first time products by a new designer and manufacturer. The HF-24 and the Kirans apparently do no matter to some folks.Indranil wrote:When is Gripen E's certification date. Meanwhile, HAL has to make LSPs of LCH on its own money in anticipation of orders.
Certifying a new engine on an already flying design is something that can be expected to happen without major problems, if the engine dimensions, design and controls are known.
However...
The original russian engines on the civilian KA-26 was the Vedeneyev M14P, an engine designed in the 1940s which still has a carburetor, and produces 360 hp (268 kW).
The original engine on the KA-226 mil version was the Allison Model 250 (Rolls-Royce M250 after RR acquired the company)
This is an early 1960s design, generating 250 hp (190 kW)
Instead the IAF asked for the Turbomecca Arieus 2G1
Likely electronically controlled, generating 388 KW, designed in the 70s and initial versions produced in 1980. 2G1 is a more modern improvement, generating upto 750 shp
This is quite a leap of faith by MoD to accept the helicopter, pending this possible modification
Last edited by Gagan on 09 Dec 2017 13:48, edited 1 time in total.
Re: Indian Military Helicopters
Compare these to the big boss Turbomeca Ardiden 1H - HAL Shakti
Generates 1,032 kW, 1384 shp designed in 1999
-----------------------------------------------------------------------------------------------------------------------------------------
Although initial models of the Dhruv flew with the Turbomeca TM-333 2B2 1100 HP engine
This engine is used on upgraded Cheetah and Chetaks
Generates 1,032 kW, 1384 shp designed in 1999
-----------------------------------------------------------------------------------------------------------------------------------------
Although initial models of the Dhruv flew with the Turbomeca TM-333 2B2 1100 HP engine
This engine is used on upgraded Cheetah and Chetaks
Last edited by Gagan on 09 Dec 2017 13:56, edited 1 time in total.
Re: Indian Military Helicopters
AW scam was obvious when signed, exorbitant cost for 12(?) birds when even O'Bomber had cancelled his order for 7 cost being the official reason - also due to pressure from US OEMs.Our price was far in excess of that for MC-1.
News to me the the ALH is not certified internationally.How did we then sell it to Ecuador?
News to me the the ALH is not certified internationally.How did we then sell it to Ecuador?
Re: Indian Military Helicopters
Military sale does not need international civil certification.
Re: Indian Military Helicopters
Chief designer states that the podded cabin on the 226 can be put on in 1 hour.
1 hour for putting it on, 1 hour for taking it off.
1 hour for putting it on, 1 hour for taking it off.
Re: Indian Military Helicopters
The Ka 's detachable cabin pods are integral to the bird unlike conv. helos.They if lifting any pod/ load would have to do it underslung.The weight of their cabins would reduce the weight of any underling payload.A Kamov could also carry an underslung load as well as the detachable cabin/pod.
Is I hr for detaching the cabin a bit long ? A report posted by another member said that it required only 2 people to detach/ attach it.
Is I hr for detaching the cabin a bit long ? A report posted by another member said that it required only 2 people to detach/ attach it.
Re: Indian Military Helicopters
Gagan sir,
The Indians did not ask for them for any engine changes. We had no interest in the heli back then. A 3500 kg heli, powered by two 250 hp engines is woefully underpowered. They knew it and decided to change the powerhouse in the late 1990s itself. After consulting with Turbomecca, they ordered the new engines in 2002. They got the engines in 2003. The Indians enter the frame in late 2004.
They could not field the heli with the new engines in the RSH competition. 'This was cited as one of the reasons by the forces for the non compliance to requirements when RSH was canceled in 2014.
Interestingly, Putin came visiting in 2014 and personally put in a word for the Kamov. The MOU to Buy and Make 226Ts in India was signed soon thereafter and cemented into place when Modi visited Moscow in 2015.
The Indians did not ask for them for any engine changes. We had no interest in the heli back then. A 3500 kg heli, powered by two 250 hp engines is woefully underpowered. They knew it and decided to change the powerhouse in the late 1990s itself. After consulting with Turbomecca, they ordered the new engines in 2002. They got the engines in 2003. The Indians enter the frame in late 2004.
They could not field the heli with the new engines in the RSH competition. 'This was cited as one of the reasons by the forces for the non compliance to requirements when RSH was canceled in 2014.
Interestingly, Putin came visiting in 2014 and personally put in a word for the Kamov. The MOU to Buy and Make 226Ts in India was signed soon thereafter and cemented into place when Modi visited Moscow in 2015.
Re: Indian Military Helicopters
Indranil, wiki says the certification for Ka-226T with the Arrius 2G engines was done in April 2015. Why did it take them 12 years to complete certification if they received the engines in 2003 as you say?Indranil wrote:Gagan sir,
The Indians did not ask for them for any engine changes. We had no interest in the heli back then. A 3500 kg heli, powered by two 250 hp engines is woefully underpowered. They knew it and decided to change the powerhouse in the late 1990s itself. After consulting with Turbomecca, they ordered the new engines in 2002. They got the engines in 2003. The Indians enter the frame in late 2004.
They could not field the heli with the new engines in the RSH competition. 'This was cited as one of the reasons by the forces for the non compliance to requirements when RSH was canceled in 2014.
Interestingly, Putin came visiting in 2014 and personally put in a word for the Kamov. The MOU to Buy and Make 226Ts in India was signed soon thereafter and cemented into place when Modi visited Moscow in 2015.
Also, our deal was signed in Dec 2015. So it was certified then but the trials happened before that. Did they allow trials using the new engines without certification? If so ,this sort of consideration should be provided to indigenous programs too.
Re: Indian Military Helicopters
What does India get in return for this gift (national waste) to Russia?