The Technology & Economic Forum is a venue to discuss issues pertaining to Technological and Economic developments in India. We request members to kindly stay within the mandate of this forum and keep their exchanges of views, on a civilised level, however vehemently any disagreement may be felt. All feedback regarding forum usage may be sent to the moderators using the Feedback Form or by clicking the Report Post Icon in any objectionable post for proper action. Please note that the views expressed by the Members and Moderators on these discussion boards are that of the individuals only and do not reflect the official policy or view of the Bharat-Rakshak.com Website. Copyright Violation is strictly prohibited and may result in revocation of your posting rights - please read the FAQ for full details. Users must also abide by the Forum Guidelines at all times.
KL Dubey
BRF Oldie
Posts: 2618
Joined: 16 Dec 2016 22:34

Re: India's Power Sector

Post by KL Dubey »

Good balanced article highlighting all aspects of Bharat's power sector transition:

The US is slipping behind India’s clean power boom

https://www.taipeitimes.com/News/editor ... 2003841141

Excerpt:
For many years, India had a skeptical take on the energy transition, arguing since the 1970s that poverty was a more pressing problem than protecting the environment. The difference now is that zero-carbon power is decisively cheaper than the competition.

Meanwhile, rising incomes mean the government needs to also think about the needs of about half a billion middle-class citizens, who worry more about where to find a good job in a clean, livable city than the basics of subsistence living.

India is still building coal-fired power plants to make sure those newly minted urbanites do not suffer power cuts in the middle of punishing heat waves, but they are not necessarily being used. Thanks to milder weather than in the past few years and the rising volumes of renewables pushing it off the grid, fossil-fired power generation fell 4 percent in the first half relative to last year.
A_Gupta
BRF Oldie
Posts: 15526
Joined: 23 Oct 2001 11:31
Contact:

Re: India's Power Sector

Post by A_Gupta »

> fossil-fired power generation fell 4 percent in the first half relative to last year.

Amazing. And this while manufacturing PMI has been healthy for months. I assume here that major manufacturing does not have captive power plants.
Vayutuvan
BRF Oldie
Posts: 14757
Joined: 20 Jun 2011 04:36

Re: India's Power Sector

Post by Vayutuvan »

> Thanks to milder weather than in the past few years and the rising volumes of renewables
KL Dubey
BRF Oldie
Posts: 2618
Joined: 16 Dec 2016 22:34

Re: India's Power Sector

Post by KL Dubey »

A_Gupta wrote: 03 Aug 2025 19:07 > fossil-fired power generation fell 4 percent in the first half relative to last year.

I assume here that major manufacturing does not have captive power plants.
I don't think we can know until we dig into the PMI numbers. Captive power is a huge segment in Bharat.
rajkumar
BRFite
Posts: 534
Joined: 22 Sep 2000 11:31
Location: London U.K
Contact:

Re: India's Power Sector

Post by rajkumar »

https://swarajyamag.com/infrastructure/ ... interlands

'Na Bijli Aayegi...' — How A Stubborn CM And An IAS Brought Electricity To Bihar's Hinterlands
uddu
BRF Oldie
Posts: 6045
Joined: 15 Aug 2004 17:09

Re: India's Power Sector

Post by uddu »

https://x.com/larsentoubro/status/1958407166274224507
Marking yet another milestone in India’s civil nuclear energy programme, L&T Heavy Engineering has despatched a Steam Generator to the Gorakhpur Haryana Anu Vidyut Pariyojana (GHAVP), located in Fatehabad district, Haryana.
Image
Suraj
Forum Moderator
Posts: 15199
Joined: 20 Jan 2002 12:31

Re: India's Power Sector

Post by Suraj »

Haven't seen this before - Niti Aayog has a nice power sector dashboard:
India Climate and Energy Dashboard
vijayk
BRF Oldie
Posts: 9545
Joined: 22 Jun 1999 11:31

Re: India's Power Sector

Post by vijayk »

China and India are both pursuing thorium-based nuclear programs to leverage their vast thorium reserves (India has the world's largest, followed by China) as a sustainable alternative to uranium, aiming for energy security and reduced waste. China's approach centers on molten salt reactors (MSRs), which use thorium directly in a liquid fuel cycle for inherent safety and efficiency. India's strategy is a phased, indigenous three-stage program that indirectly incorporates thorium via fast breeder reactors (FBRs) to produce fissile uranium-233 (U-233), followed by advanced heavy water reactors (AHWRs) for thorium utilization. While China has made rapid progress with a prototype already operational, India's program is more evolutionary but faces delays due to technological complexities.

China

Prototype (TMSR-LF1, 2 MWth) achieved criticality in Oct 2023, full power in June 2024, and first-ever online refueling without shutdown in April 2025. Demonstrates continuous operation. Full-scale 10 MWe demonstration reactor under construction.
Prototype operational (2023-2025). Full-scale Gobi Desert plant construction starts 2025 (Gansu Province), criticality by 2030. Aims for commercial deployment post-2030.


India

Stage 1: 24 operational reactors (8.18 GW total). Stage 2: Prototype FBR (PFBR, 500 MWe) at Kalpakkam began core loading in 2024; facing "first-of-a-kind" delays but issues being resolved systematically as of Aug 2025. Stage 3: AHWR design ongoing with delays; experimental thorium tests at BARC show promise (e.g., small reactors powering districts with minimal fuel).

Stage 2 PFBR commissioning targeted for 2026 (delayed from earlier 2024 goal). Stage 3 AHWR prototype expected mid-2030s after FBR success. Overall thorium utilization after achieving 50 GW nuclear capacity (current ~8 GW).


Key Differences and Similarities

Direct vs. Indirect Path: China's MSR enables direct thorium use in a single reactor type, allowing quicker deployment and innovation in liquid fuel. India's FBR-centric approach requires sequential stages, making it more complex but tailored to bootstrap from limited uranium stocks.
Progress Speed: China is ahead, with a working prototype and refueling milestone in 2025, positioning it for near-term full-scale ops. India is steady but slower, with PFBR delays pushing thorium breeding to late 2020s.
Similarities: Both prioritize thorium for sustainability (abundant, less waste than uranium), national energy security, and reduced carbon emissions. They face shared R&D challenges like fuel reprocessing and safety certification.
Global Context: China's program revives U.S. MSR concepts abandoned in the 1970s, potentially leapfrogging Western efforts. India's is uniquely suited to its resource constraints, influencing international thorium collaborations.

Overall, China's MSR program is more advanced and disruptive, potentially setting a global standard by 2030, while India's three-stage FBR path offers a proven, scalable model for thorium-dominant nations despite setbacks.
Amber G.
BRF Oldie
Posts: 12452
Joined: 17 Dec 2002 12:31
Location: Ohio, USA

Re: India's Power Sector

Post by Amber G. »

Sharing:
MoS (Science and Tecnology) Article in ‘Times of India’

“Blue Economy is Our Frontier of Green Growth”.

-19 September 2025 issue
Image
A_Gupta
BRF Oldie
Posts: 15526
Joined: 23 Oct 2001 11:31
Contact:

Re: India's Power Sector

Post by A_Gupta »

I found this very informative. It explains how Indian solar projects work to make solar power competitive or more than competitive.
https://www.youtube.com/watch?v=j2y3DhrgjVc
Listen to Joseph Majkut, Director, Energy Security and Climate Change Program discuss CSIS's Greencycles Report with Dr. Shashwat Kumar, Fellow, Chair on India and Emerging Asia Economics and India's Morena Solar-Plus-Storage Project with Mr. Manu Srivastava, Additional Chief Secretary, New and Renewable Energy Department of the Government of Madhya Pradesh.
A_Gupta
BRF Oldie
Posts: 15526
Joined: 23 Oct 2001 11:31
Contact:

Re: India's Power Sector

Post by A_Gupta »

India’s largest hydropower project undergoes test run
Work on NHPC’s 2,000 MW Subansiri Lower Hydroelectric Project, straddling the Arunachal Pradesh-Assam border, was suspended between 2011 and 2019 due to protests
https://www.thehindu.com/news/national/ ... 201146.ece
One of the eight units of India’s largest hydropower project, which straddles the Arunachal Pradesh-Assam border, has begun undergoing a test run, signalling its commissioning soon.

Officials of the NHPC Limited said the wet commissioning of the first 250 megawatt unit of the 2,000 MW Subansiri Lower Hydroelectric Project was commenced on Friday (October 24, 2025).

....
The Subansiri Lower project, located at Gerukamukh on the inter-State boundary, was launched in January 2005. Work on the project was suspended in 2011 following protests by anti-dam activists in Assam and concerns over downstream environmental impacts.

The work resumed in October 2019 after the Prime Minister’s Office pushed for its completion, and the NHPC adopted enhanced mitigation and safety measures.
Wiki says: The Subansiri Lower Dam, officially named Subansiri Lower Hydroelectric Project (SLHEP), is an under construction gravity dam on the Subansiri River in North Eastern India. It is located 2.3 km (1.4 mi) upstream of Subansiri River in Arunachal Pradesh. Described as a run-of-the-river project by NHPC Limited, the project is expected to supply 2,000 MW of power when completed.
Amber G.
BRF Oldie
Posts: 12452
Joined: 17 Dec 2002 12:31
Location: Ohio, USA

Re: India's Power Sector

Post by Amber G. »

A_Gupta
BRF Oldie
Posts: 15526
Joined: 23 Oct 2001 11:31
Contact:

Re: India's Power Sector

Post by A_Gupta »

This is a GoI press release.
Capacity Addition Crosses 50,000 MW in FY 2025-26 (Up to 31st January 2026)
Over 11% added to total installed capacity in just 10 months
https://www.pib.gov.in/PressReleasePage ... g=3&lang=1
During the current financial year 2025–26 (up to 31st January 2026), a record 52,537 MW of generation capacity (from all sources) has been added . Of this, 39,657 MW has been added from Renewable Energy sources, which includes 34,955 MW of Solar Power, 4,613 MW of Wind Power.

This marks the highest ever capacity addition in a single year, surpassing the previous record of 34,054 MW achieved during FY 2024–25.
As on 31 January 2026, India’s total installed power generation capacity stands at 520,510.95 MW, comprising:

Fossil Fuel-Based Capacity: 248,541.62 MW
Non-Fossil Fuel Capacity: 271,969.33 MW
Nuclear: 8,780 MW
Renewable Energy Sources: 263,189.33 MW
sanjaykumar
BRF Oldie
Posts: 6795
Joined: 16 Oct 2005 05:51

Re: India's Power Sector

Post by sanjaykumar »

That’s more than Pakistan’s entire generation capacity. :eek:
Kakkaji
BRF Oldie
Posts: 3945
Joined: 23 Oct 2002 11:31

Re: India's Power Sector

Post by Kakkaji »

Power capacity under construction in India, official numbers:

https://economictimes.indiatimes.com/in ... aign=cppst
New Delhi: Around 6,600 megawatt nuclear capacity is under construction, and another 7,000 megawatt is under various stages of planning and approval, Power Minister Manohar Lal said on Thursday.

12,723.50 MW of hydroelectric projects are under construction.

Further, 4,274 megawatt (MW) of hydroelectric projects are under various stages of planning and targeted to be completed by 2031-32, he said in a written reply to the Lok Sabha.

In energy storage systems, 11,620 MW/69,720 MWh Pumped Storage Projects (PSPs) are under construction.

A total of 6,580 MW/39,480 MWh capacity of Pumped Storage Projects (PSPs) is concurred and yet to be taken up for construction.

Currently, 9,653.94 MW/ 26,729.32 MWh Battery Energy Storage System (BESS) capacity is under construction, and 19,797.65 MW/ 61,013.40 MWh BESS capacity are under tendering stage.

Minister of State for Power Shripad Naik informed the House that India added 52,536.49 MW installed generation capacity in the current financial year, FY 2025-26 (till January 2026).

As of January 31, the total installed generation capacity is 5,20,511 MW, of which the share of renewable energy sources was 2,63,189 MW (50.6 per cent).
Mukhi
BRFite -Trainee
Posts: 88
Joined: 12 Jul 2010 07:17

Re: India's Power Sector

Post by Mukhi »

A curious question to Gurus.

All those solar installations on individual homes, do they count towards total national capacity or not because they are paid by the home owner to ofset the use. ??
Amber G.
BRF Oldie
Posts: 12452
Joined: 17 Dec 2002 12:31
Location: Ohio, USA

Re: India's Power Sector

Post by Amber G. »

Mukhi wrote: 15 Mar 2026 08:25 A curious question to Gurus.

All those solar installations on individual homes, do they count towards total national capacity or not because they are paid by the home owner to ofset the use. ??
From what I know- rooftop solar does count toward national installed capacity, but there is a subtle statistical point that often causes confusion in energy discussions.

Rooftop solar is counted in national solar capacity: reported by MNRE:
->-Utility-scale solar parks +Commercial & industrial rooftop systems +Residential rooftop solar

All of these together make up India’s total solar installed capacity.

(who pays for the system makes no difference to how it is counted in national capacity statistics as long as it is physically installed and grid-connected)

The subtle statistical confusion (because rooftop solar is “behind the meter.”)
The confusion arises - the electricity is consumed directly in the home.

It never appears as electricity supplied by the grid.

As a result: It counts in installed capacity statistics. but it may not appear in grid electricity generation numbers.

So someone looking only at grid generation data might think solar output is smaller than it actually is.
This creates the some statistical confusion if not understood.
So.
Rooftop solar installations are included in India’s national solar capacity, even when paid for by homeowners, but much of their generation occurs behind the meter, which can make energy statistics look inconsistent if one only looks at grid-supplied electricity.