Air Force Tejas Mk1A: News & Discussions: 02 January 2022
Re: Air Force Tejas Mk1A: News & Discussions: 02 January 2022
https://x.com/ANI/status/1971203783603470413
Hal CMD saying firing trial will be over in OCT and first two aircraft will be handed over. In the grand scheme of things one month further delay is not going to matter much but there is no doubt in my opinion that HAL underestimated the challenge of integrating an aesa radar into existing radome and integrating new weapons.
Hal CMD saying firing trial will be over in OCT and first two aircraft will be handed over. In the grand scheme of things one month further delay is not going to matter much but there is no doubt in my opinion that HAL underestimated the challenge of integrating an aesa radar into existing radome and integrating new weapons.
-
- BRFite
- Posts: 976
- Joined: 17 Oct 2016 14:18
Re: Air Force Tejas Mk1A: News & Discussions: 02 January 2022
Bharadwaj wrote: ↑25 Sep 2025 19:21 https://x.com/ANI/status/1971203783603470413
Hal CMD saying firing trial will be over in OCT and first two aircraft will be handed over. In the grand scheme of things one month further delay is not going to matter much but there is no doubt in my opinion that HAL underestimated the challenge of integrating an aesa radar into existing radome and integrating new weapons.
I'd rather not take any CMDs statement as any type of commitment from HAL. [they simply lack ownership of their words]
Re: Air Force Tejas Mk1A: News & Discussions: 02 January 2022
Its not that Astra is not fired. It must have been done by now, if not for the failure and the need to change the code. If the next test also fails, indeed timeline will get extended or it will be done by that time. If they thought the safe option is the Israeli radar and that ended up as the problem, then its the lack of confidence of Babudom in indigenous systems that's delaying our program. Another is the GE engines.
Re: Air Force Tejas Mk1A: News & Discussions: 02 January 2022
https://www.youtube.com/watch?v=xFQ43e2rYxE
Mr Snehesh of Print claiming deliveries will only start end of first quarter 2026. But then he goes on a rant about the whole Tejas program so I have my doubts about his claims.
Mr Snehesh of Print claiming deliveries will only start end of first quarter 2026. But then he goes on a rant about the whole Tejas program so I have my doubts about his claims.
Re: Air Force Tejas Mk1A: News & Discussions: 02 January 2022
Ignore. Print is known for propaganda. The defense reporting will not be immune to this problem.Bharadwaj wrote: ↑25 Sep 2025 19:57 https://www.youtube.com/watch?v=xFQ43e2rYxE
Mr Snehesh of Print claiming deliveries will only start end of first quarter 2026. But then he goes on a rant about the whole Tejas program so I have my doubts about his claims.
-
- BRFite
- Posts: 751
- Joined: 05 Apr 2019 18:23
Re: Air Force Tejas Mk1A: News & Discussions: 02 January 2022
Break up of 97 order is 68 Single seaters and 29 twin seaters...
----
Mk1 is 32 S + 8T
1st Mk1A order is 73 S + 10T
2nd Mk1A order is 68 S + 29T (I expected it to be 89S + 8T)
That is total 32 Mk1 SingleSeaters, 141 Mk1A SingleSeaters and 47 TwinSeaters
----
Honestly, these numbers are confusing... I guess only IAF ppl know how they're planning to organize them into squadrons...
But one thing is true---> The high no. of Twin seaters would mean that Twin seaters might be used for combat roles as well, not as just trainers...
----
One possibility I see is how Rafales are organized ---> 18 jets per squadron with break-up of 14 Single + 4 Twin seaters...
If we put aside Mk1s order (32 S+8T), the break-up of Mk1A orders is 141 Single seaters + 39 Twin seaters, with total of 180 jets...
That is approximately 14 Single and 4 Twin seaters per squadron with total 10 squadrons of Mk1A jets...
----
Mk1 is 32 S + 8T
1st Mk1A order is 73 S + 10T
2nd Mk1A order is 68 S + 29T (I expected it to be 89S + 8T)
That is total 32 Mk1 SingleSeaters, 141 Mk1A SingleSeaters and 47 TwinSeaters
----
Honestly, these numbers are confusing... I guess only IAF ppl know how they're planning to organize them into squadrons...
But one thing is true---> The high no. of Twin seaters would mean that Twin seaters might be used for combat roles as well, not as just trainers...
----
One possibility I see is how Rafales are organized ---> 18 jets per squadron with break-up of 14 Single + 4 Twin seaters...
If we put aside Mk1s order (32 S+8T), the break-up of Mk1A orders is 141 Single seaters + 39 Twin seaters, with total of 180 jets...
That is approximately 14 Single and 4 Twin seaters per squadron with total 10 squadrons of Mk1A jets...
Re: Air Force Tejas Mk1A: News & Discussions: 02 January 2022
I don’t think this has anything to do with the radome sizeBharadwaj wrote: ↑25 Sep 2025 19:21 https://x.com/ANI/status/1971203783603470413
Hal CMD saying firing trial will be over in OCT and first two aircraft will be handed over. In the grand scheme of things one month further delay is not going to matter much but there is no doubt in my opinion that HAL underestimated the challenge of integrating an aesa radar into existing radome and integrating new weapons.
This is an integration issue between the EL/M-2052 and Astra. Whilst that is part of HAL’s role it is also more complex and involves DRDO, ELTA, CEMILEC etc etc
I just hope that they get this well out of the way with Uttam and because both are DRDO the integration process is much smoother of course will they then have the same issue with Meteor with the 97
Either way the main thing is production is ongoing and when the engine delivery issues and certification of weapons js complete they can hand over the aircraft within a few days/weeks
We’ve got exactly what we all wanted for a LONG time now- large upfront orders in a timely fashion for the LCA. A ~180 order backlog, it’s entirely over to HAL to place orders with their subcontractors and scale production accordingly- I believe they WILL do this, with a few teething issues a along the way but that is to be expected the world over
The deadline for all 83+97 seems to be FY2032-33 from which they want to commence MK.2 production so imaginary deadlines between here and then are immaterial as long as they meet that deadline
The engine supply will likely be the biggest constraint- perhaps the EL/M-2052 and then UTTAM down the road also but I’d expect to see 20-24/yr from 2027-28, a very respectable rate and hopefully straight into MK.2 with AMCA running in parallel (a few squadrons of Rafale thrown in maybe too)
Re: Air Force Tejas Mk1A: News & Discussions: 02 January 2022
They are planning to use the twin seater variant of Mk1A as the mother ship for the MUMT program (CATS). Hence many of these 29 will be used in that role. There may not be more than 2 trainers per Squadron of Tejas MK1/A.LakshmanPST wrote: ↑25 Sep 2025 23:40 Break up of 97 order is 68 Single seaters and 29 twin seaters...
----
Mk1 is 32 S + 8T
1st Mk1A order is 73 S + 10T
2nd Mk1A order is 68 S + 29T (I expected it to be 89S + 8T)
That is total 32 Mk1 SingleSeaters, 141 Mk1A SingleSeaters and 47 TwinSeaters
----
Honestly, these numbers are confusing... I guess only IAF ppl know how they're planning to organize them into squadrons...
But one thing is true---> The high no. of Twin seaters would mean that Twin seaters might be used for combat roles as well, not as just trainers...
----
One possibility I see is how Rafales are organized ---> 18 jets per squadron with break-up of 14 Single + 4 Twin seaters...
If we put aside Mk1s order (32 S+8T), the break-up of Mk1A orders is 141 Single seaters + 39 Twin seaters, with total of 180 jets...
That is approximately 14 Single and 4 Twin seaters per squadron with total 10 squadrons of Mk1A jets...
Re: Air Force Tejas Mk1A: News & Discussions: 02 January 2022
Astra Mk1 was tested and certified on the Tejas Mk1 aircraft which has another Israeli radar (EL/M-2032). The additional manufacturing line at Nashik will take the yearly production count to 30, as per certain reports. As long as IAF doesn't add more and more capabilities / additional weapon integrations, to the current Mk1A standard along with a steady stream of 2 engines from GE's stable for the next 2 years, we can count on 24 aircrafts per year for the next 2 years after which, if GE can increase the number of engines, 30 aircrafts per year shouldn't be a problem.KSingh wrote: ↑26 Sep 2025 02:00I don’t think this has anything to do with the radome sizeBharadwaj wrote: ↑25 Sep 2025 19:21 https://x.com/ANI/status/1971203783603470413
Hal CMD saying firing trial will be over in OCT and first two aircraft will be handed over. In the grand scheme of things one month further delay is not going to matter much but there is no doubt in my opinion that HAL underestimated the challenge of integrating an aesa radar into existing radome and integrating new weapons.
This is an integration issue between the EL/M-2052 and Astra. Whilst that is part of HAL’s role it is also more complex and involves DRDO, ELTA, CEMILEC etc etc
I just hope that they get this well out of the way with Uttam and because both are DRDO the integration process is much smoother of course will they then have the same issue with Meteor with the 97
Either way the main thing is production is ongoing and when the engine delivery issues and certification of weapons js complete they can hand over the aircraft within a few days/weeks
We’ve got exactly what we all wanted for a LONG time now- large upfront orders in a timely fashion for the LCA. A ~180 order backlog, it’s entirely over to HAL to place orders with their subcontractors and scale production accordingly- I believe they WILL do this, with a few teething issues a along the way but that is to be expected the world over
The deadline for all 83+97 seems to be FY2032-33 from which they want to commence MK.2 production so imaginary deadlines between here and then are immaterial as long as they meet that deadline
The engine supply will likely be the biggest constraint- perhaps the EL/M-2052 and then UTTAM down the road also but I’d expect to see 20-24/yr from 2027-28, a very respectable rate and hopefully straight into MK.2 with AMCA running in parallel (a few squadrons of Rafale thrown in maybe too)
Re: Air Force Tejas Mk1A: News & Discussions: 02 January 2022
https://x.com/SpokespersonMoD/status/19 ... 4282662040 ---> MoD signed a contract with @HALHQBLR for 97 LCA Mk1A aircraft (68 Fighters & 29 Twin Seaters) with associated equipment for the IAF at Rs 62,370 Cr (excl. taxes) under Buy (India-IDDM), today in New Delhi. The advanced LCA Mk1A integrates the Uttam AESA radar, Swayam Raksha Kavach and control actuators, with 64%+ indigenous content and 67 new indigenous items. Supported by 105 suppliers, the project will generate 11,750 jobs/year over six years. Deliveries will start in 2027-28, boosting IAF capability, Atmanirbhar Bharat & India’s defence preparedness.

Re: Air Force Tejas Mk1A: News & Discussions: 02 January 2022
VIDEO: https://x.com/AjayshreeSamby3/status/19 ... 1624823005 ---> Even if the engine is still running, the delivery doesn't happen, Sunil Bhai Sahab.
Re: Air Force Tejas Mk1A: News & Discussions: 02 January 2022
Rakesh wrote: ↑26 Sep 2025 07:05 VIDEO: https://x.com/AjayshreeSamby3/status/19 ... 1624823005 ---> Even if the engine is still running, the delivery doesn't happen, Sunil Bhai Sahab.
From what I understand the firing will happen shortly but there is certification work left to be done. Once firing and target destruction happens HAL can get MOD to force IAF to take the aircraft. Nothing wrong with that.